• Samstag, 28 Dezember 2024
  • 01:41 Uhr Frankfurt
  • 00:41 Uhr London
  • 19:41 Uhr New York
  • 19:41 Uhr Toronto
  • 16:41 Uhr Vancouver
  • 11:41 Uhr Sydney

Pro Minerals Inc.: Phase Two of Exploration Complete, Cairo Gold Project

23.09.2011  |  Marketwire
VANCOUVER, 09/23/11 - Pro Minerals Inc. (TSX VENTURE: PRM) is pleased to announce that the Company has completed Phase Two of exploration on its 100% owned Cairo Gold Project situated near Matachewan, Ontario. In this phase, a leading edge XDS VLF-EM airborne survey was flown over 570 line kilometres. The technology utilized high sensitivity and horizontal gradient magnetics. The survey was flown by Terraquest Ltd. at 100 metre intervals in two directions (north-south and east-west) to provide detailed information with respect to certain geological structures located on the claims.

Initial results indicate a number of high priority anomalies which the Company anticipates will correspond with available geological data. All results from the survey are now being carefully interpreted and will form the basis for an exploration program planned on the property.

Further, Pro Minerals has staked an additional four claims totaling 736 hectares (1,818 acres) claims represented the 'Whiskyjack' zone.

Pro Minerals' Cairo Gold Project is located approximately 46 kilometres west of Kirkland Lake, and and now totals an area of 2,450 hectares (6,128 acres). The Cairo Project is ideally situated just 5 kilometres northeast of the Young Davidson Mine, which was recently opened by Northgate Minerals Corporation. The Young Davidson currently has the 6th largest gold reserve in Canada, with 2.8 Million ounces of gold. The Cairo Gold Project and Young Davidson mine are both situated in the southwestern section of the Abitibi Greenstone Belt. The Abitibi is one of the largest greenstone belts in the world and host to 160 Million ounces of gold from both historic and present production. The Cairo Gold Project is easily accessible and close to infrastructure including rail, roads, water, power and labor force. Updated maps are available upon request or viewable at www.promineralsinc.com.

This press release has been reviewed by Dr. Christian Derosier, P. Geo., Consulting Geologist and Qualified Person for the Cairo Gold Project under National Instrument 43-101.

Additional information is contained on the Company's website at www.promineralsinc.com.


ON BEHALF OF THE BOARD OF DIRECTORS OF PRO MINERALS INC.

Patrick D. O'Brien
President



Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contacts:

Pro Minerals Inc.
Adrian Bakker
604-608-6168 or Toll Free: 1-877-663-6168
604-683-8903 (FAX)
info@promineralsinc.com
www.promineralsinc.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Pro Minerals Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.