Great Basin Gold announces preliminary fourth quarter and full year 2011 operating results

06.02.2012  |  CNW

VANCOUVER, Feb. 6, 2012 /CNW/ - Great Basin Gold Limited ('Great Basin Gold' or the 'Company'),

reports preliminary unaudited fourth quarter and full year 2011 operating results.

Hollister, Nevada Operations


____________________________________________________________________
| | Quarter ended | | Year ended | |
| |__________________| |_____________________| |
| |Dec 31 | Sept 30 | | Dec 31 | Dec 31 | |
| | 2011 | 2011 | | 2011 | 2010 | |
| | | |Variance| | |Variance|
|_________|_______|__________|________|__________|__________|________|
|Ore |22,431 | 26,474 | (15%) | 96,030 | 89,613 | 7% |
|tonnes to| | | | | | |
|surface | | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Contained|21,773 | 23,811 | (9%) | 101,764 | 109,255 | (7%) |
|Au eqv oz| | | | | | |
|extracted| | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Contained| 0.81 |0.75 (24.3| 8% |0.90 (29.0|1.17 (37.6| (23%) |
|average | (26.2 | g/t) | | g/t) | g/t) | |
|grade Au | g/t) | | | | | |
|oz/ton | | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Contained| 6.22 | 6.74 | (8%) | 7.41 | 7.08 | 5% |
|average |(200.1 | (216.8 | | (238.2 | (227.6 | |
|grade Ag | g/t) | g/t) | | g/t) | g/t) | |
|oz/ton | | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Tonnes |24,328 | 29,869 | (19%) | 98,068 | 116,029 | (16%) |
|processed| | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Recovered|18,552 | 22.701 | (18%) | 86,444 | 88,149 | (2%) |
|Au oz | | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Recovered|101,487| 156,030 | (35%) | 521,099 | 448,353 | 16% |
|Ag oz | | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Recovered|20,727 | 26,045 | (20%) | 97,610 | 95,186 | 3% |
|Au eqv oz| | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Recovery | 92% | 92% | - | 92% | 82% | 12% |
|% Au | | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Recovery | 70% | 74% | (5%) | 72% | 60% | 20% |
|% Ag | | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Au eqv oz|17,603 | 22,790 | (23%) | 92,239 | 88,789 | 4% |
|sold | | | | | | |
|_________|_______|__________|________|__________|__________|________|
|Cash cost| 783 | 665 | (18%) | 674 | 740 | 9% |
|per Au | | | | | | |
|eqv oz | | | | | | |
|produced | | | | | | |
|(US$) | | | | | | |
|_________|_______|__________|________|__________|__________|________|




The Nevada operations produced 20,727 Au eqv ounces(1) from trial mining activities during the quarter (Q3 2011: 26,045 Au eqv ounces) and 97,610 Au eqv oz for the full year of production (2010: 95,186 Au eqv oz), compared to an average annual forecast of 100,000 Au eqv oz for the year. A similar performance is expected in 2012. As previously indicated, the high grade nature of the Hollister ore body can lead to quarterly grade fluctuations, and this occurred in this quarter.  The Au eqv grade increased by 8% from 0.75 oz/t (24.3 g/t) in Q3 2011 to 0.81 oz/t (26.2 g/t) in Q4 2011.

Fiscal 2011 was the first year that all material extracted from trial mining activities was processed at our Esmeralda mill, which showed a marked improvement in Au recovery from 2010, increasing from 82% to 92%. As the performance of the acid wash and carbon regeneration system, which was commissioned during November 2011, has not yet reached planned levels, the mill continued with the process of replacing carbon on a continuous basis and this impacted the amount of Au eqv oz sold as well as the cash costs reported for the quarter. In an effort to mitigate the time delay in recognizing produced metal as revenue and the insufficient capacity of local refiners, a shipment of loaded carbon was sent to Rand Refinery in South Africa in late December at an additional cost of approximately US$35 per Au eqv oz. Notwithstanding the quarterly increase in cash costs, the year-on-year cash costs decreased by 9% to US$674 per Au eqv oz which is only marginally above the 2011 forecast of US$650 per Au eqv oz.

