• Dienstag, 23 Juli 2024
  • 06:23 Uhr Frankfurt
  • 05:23 Uhr London
  • 00:23 Uhr New York
  • 00:23 Uhr Toronto
  • 21:23 Uhr Vancouver
  • 14:23 Uhr Sydney

ABM Resources NL (ASX:ABU) Lake Mackay Phase 1 Gold and Copper Drill Results

24.11.2011  |  ABN Newswire

09:56 AEST Nov 24, 2011 ABN Newswire (C) 2004-2011 Asia Business News PL. All Rights Reserved.






Sydney, Australia (ABN Newswire) - ABM Resources NL (ASX:ABU) is pleased to present drill results from the Company's recent scout exploration drilling program at its Lake Mackay Regional Prospects.

Tekapo Prospect confirmed gold and copper mineralisation including:
- 26 metres averaging 2.22g/t gold (0.3g/t cut-off) from 28 metres
down hole including:
- 18 metres averaging 3.05g/t gold (1.0g/t gold cut-off).
- 17 metres averaging 0.25% copper from 17 metres down hole.

Manapouri Prospect - first evidence of gold present in system with:
- 1 metre grading 5.61g/t gold from 234 metres.

Darren Holden, Managing Director of ABM Resources said, 'Alongside ABM's advanced Twin Bonanza Gold Camp Project (including the Buccaneer Porphyry, Cypress Zone, Caribbean Zone and the Old Pirate discoveries) ABM is committed to regional exploration across its land holdings. The Lake Mackay region is one of the most underexplored mineral belts in Australia and ABM's first drilling program in the Lake Mackay area has confirmed the presence of gold and copper mineralisation. We look forward to following up on these very encouraging scout drill results shortly.'

2011 Lake Mackay drill program

During 2011 ABM conducted a scout reverse circulation drilling program on various projects at Lake Mackay. The drilling consisted of 16 holes averaging 267 metres depth for a total 4,279 metres of drilling. Drilling included testing several conceptual geophysical targets as well as near surface / oxide geochemical anomalies identified by previous explorers.

Tekapo Prospects

In the 2011 program ABM tested several conceptual targets in the Tekapo Prospect area including the 1,200 metre by 600 metre Tekapo 1 Prospect. Several of the holes did not reach target depth due to high influxes of water. However, most holes at Tekapo intersected widespread anomalous mineralisation with the best results of 26 metres averaging 2.22g/t gold including 18 metres averaging 3.05g/t gold. The peak value was 9.7g/t gold over 1 metre. In addition copper mineralisation was also intersected with 17 metres averaging 0.25% copper. The evidence of both copper and gold mineralisation is highly encouraging in this region and the Company is intending to apply various other targeting techniques including geophysics to follow this up. Refer Appendix 1 for full details.

Mineralisation at Tekapo is hosted in schists and dolerites.

About the Lake Mackay Project Area

ABM holds approximately 8,000 square kilometres of exploration licenses and exploration license applications in the area to the east of Lake Mackay in the Northern Territory. The projects are located approximately 400 kilometres west of Alice Springs and are accessible by road via the town of Nyirripi.

The Lake Mackay project areas consist of Proterozoic sediments and intrusions and has only had a minor amount of previous exploration work consisting of widely spaced shallow drilling and surface reconnaissance along with aeromagnetic and gravity geophysical surveys. Previous work identified large metal anomalies including gold and copper as well as other pathfinder elements such as bismuth, arsenic, antimony and cobalt.

View the full Announcement:
http://media.abnnewswire.net/media/en/docs/ASX-ABU-568211.pdf



About ABM Resources NL:

ABM Resources (ASX:ABU) is a mineral exploration company focused on gold and gold/copper discovery in the Tanami-Arunta regions of the Northern Territory, Australia. The Company is one of the largest exploration license/license application holders in Australia. The Company has an aggressive exploration approach and is well funded for multiple target testing with multiple rigs in 2011.



Source:

ABM Resources NL



Contact:

Jutta Zimmermann 
CFO / Company Secretary
TEL: 61-8-9423-9777

Darren Holden
Managing Director
TEL: 61-8-9423-9777

Berdine Mastaglia
Investor Relations Manager
TEL: 61-8-9423-9777


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Prodigy Gold NL
Bergbau
A2JMPV
AU0000012494

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.