• Freitag, 20 Dezember 2024
  • 23:40 Uhr Frankfurt
  • 22:40 Uhr London
  • 17:40 Uhr New York
  • 17:40 Uhr Toronto
  • 14:40 Uhr Vancouver
  • 09:40 Uhr Sydney

Niogold Reports Marban High Grade Western Zone returns 9.8 g/t Gold over 5.8 metres

16.11.2011  |  The Newswire
Val-d'Or, Quebec - November 16, 2011 - NioGold Mining Corporation (TSX-V: NOX) (“NioGold“) is pleased to report on the final drilling results of the first program conducted under the terms of the Aurizon Mines Ltd. (“Aurizon“) earn-in option on the Marban Block property, located in the Malartic gold camp, Abitibi region of Quebec. A $5-million second phase program has been initiated.

Results from the last 31 drill holes of the first phase program are included in this release, of which 14 of the holes are on the Marban deposit and 17 are step out holes that tested the area between the Marban and Norlartic deposits. Drill results are tabled on the following pages.


Drilling highlights include:

-An additional important near surface mineralised interval of 9.8 grams of gold per tonne (g/t Au) over 5.8 metres (MB‑11‑224) was obtained in the newly recognised Marban "High Grade Western Zone" (see news release dated September 19, 2011).

-Drilling within the Marban deposit continues to confirm the continuity of the mineralised zones near surface as well as their extension below the Marban mine. Six (6) of the fourteen (14) holes returned thick lower grade gold mineralised intervals with metal factors above 20 as well as higher grade intercepts, including 8.3 g/t Au over 4.6 metres (MB‑11-200) intersected at a vertical depth of 275 metres.

-An interval of 5.9 g/t Au over 3.6 metres (MB‑08‑056ext) was obtained at a vertical depth of 350 metres in the newly recognised Marban ‘Eastern Down Dip Zone'.

-Shallow Exploration fence drilling between the Norlartic and Marban deposits intersected gold mineralised intervals up to 600 metres east and along strike extent of the Norlartic deposit / Norbenite shear zone and within a newly recognised altered and mineralised felsic intrusive. Values of up to 10 g/t Au were returned.


Marban Deposit

The last series of drill holes on the Marban deposit were designed with the objective of extending the mineralised areas previously identified during this first phase program. The drill grid covered a lateral extension of 1.4 kilometres at 50-metre section spacing.

The Marban mineralised system has a funnel shape corresponding to a 400- to 700-metre wide folded structure in the upper part and a more steeply dipping root at depth, with thicknesses in the range of 100 to 200 metres. Mineralised zones and structures are developed in a strongly chloritized and schistose basalt. Gold grades typically correlate with an increasing density of quartz veining associated with disseminated pyrite. The hanging wall and footwall are composed mainly of ultramafic units.

Drilling from surface down to 250 metres:

- The gold bearing parallel structures forming the deposit hanging wall have been intersected by holes MB-11 200, 214, 240, 246 and 247 with hole MB-11-200 having the best result of 1.8 g/t Au over 15.4 metres. The mineralised lens identified is included inside a corridor extending 100 metres along strike and approximately 100 metres from previous mine workings.

- Drilling within the central part of the Marban deposit continues to confirm extensions of the main mineralised areas. The three holes (MB-11-200, 214 and 222) tested the Marban deposit at a vertical depth of approximately 250 metres. The holes intersected mineralisation at distances varying from 25 metres to 120 metres from the previous mine workings.

- Hole MB-11-224 filled a gap and confirmed the grade and thickness of one section in the Western High Grade Zone, returning values of 9.8 g/t Au over 5.8 metres and 6.6 g/t Au over 3.5 metres.


Drilling below 250 metres:

- The Eastern Down Dip Zone was tested on a wide spacing with the extension of two holes and two new holes. The results obtained show consistent gold values with a possible connection 200 metres westward with the Marban deposit itself. The orientation and plunge of the structure will be analysed with a view to target possible mineralised extensions.


