• Donnerstag, 04 Juli 2024
  • 18:29 Uhr Frankfurt
  • 17:29 Uhr London
  • 12:29 Uhr New York
  • 12:29 Uhr Toronto
  • 09:29 Uhr Vancouver
  • 02:29 Uhr Sydney

Yukon-Nevada Gold Corp. Winterization and Production Update for Jerritt Canyon, Nevada

31.10.2011  |  PR Newswire

VANCOUVER, Oct. 31, 2011 /PRNewswire/ - Yukon-Nevada Gold Corp.

is pleased to announce a production update for the third quarter and progress on the winterization of the milling facility at Jerritt Canyon located 50 miles north of Elko, Nevada. Jerritt Canyon is operated by Queenstake Resources USA Ltd., ('Queenstake') a wholly owned subsidiary of Yukon-Nevada Gold Corp. ('YNG' or the 'Company').

The Jerritt Canyon operation shipped 21,345 ounces of gold in Q3, comprised of 6,865 ounces in July, 7,195 ounces in August and 7,285 ounces in September.

Winterization and improvements of the milling facility at Jerritt Canyon are well underway and include installation of a new ore dryer, rebuilding the crushing circuit, construction of housing for the ore dryer, fine-crushing circuit conveyor reconfiguration, change-out of the Merrill-Crowe precipitation circuit with an electrowinning circuit, replacement of a quench tank, and improvements to the oxygen plant.

It is anticipated that all winterization and improvement projects will be completed by mid-December. Manufacturing of the new ore dryer encountered some delays, but shipping from the manufacturer started on October 25, 2011 and will be at site by mid-November 2011 and fully installed by mid-December, 2011. The fine crushing circuit is being rebuilt and will be fully enclosed from weather and fully operable by mid-December. The operation has continued to produce gold through the current construction by implementing work-arounds to the refurbishment activities. A shutdown period of around 10 days will be required, likely starting in late November.

Work on the new tailings storage facility ('TSF') is also progressing on schedule and on budget. In July 2011 the Company received regulatory approval to break ground and start construction of the new TSF. This new TSF will be state of art using two double lined impoundments: one for tailings solids and one into which tailings water will be decanted. This separation during operations is intended to provide greater stability to the tailings and reduce the time and costs for the ultimate closure and reclamation of the facilities. The TSF is also expandable and will be able to serve Jerritt Canyon many years into the future.

Earthworks on TSF water storage reservoirs are complete and installation of the double lining, piping and pumping systems is in progress. Installation of the double lining on the first water storage reservoir will be complete by the end of the October and work continues on double lining the second water storage reservoir. Earthworks on TSF are 95% complete and will be completed by the end of the month. Installation of the double lining, piping and pumping systems will be completed by August 2012 allowing use any time after when the first TSF reaches maximum capacity.

Chief Operating Officer, Randy Reichert states, 'We are in a good position to ramp up production at the milling facility now that mining has begun at the SSX-Steer underground mine and once the refurbishments are completed at the mill. We are confident that everything should be running smoothly going forward into the winter months at Jerritt Canyon. Our team worked long and hard to have everything finished before the winter sets in. With many years of experience developing and operating mines in arctic environments, I am confident that all refurbishment projects will be completed as planned even if winter sets in early.'

Please click here to view the latest photos from the construction of the TSF, ore dryer housing and underground equipment delivery:

http://www.yukon-nevadagold.com/s/JerrittCanyon.asp?ReportID=484780&_Type=Jerritt-Canyon&_Title=Project-gallery

This news release was reviewed and approved by the Company's COO, Randy Reichert, M.Sc. P.Eng., the Qualified Person under NI 43-101 for purposes of this release.

Yukon-Nevada Gold Corp. is a North American gold producer in the business of discovering, developing and operating gold deposits. The Company holds a diverse portfolio of gold, silver, zinc and copper properties in the Yukon Territory and British Columbia in Canada and in Nevada in the United States. The Company's focus has been on the acquisition and development of late stage development and operating properties with gold as the primary target. Continued growth will occur by increasing or initiating production from the Company's existing properties.

If you would like to receive press releases via email please contact nicole@yngc.ca and specify 'Yukon-Nevada Gold Corp. releases' in the subject line.

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

WARNING: The Company relies upon litigation protection for 'forward-looking' statements.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the 'U.S. Securities Act') or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

Yukon-Nevada Gold Corp.

CONTACT: Yukon-Nevada Gold Corp.

Richard Moritz

Senior Director, Institutional Investor Relations

Tel: (604) 688-9427

Email: rmoritz@yngc.ca



Nicole Sanches

Investor Relations Manager

Tel: (604) 688-9427 ext 224

Email: nicole@yngc.ca

www.yukon-nevadagold.com



CHF Investor Relations

Jeanny So

Director of Operations

Tel: (416) 868-1079 ext. 225

Email: jeanny@chfir.com

www.chfir.com



AXINO AG

Wolfgang Seybold

Chairman Tel: 49 711 25 35 92 40

Email: wolfgang.seybold@axino.de

www.axino.de/



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Veris Gold Corp.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.