Burnstone, South Africa Operations


____________________________________________________________________
| | Quarter | Quarter | | Year |
| |ended Dec 31| endedSept 30 | | ended Dec 31 |
| | 2011 | 2011 |Variance| 2011 |
|______________|____________|_______________|________|_______________|
|Ore | | 2,786 | | 8,402 |
|development | | | | |
|(meters) | 2,900 | | 4% | |
|______________|____________|_______________|________|_______________|
|Waste | | 1,403 | | 6,441 |
|development | | | | |
|(meters) | 1,083 | | 23% | |
|______________|____________|_______________|________|_______________|
|Stoping | | 7,408 | | 22,943 |
|(square | | | | |
|meters) | 6,653 | | (10%) | |
|______________|____________|_______________|________|_______________|
|Stoping square| | 5,090 | | 7,205 |
|meters | | | | |
|available | 7,205 | | 42% | |
|______________|____________|_______________|________|_______________|
|Ore tonnes to | | 138,158 | | 499,309 |
|surface - | | | | |
|development | 126,282 | | (9%) | |
|______________|____________|_______________|________|_______________|
|Ore tonnes to | | 24,379 | | 80,472 |
|surface - | | | | |
|stoping | 21,007 | | (14%) | |
|______________|____________|_______________|________|_______________|
|Ore tonnes to | | 162,537 | | 579,781 |
|surface - | | | | |
|total | 147,289 | | (9%) | |
|______________|____________|_______________|________|_______________|
|Contained Au | | 3,451 | | 13,845 |
|oz extracted -| | | | |
|development | 4,468 | | 30% | |
|______________|____________|_______________|________|_______________|
|Contained Au | | 2,705 | | 7,609 |
|oz extracted -| | | | |
|stoping | 2,423 | | (10%) | |
|______________|____________|_______________|________|_______________|
|Contained Au | | 6,156 | | 21,454 |
|oz extracted -| | | | |
|total | 6,891 | | 12% | |
|______________|____________|_______________|________|_______________|
|Contained | |0.02 (0.80 g/t)| |0.03 (0.89 g/t)|
|average grade | | | | |
|Au eqv oz/ton | 0.04 (1.14 | | | |
|- development | g/t) | | 43% | |
|______________|____________|_______________|________|_______________|
|Contained | |0.11 (3.57 g/t)| |0.09 (3.04 g/t)|
|average grade | | | | |
|Au eqv oz/ton | 0.12 (3.71 | | | |
|- stoping | g/t) | | 4% | |
|______________|____________|_______________|________|_______________|
|Contained | |0.04 (1.22 g/t)| |0.04 (1.19 g/t)|
|average grade | | | | |
|Au eqv oz/ton | 0.05 (1.50 | | | |
|- total | g/t) | | 23% | |
|______________|____________|_______________|________|_______________|
|Tonnes milled | 160,762 | 209,224 | (23%) | 775,524 |
|______________|____________|_______________|________|_______________|
|Recovered Au | | 6,486 | | 23,361 |
|oz | 6,470 | | - | |
|______________|____________|_______________|________|_______________|
|Recovery % Au | 89% | 89% | - | 88% |
|______________|____________|_______________|________|_______________|
|Au oz sold | 7,058 | 6,518 | 8% | 21,989 |
|______________|____________|_______________|________|_______________|
|Cash cost per | | 2,345 | | 1,780 |
|Au oz produced| | | | |
|(US$) | 1,793 | | 24% | |
|______________|____________|_______________|________|_______________|




The production ramp up at Burnstone continued, with ore development meters increasing by 4% from 2,786 metres in Q3 2011 to 2,900 metersin Q4 2011.  Quarter-on-quarter, the square meters of stoping available increased by 42%.  With the improved information on geological structures being applied to planned development, waste development meters per quarter decreased by 48% from levels reported in Q1 2011 to 1,083 meters in Q4 2011.