Step out drilling

Three 300-metre spaced continuous NE-SW oriented exploration drill hole fences were completed between the Norlartic and Marban deposits. The fences consist of 18 shallow drill holes, for a total of 4,663.7 metres. Results were previously released for hole NL-11‑046.


Highlight from the westernmost fence:

- Hole NL-11‑046 cut a mineralised interval that returned values averaging 1.23 g/t Au over 21.2 metres at 70 metres vertical depth and on strike and 30 metres to the east of the Norlartic resources.


Highlights of the central fence:

-Hole MB‑11‑208 collared into a wide mineralised zone interpreted to represent the southeast extension of Norlartic deposit / Norbenite shear zone. The zone returned a best value of 10 g/t Au.

- Further south, holes MB‑11‑206 and 207 intersected a thick felsic intrusive containing sulphide mineralisation over 23 and 26 metres, respectively. Hole 207 returned the best gold values averaging 0.7 g/t Au over 25.9 metres including 7.4 g/t Au over 2.1 metres.


Highlights of the easternmost fence:

- Holes MB‑11‑212 and 213 collared into a wide mineralised zone interpreted to represent the southeast extension of Norbenite shear zone. The zone returned a best interval of 7.5 g/t Au over 1.5 metre;

- Hole MB‑11‑210 intersected an thick mineralised felsic intrusive possibly correlating with the one cut in holes MB‑11-206 and 207 of the central fence. The intrusive returned gold values averaging 1.0 g/t Au over 13.1 metres.


First phase program

The first phase program commenced on August 30, 2010, and was completed on August 9, 2011. The program consisted of 50,253 metres of diamond drilling (170 holes, 8 extensions) at a total cost of $6 million. Drilling was distributed between the Marban (41,270m) and Norlartic (4,319m) deposits and exploration drill hole fences between the two deposits (4,664m). Highlights include the identification of two new gold zones surrounding the former Marban mine named the 'High Grade Western Zone' and 'Eastern Down Dip Zone'. Results were released for all holes drilled to date.


Second phase program

As reported on November 1, the $5-million second phase program will include 34,000 metres of diamond drilling on the Marban deposit, updated resource estimates and basic technical studies. Drilling and technical work are expected to commence in November 2011 and will continue through to the second quarter of 2012.


Aurizon Option

Aurizon can earn up to a 65% interest the Marban Block property under the terms of an option and joint venture agreement dated July 5, 2010 between NioGold and Aurizon. The initial 50% interest can be earned by incurring expenditures of C$20 million over three years, completing an updated NI 43-101 compliant mineral resource estimate, and by making a resource payment for 50% of the total gold ounces defined by the mineral resource estimate. NioGold is the project operator during the initial earn-in period (see news release dated July 6, 2010).

