• Freitag, 22 November 2024
  • 02:39 Uhr Frankfurt
  • 01:39 Uhr London
  • 20:39 Uhr New York
  • 20:39 Uhr Toronto
  • 17:39 Uhr Vancouver
  • 12:39 Uhr Sydney

Unity Stakes Milliken Lake Project, Athabasca Basin

27.09.2011  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 09/27/11 -- Unity Energy Corp. (TSX VENTURE: UTY) ('Unity' or the 'Company') is pleased to announce that it has acquired through staking a prospective uranium exploration property known as the Milliken Lake Property. The 1,941 hectare claim lies on the eastern edge of the Athabasca Basin, adjoining to the southeast, UEX's Hidden Bay and to the west Hathor's Milliken Creek Project. The project area has seen significant exploration activity, including an Aeroquest AeroTEM III time domain helicopter electromagnetic survey in 2005 (UEX) and boulder prospecting survey (Denison) in 2006. With this acquisition, Unity now controls eight quality uranium exploration projects (27,500 hectares) in the most productive region in the world.


Aeroquest's Mag/EM survey was successful at detecting a northeast trending moderately conductive anomaly, spanning approx. 4.5km of the Milliken Lake Project. The Milliken Conductor, which appears to be a subtle anomaly that may represent an alteration zone corresponding with a magnetic low, is the Company's primary exploration target at Milliken Lake. In 1997, Cameco tested a gravity anomaly in the northern portion of the Project, which was then part of the Park Creek Project. The unconformity was intersected at 97.4m (hole GL-1) and 87.95m (hole GL-2). Neither hole intersected alteration or mineralization; the holes were approximately one kilometer north of the Milliken Conductor.


The Company also covered the Milliken Lake Project in its 2011 VTEM survey; an interpretation on the results should be available in the near term.


Under the terms of the staking agreement, Unity must within four years, complete a minimum of $2,500,000 of exploration expenditures on the Project. A 1.5% NSR has also been granted to the arm's length staker, which can be purchased at any time for $1,500,000.


'The Company is very pleased to have been able to pick up such a prospective project with shallow targets in the heart of the Saskatchewan's uranium belt. We hope to be able to mirror UEX's success with their Hidden Bay Project and bring increased value to our shareholder faithful.'


Dr. Peter Born P.Geo., the Company's Qualified Person and Director, is responsible for the geological content in this news release.


To view a map of the Milliken Creek Project, please visit the following link: http://media3.marketwire.com/docs/uty927i.pdf.


For more information visit www.unityenergycorp.com.


On Behalf of the Board of Directors of Unity Energy Corp.


Anita Algie, B.Sc. Hon, President


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:

Unity Energy Corp.

Anita Algie

President

604-681-0004
www.unityenergycorp.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Bedford Metals Corp.
Bergbau
A3DZER
CA0762301012
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.