Since intersecting an 80 meter graben fault in Q1 2011, in-fill drilling comprising 19,051 meters from surface and 7,966 meters from underground was completedto January 31, 2012, increasing confidence in the 24 to 30 months mine plan.  No significant faults were intersected over this period. In-fill drilling will continue over the medium to longer term.

Quarter-on-quarter, ore development rates and production from stoping were however less than plan due to the impact of the December 2011 Christmas break as well as underground flooding of a number of development ends through fissures following an unusually high seasonal rainfall In December 2011. Permanent water reticulation infrastructure is under construction for completion in Q2 2012, with interim measures implemented to manage the water balance in the short term.

The combined development and stoping contained mined grade improved by 23% from 1.22 g/t in Q3 2011 to 1.50 g/t; this was the result of more low profile ore development than high profile ore development having occurred during the period. Total Au production for the year came to 23,361 Au ounces, approximately 6,000 Au ounces less than the revised guidance. Although we are looking forward to a continued improved year on year performance at Burnstone, we will continue to examine production guidance in the light of our experiences in 2011.

The Metallurgical Plant continued to perform in-line with expectations, with the decrease in processed tonnage being a result of the lower values of ore tonnes hoisted from underground. Cash production costs reduced by 24% to US$1,793/Au oz and by 11% to US$70 per tonne (Q3 2011: US$2,345 per Au oz and US$79 per tonne). Cash costs are still impacted by the low average grade of ore resulting from the high ratio of development ore to stoping material being processed as well as the lower volumes than planned from stoping being mined and processed. Improvements are expected as the grade increases to the average reserve grade of the ore body and production nears steady state levels.

Other Corporate Updates

Of the total US$150 million restructured Term facility, the Company has drawn US$130 million with the proceeds used to settle the principal due on Term Loan 1 and the standby-facility.  As at December 31,( )2011, the remaining proceeds plus remaining funds available under this facility and near term cash sources amounted to approximately $54 million in available cash resources. 

On January 25, 2012 the Department of Water Affairs granted a water licence that authorises the completion of the 88 kV power line between the Grootvlei power station and the Burnstone mine that will provide a permanent feed of 51 MVA power to site. The authorization also allows for the completion of a second line that will provide security of supply to the mine.

On a corporate note, Mr H. Wayne Kirk, has resigned as a non-executive independent director of the Company for personal reasons, with an effective date of January 30, 2012.  The Board wishes to thank Wayne for his services over the past 7 years.

The Company intends to release its financial results for the year ended December 31, 2011 by the end of March  2012, at which time the production and financial position guidance for 2012 will be updated.

President and CEO Ferdi Dippenaar commented: 'Whilst our Nevada operations returned a much improved performance compared to 2010, our Burnstone Mine continues to face challenges in its production build-up programme.  The focus will be on improving the ore development rate required to deliver on the production plan and with the benefit of the infill drilling completed over the past 9 months which has improved our understanding of the ore body and the good progress which is being made in improving the underground infrastructure, we are looking forward to a much improved 2012.'

About Great Basin Gold

Great Basin Gold

is a mining company engaged in the exploration, development and production of gold properties. The Company has two producing mines in the world's two richest gold regions: the Hollister operation on the Carlin Trend in Nevada, USA and the Burnstone operation in the Witwatersrand goldfield of South Africa.

No regulatory authority has approved or disapproved the information contained in this news release.