--------------------------------------------------------------------------------
|Drill Results – Marban Deposit |
|------------------------------------------------------------------------------|
|Hole |Line|Station|Azimuth|Dip |Length|From |To ? |Length|Grade|Zone(s)|
| | | | | |(m) |? |? ? |(m) |? | |
| | | | | | |? |? ? | |? | |
| | | | | | |? |(m) | |? | |
| | | | | | |? | | |? | |
| | | | | | |? | | |? | |
| | | | | | |? | | |?(g/t| |
| | | | | | |? | | |Au) | |
| | | | | | |(m) | | | | |
| |
|------------------------------------------------------------------------------|
|MB-08-056ext|2+50|1+00 N |N180? |-63?|474.0 |348.0|370.0|22.0 |1.5 |C1-A |
| |E | | | | | | | | | |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |348.6|360.7|12.1 |1.8 |C1 |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |367.9|369.0|1.1 |6.8 |A |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |402.2|405.8|3.6 |5.9 |T |
|------------------------------------------------------------------------------|
|MB-08-078ext|2+50|1+55 N |N180? |-63?|548.0 |366.7|368.7|2.0 |5.1 |? |
| |E | | | | | | | | | |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |401.3|402.5|1.2 |7.1 |C1 |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |422.9|428.9|6.0 |1.2 |A |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |452.3|453.0|0.7 |4.0 |T |
|------------------------------------------------------------------------------|
|MB-11-200 |0+25|2+15N |N180? |-45?|450.2 |209.6|225.0|15.4 |1.8 |2 |
| |W | | | | | | | | | |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |213.0|214.0|1.0 |6.3 |2 |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |223.0|224.0|1.0 |12.6 |2 |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |277.0|281.0|4.0 |3.4 |E |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |332.3|333.3|1.0 |7.4 |D1 |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |361.4|378.0|16.6 |1.8 |C1-C2 |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |372.4|375.4|3.0 |6.1 |C1 |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |395.8|400.4|4.6 |8.3 |A |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |399.3|400.4|1.1 |30.5 |A |
|------------------------------------------------------------------------------|
|MB-11-214 |0+50|3+05N |N180? |-60?|555.0 |294.0|303.4|9.4 |1.6 |Y |
| |E | | | | | | | | | |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |384.5|386.5|2.0 |4.5 |D1 |
|------------------------------------------------------------------------------|
|MB-11-218 |6+00|1+00 N |N180? |-55?|200.0 |No significant value |
| |W | | | | | |
|------------------------------------------------------------------------------|
|MB-11-222 |0+00|2+60 N |N180? |-55?|522.0 |319.6|355.6|36.0 |1.0 |D1-B-C2|
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |337.2|339.3|2.1 |5.0 |D1 |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |349.6|350.8|1.2 |5.0 |D1 |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |438.4|442.8|4.4 |4.8 |C1 |
|------------------------------------------------------------------------------|
|MB-11-224 |4+00|0+46 S |N180? |-51?|192.0 |29.6 |35.4 |5.8 |9.8 |Y |
| |W | | | | | | | | | |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |94.1 |97.6 |3.5 |6.6 |E |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |94.1 |95.0 |0.9 |21.1 |E |
|------------------------------------------------------------------------------|
|MB-11-227 |4+50|5+50 S |N180? |-45?|345.0 |No significant value |
| |E | | | | | |
|------------------------------------------------------------------------------|
|MB-11-237 |7+00|0+25 N |N180? |-62?|582.0 |223.8|229.8|6.0 |1.2 |? |
| |E | | | | | | | | | |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |416.4|422.4|6.0 |2.0 |W |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |504.8|507.0|2.2 |2.0 |T |
|------------------------------------------------------------------------------|
|MB-11-238 |7+00|0+60 S |N180? |-45?|359.0 |256.4|260.0|3.6 |2.0 |W-V-M |
| |E | | | | | | | | | |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |257.6|258.8|1.2 |4.3 |W-V-M |
|------------------------------------------------------------------------------|
|MB-11-239 |8+00|0+00 |N180? |-60?|627.0 |356.8|362.2|5.4 |1.0 |C1 |
| |E | | | | | | | | | |
|------------------------------------------------------------------------------|
|MB-11-241 |4+50|0+55 N |N180? |-70?|528.0 |249.9|261.0|11.1 |0.9 |? |
| |E | | | | | | | | | |
|------------------------------------------------------------------------------|
|? |? |? |? |? |? |467.0|468.1|1.1 |12.2 |T |
|------------------------------------------------------------------------------|
|MB-11-246 |0+00|2+85 N |N180? |-61?|519.0 |19.7 |31.6 |11.9 |0.7 |? |
|------------------------------------------------------------------------------|
|MB-11-247 |1+00|2+00 S |N180? |-55?|150.0 |85.1 |101.8|16.7 |1.8 |T |
| |E | | | | | | | | | |
|------------------------------------------------------------------------------|
|? |? |? |? |? |incl |87.8 |90.2 |2.4 |7.7 |T |
--------------------------------------------------------------------------------


