• Donnerstag, 04 Juli 2024
  • 16:20 Uhr Frankfurt
  • 15:20 Uhr London
  • 10:20 Uhr New York
  • 10:20 Uhr Toronto
  • 07:20 Uhr Vancouver
  • 00:20 Uhr Sydney

Yukon-Nevada Gold Corp. Drills 52.30 m Grading 6.17 g/t from West Mahala, Jerritt Canyon, Nevada

13.02.2012  |  CNW

VANCOUVER, Feb. 13, 2012 /CNW/ - Yukon-Nevada Gold Corp.

is pleased to update results from its 2011 Surface drilling program at the Mahala Project which is located at its wholly-owned Jerritt Canyon gold operation in Nevada, USA.  Jerritt Canyon is operated by Queenstake Resources USA Ltd., ('Queenstake') a wholly owned subsidiary of Yukon-Nevada Gold Corp. ('YNG' or the 'Company').

HIGHLIGHTS


-- MAH-456 (West Mahala) intersected 52.30 meters at 6.17 g/t;

-- MAH-459 (West Mahala) intersected 29.28 meters at 5.56 g/t;

-- MAH-475 (West Mahala) intersected 15.10 meters at 14.92 g/t;
and

-- SH-1205 (East Mahala) intersected 34.16 meters at 9.98 g/t.

The Company continues to deliver exciting results from the 2011 Mahala surface drill hole assays located proximal to the SSX-Steer and Smith underground mines. These results provide further support to the Company position that the area between the Smith and SSX-Steer mines is strongly mineralized. The Mahala project consists of East Mahala, Mahala, and West Mahala that continue to exhibit outstanding exploration potential for the delineation of additional resources and reserves. West Mahala is growing into a significantly sized mineralized zone.

The additional results of the drill program received as of January 31, 2012 are shown in Tables 1 to 3.  Surface plan maps illustrating drill hole locations and an assay summary table can be found on the Company website here:  http://www.yukon-nevadagold.com/i/pdf/WMahalaSurExplUpdateMaps_2011.pdf and here: http://www.yukon-nevadagold.com/i/pdf/WMahalaSurExplDrillAssayResults_2011.pdf

Table 1.  Significant 2011 Drill Hole Assay Results from East Mahala.


_________________________________________________________________
| Hole ID | From | To | Length | |
|(Mining Zone)|Feet (ft) |Feet (ft) |Feet (ft) | Gold Grade |
| |Meters (m)|Meters (m)|Meters (m)| |
|_____________|__________|__________|__________|__________________|
|SH-1205 | 866.0 ft | 978.0 ft | 112.0 ft | 0.291 opt |
|(Zone 9) | 264.13 m | 298.29 m | 34.16 m | 9.98 g/t |
|_____________|__________|__________|__________|__________________|
|EM-128 | 900.0 ft | 940.0 ft | 40.0 ft | 0.120 opt |
|(Zone 4) | 274.50 m | 286.70 m | 12.20 m | 4.11 g/t |
|_____________|__________|__________|__________|__________________|
|Notes: (1) Gold grade reported in Troy ounces per ton (opt) and|
|grams per tonne (g/t) |
| (2) No Significant Assays: EM-127 |
| (3) Assays Pending: SH-1204, SH-1209, EM-122 |
| (4) Diamond core holes not drilled: EM-125 and |
|EM-129 |
|_________________________________________________________________|


Table 2.  Significant 2011 Drill Hole Assay Results from Mahala.


______________________________________________________________
| Hole ID | From | To | Length | |
|(Mining Zone) |Feet (ft) |Feet (ft) |Feet (ft) | Gold Grade |
| |Meters (m)|Meters (m)|Meters (m)| |
|______________|__________|__________|__________|______________|
|MAH-447 | 695.0 ft | 700.0 ft | 5.0 ft | 0.301 opt |
|(Zone 8 Smith)| 211.97 m | 213.50 m | 1.52 m | 10.32 g/t |
|______________|__________|__________|__________|______________|
|Notes: (1) Gold grade reported in Troy ounces per ton (opt)|
|and grams per tonne (g/t) |
| (2) Assays Pending: SH-1213 |
|______________________________________________________________|


Table 3.  Significant 2011 Drill Hole Assay Results from West Mahala.