Cautionary Statement Regarding 2011 Preliminary Operating Results

We caution you that, whether or not expressly stated, all measures of the Company's fourth quarter and 2011 financial results and condition contained in this news release, including production, sales and cash costs are preliminary and reflect our expected 2011 results as at the date of the news release. Actual reported fourth quarter and 2011 results are subject to management's final review as well as audit by the Company's independent registered accounting firm and may vary significantly from those expectation because of a number of factors, including, without limitation, additional or revised information and changes in accounting standards or policies or in how those standards are applied. For a discussion of factors that may adversely affect our financial results and condition, see the Company's 2010 MD&A available on the Company's website or www.SEDAR.com. The Company will provide additional discussion and analysis and other important information about its fourth quarter and 2011 financial results and condition when it reports actual results prior to March 31, 2012.

Cautionary and Forward Looking Statement Information

This document contains 'forward-looking statements' that were based on Great Basin's expectations, estimates and projections as of the dates as of which those statements were made. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as 'outlook', 'anticipate', 'project', 'target', 'believe', 'estimate', 'expect', 'intend', 'should' and similar expressions. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the Company's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. These include but are not limited to:


-- uncertainties and costs related to the Company's exploration
and development activities, such as those associated with
determining whether mineral resources or reserves exist on a
property;
-- uncertainties related to feasibility studies that provide
estimates of expected or anticipated costs, expenditures and
economic returns from a mining project; uncertainties related
to expected production rates, timing of production and the cash
and total costs of production and milling;
-- uncertainties related to the ability to obtain necessary
licenses, permits, electricity, surface rights and title for
development projects;
-- operating and technical difficulties in connection with mining
development activities;
-- uncertainties related to the accuracy of our mineral reserve
and mineral resource estimates and our estimates of future
production and future cash and total costs of production, and
the geotechnical or hydrogeological nature of ore deposits, and
diminishing quantities or grades of mineral reserves;
-- uncertainties related to unexpected judicial or regulatory
proceedings;
-- changes in, and the effects of, the laws, regulations and
government policies affecting our mining operations,
particularly laws, regulations and policies relating to
o mine expansions, environmental protection and associated compliance
costs arising from exploration, mine development, mine operations
and mine closures;
o expected effective future tax rates in jurisdictions in which our
operations are located;
o the protection of the health and safety of mine workers; and
o mineral rights ownership in countries where our mineral deposits
are located, including the effect of the Mineral and Petroleum
Resources Development Act (South Africa);
-- changes in general economic conditions, the financial markets
and in the demand and market price for gold, silver and other
minerals and commodities, such as diesel fuel, coal, petroleum
coke, steel, concrete, electricity and other forms of energy,
mining equipment, and fluctuations in exchange rates,
particularly with respect to the value of the U.S. dollar,
Canadian dollar and South African rand;
-- unusual or unexpected formation, cave-ins, flooding, pressures,
and precious metals losses (and the risk of inadequate
insurance or inability to obtain insurance to cover these
risks);
-- changes in accounting policies and methods we use to report our
financial condition, including uncertainties associated with
critical accounting assumptions and estimates;
-- environmental issues and liabilities associated with mining
including processing and stock piling ore;
-- geopolitical uncertainty and political and economic instability
in countries which we operate; and
-- labour strikes, work stoppages, or other interruptions to, or
difficulties in, the employment of labour in markets in which
we operate mines, or environmental hazards, industrial
accidents or other events or occurrences, including third party
interference that interrupt the production of minerals in our
mines.

For further information on Great Basin Gold, investors should review the Company's annual Form 40-F filing with the United States Securities and Exchange Commission www.sec.gov and home jurisdiction filings that are available at www.sedar.com.

 (1) Gold equivalent ('Au eqv') calculations use US$1,400/oz for Au and US$30/oz for Ag.

 

 

 

 

Great Basin Gold Ltd.

CONTACT: For additional details on Great Basin Gold and its properties,

please

visit the Company's website at www.grtbasin.com or contact Investor

Services:



Tsholo Serunye in South Africa 27 (0) 11 301 1800

Michael Curlook in North America 1 (888) 633 9332

Barbara Cano at Breakstone Group in the USA (646) 452 2334



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Great Basin Gold Ltd.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.