--------------------------------------------------------------------------
|Drill Results – Exploration Fences |
|------------------------------------------------------------------------|
|Hole |Azimuth|Dip |Length|From |To ? |Length|Grade|Description |
| | | |(m) |? |? ? |(m) |? | |
| | | | |? |? ? | |? | |
| | | | |? |(m) | |? | |
| | | | |? | | |? | |
| | | | |? | | |? | |
| | | | |? | | |?(g/t| |
| | | | |? | | |Au) | |
| | | | |(m) | | | | |
| |
|------------------------------------------------------------------------|
|NL-11-050|N210? |-45?|204.0 |167.4|168.6|1.2 |1.91 |Granodiorite Py |
|------------------------------------------------------------------------|
|NL-11-051|N210? |-45?|201.0 |96.2 |97.8 |1.6 |0.99 |Int. |
| | | | | | | | |dike/Granodiorite|
| | | | | | | | |Py |
| | | | | | | | |Qz veins |
|------------------------------------------------------------------------|
|? |? |? |? |117.8|128.1|10.3 |0.22 |Granodiorite |
| | | | | | | | |Py Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|MB-11-201|N210? |-45?|204.0 |108.9|111.0|2.1 |0.45 |Sheared |
| | | | | | | | |basalt Py |
| | | | | | | | |Po Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|MB-11-202|N210? |-45?|201.0 |104.7|107.6|2.9 |0.28 |Sheared basalt |
| | | | | | | | |Py Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|MB-11-203|N210? |-45?|204.7 |91.6 |93.8 |2.2 |0.13 |Granodiorite |
| | | | | | | | |silicified Py |
|------------------------------------------------------------------------|
|MB-11-204|N210? |-45?|555.0 |53.5 |58.1 |4.6 |0.37 |Granodioritic |
| | | | | | | | |dike Py |
|------------------------------------------------------------------------|
|MB-11-205|N210? |-45?|368.0 |29.9 |35.0 |5.1 |0.47 |Granodioritic |
| | | | | | | | |dike Py |
|------------------------------------------------------------------------|
|MB-11-206|N210? |-45?|200.0 |47.1 |70.0 |22.9 |0.25 |Felsic dike Py |
|------------------------------------------------------------------------|
|MB-11-207|N210? |-45?|200.0 |152.1|178.0|25.9 |0.72 |Felsic dike Py |
|------------------------------------------------------------------------|
|? |? |? |incl |174.9|177.0|2.1 |7.37 |Felsic dike |
| | | | | | | | |Py Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|MB-11-208|N210? |-45?|200.0 |28.6 |29.1 |0.5 |10.05|Dioritic dikes |
| | | | | | | | |Py Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|? |? |? |? |30.5 |33.9 |3.4 |1.17 |Dioritic dikes |
| | | | | | | | |Py Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|MB-11-209|N210? |-45?|203.0 |191.6|198.7|7.1 |0.30 |Ultramafic |
| | | | | | | | |rocks |
| | | | | | | | |Py/Granodiorite |
| | | | | | | | |Py |
|------------------------------------------------------------------------|
|MB-11-210|N210? |-45?|206.0 |79.5 |92.6 |13.1 |1.02 |Granodioritic |
| | | | | | | | |dike Py |
|------------------------------------------------------------------------|
|? |? |? |incl |86.6 |89.6 |3.0 |3.15 |Granodioritic |
| | | | | | | | |dike Py |
|------------------------------------------------------------------------|
|MB-11-211|N210? |-45?|275.0 |112.3|115.4|3.1 |0.66 |Intermediate |
| | | | | | | | |dike |
| | | | | | | | |Py Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|MB-11-212|N210? |-45?|200.0 |195.0|196.2|1.2 |0.94 |Granodiorite Py |
|------------------------------------------------------------------------|
|MB-11-213|N210? |-45?|263.0 |167.5|169.0|1.5 |7.54 |Dioritic |
| | | | | | | | |dikes Py |
| | | | | | | | |Po Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|? |? |? |? |188.9|191.9|3.0 |2.41 |Dioritic dikes |
| | | | | | | | |Py Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|MB-11-243|N210? |-45?|395.0 |315.3|320.0|4.7 |0.75 |Intermediate |
| | | | | | | | |dike |
| | | | | | | | |Py Qz |
| | | | | | | | |veins |
|------------------------------------------------------------------------|
|MB-11-244|N210? |-45?|380.0 |157.8|158.3|0.5 |4.60 |Dioritic Dike |
| | | | | | | | |Py Qz |
| | | | | | | | |veins |
--------------------------------------------------------------------------