_________________________________________________________________
| | From | To | Length | |
| Hole ID |Feet (ft) |Feet (ft) |Feet (ft) | Gold Grade |
| |Meters (m)|Meters (m)|Meters (m)| |
|___________|__________|__________|__________|____________________|
|MAH-456 |1041.5 ft |1213.0 ft | 171.5 ft | 0.180 opt |
|(W. Mahala)| 317.66 m | 369.96 m | 52.30 m | 6.17 g/t |
|___________|__________|__________|__________|____________________|
|MAH-459 |1065.0 ft |1161.0 ft | 96.0 ft | 0.162 opt |
|(W. Mahala)| 324.82 m | 354.10 m | 29.28 m | 5.56 g/t |
|___________|__________|__________|__________|____________________|
|MAH-466 |1029.5 ft |1090.0 ft | 60.5 ft | 0.117 opt |
|(W. Mahala)| 314.00 m | 332.45 m | 18.45 m | 4.01 g/t |
|___________|__________|__________|__________|____________________|
|MAH-471 | 958.0 ft |1007.0 ft | 49.0 ft | 0.230 opt |
|(W. Mahala)| 292.19 m | 307.13 m | 14.94 m | 7.89 g/t |
|___________|__________|__________|__________|____________________|
|MAH-471 |1033.0 ft |1043.0 ft | 10.0 ft | 0.106 opt |
|(W. Mahala)| 315.06 m | 318.11 m | 3.05 m | 3.64 g/t |
|___________|__________|__________|__________|____________________|
|MAH-475 |1212.0 ft |1261.5 ft | 49.5 ft | 0.435 opt |
|(W. Mahala)| 369.66 m | 384.76 m | 15.10 m | 14.92 g/t |
|___________|__________|__________|__________|____________________|
|Notes: (1) Gold grade reported in Troy ounces per ton (opt) and|
|grams per tonne (g/t) |
| (2) No Significant Assays: MAH-473 |
|_________________________________________________________________|


Geologic and Engineering modeling are in progress to update the resources and reserves in the Mahala Project area and will be included in an NI 43-101 Technical Report scheduled to be completed in April 2012.

In mid-January substantial snowfall occurred at higher elevations throughout the Jerritt Canyon property. This prompted suspension of surface drilling operations until the upcoming spring/summer 2012 field season. Underground diamond drilling continues at the Smith mine. The Mahala surface drill hole assay results listed in this press release are those that were not included in the previous press release dated January 11, 2012. Details of the geology and mining zones for the present drill hole assay results are included in the previous press release.

Assaying of all samples from the 2011 surface drill program reported in this news release were conducted by ALS Laboratory Group in Reno, Nevada using standard fire assay techniques.  Assay intercepts are reported as drilled.  True widths have not yet been calculated; given the geometry of the mineralization at Jerritt Canyon, the concept of true width is not always meaningful before delineation drilling has been completed.  The company's 2010 and 2011 Quality Assurance and Quality Control protocols are available at the Company's website:  http://www.yukon-nevadagold.com/i/pdf/JC_Assay_Protocols.pdf

The information in this news release was compiled and reviewed by William Hofer B.Sc., Chief Geologist, Jerritt Canyon Mine. The information contained in this news release has been reviewed and approved by the Company's Vice President of Exploration, Todd Johnson, M.Sc. (Qualified Person per the requirements of NI 43-101).

Yukon-Nevada Gold Corp. is a North American gold producer in the business of discovering, developing and operating gold deposits. The Company holds a diverse portfolio of gold, silver, zinc and copper properties in the Yukon Territory and British Columbia in Canada and in Nevada in the United States. The Company's focus has been on the acquisition and development of late stage development and operating properties with gold as the primary target. Continued growth will occur by increasing or initiating production from the Company's existing properties.

If you would like to receive press releases via email please contact nicole@yngc.ca and specify 'Yukon-Nevada Gold Corp. releases' in the subject line.

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

WARNING: The Company relies upon litigation protection for 'forward-looking' statements.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States.  The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the 'U.S. Securities Act') or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

Yukon-Nevada Gold Corp.

CONTACT: Yukon-Nevada Gold Corp.

Richard Moritz

Senior Director, Institutional Investor Relations

Tel: (604) 688-9427

Email: rmoritz@yngc.ca



Nicole Sanches

Investor Relations Manager

Tel: (604) 688-9427 ext 224

Email: nicole@yngc.ca

www.yukon-nevadagold.com



CHF Investor Relations

Jeanny So

Director of Operations

Tel: (416) 868-1079 ext. 225

Email: jeanny@chfir.com

www.chfir.com



AXINO AG

Wolfgang Seybold

Chairman Tel: +49 711 25 35 92 40

Email: wolfgang.seybold@axino.de

www.axino.de/



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Veris Gold Corp.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.