Technical Info, QA/QC and Qualified Persons

Reported intervals are in core lengths but are anticipated to approximate true width, except where structural complexities occur, as the holes were drilled near perpendicular to the principal local structural orientation.

Diamond drill holes were drilled with NQ-size core in order to obtain larger sample volumes of the mineralised zones, except for holes that traversed underground workings which were completed using BQ-size core. The core was sealed delivered by the drilling contractor to NioGold's facilities located at the Norlartic mine site. The core was photographed for reference, logged and mineralised sections were sawed in half. Sample lengths vary between 0.5 to 1.5 metres. Half core samples were bagged, sealed and delivered to ALS Chemex in Val-d'Or, Quebec, an accredited laboratory. The remaining core is stored on site for reference. Samples were assayed by the fire-assay method using an atomic absorption finish on a 50-gram pulp split. A quality assurance and quality control program (QA/QC) was implemented by NioGold and the laboratory to insure the precision and reproducibility of the analytical method and results. The QA/QC program includes the insertion of standards, blanks and field duplicates in the sample batches sent to the laboratory and a systematic re-assaying of samples returning values above 2 g/t Au by the fire-assay method using a gravimetric finish. As well, pulps grading above 0.5 g/t Au are sent to Bourlamaque Assay Laboratories Ltd. in Val-d'Or for check assaying.

The drilling program is conducted under the supervision of Yan Ducharme, M.Sc., P.Geo. (OGQ), the Company's Exploration Manager and a Qualified Person as defined by National Instrument 43-101. This news release was prepared by Rock Lefran?ois, P.Geo. (OGQ), the Company's President and a Qualified Person as defined by National Instrument 43-101.


NioGold Mining Corporation - - On Canada's Golden Highway - -

NioGold Mining Corporation is a mineral exploration company focused on GOLD. The Company's flagship projects are located in the Cadillac - Malartic - Val-d'Or stretch of the prolific Abitibi gold mining district, Province of Quebec, Canada. The Cadillac, Malartic and Val-d'Or mining camps have produced over 45 million ounces of gold since the 1930's and presently encompasses seven producing gold mines and a major mine development project (Canadian Malartic, Osisko Mining). NioGold's land holdings within the Abitibi presently cover 125 km2 and encompass three former gold producers, namely the Norlartic, Kierens (First Canadian), and Marban mines that collectively produced 600,000 ounces of gold. NioGold has outlined Indicated resources of 598,000 ounces gold and Inferred resources of 361,000 ounces gold in and around these deposits.

NioGold's experienced and qualified technical team will ensure the successful advancement of the Company's projects towards the highest quality mineral resources. NioGold invites you to visit the company website at www.niogold.com.



For information on NioGold Mining Corporation contact:

NioGold Mining Corp.
Michael A. Iverson, Chairman & CEO
miverson@niogold.com
Tel: (604) 856-9887

Dale Paruk, Vice-President
dparuk@niogold.com
Tel: (604) 662-4505
Toll-free: (877) 642-6200


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.


FOWARD-LOOKING STATEMENTS

This news release includes forward-looking statements that are subject to risks and uncertainties. All statements within, other than statements of historical fact, are to be considered forward looking. There can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties.

CAUTIONARY NOTE TO U.S. INVESTORS

Copyright (c) 2011 Thenewswire.ca - All rights reserved.
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
NioGold Mining Corp.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.