• Freitag, 22 November 2024
  • 16:49 Uhr Frankfurt
  • 15:49 Uhr London
  • 10:49 Uhr New York
  • 10:49 Uhr Toronto
  • 07:49 Uhr Vancouver
  • 02:49 Uhr Sydney

Southern Arc Provides Drilling Results from Bising Target-Mencanggah Prospect

16.02.2012  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 02/16/12 -- Southern Arc Minerals (TSX VENTURE: SA)(OTCQX: SOACF) ('Southern Arc' or 'the Company') is pleased to provide Phase 1 drilling results from the Bising target in the Mencanggah Prospect on Southern Arc's West Lombok Property.


Assay results have been received for drill holes MCG028 to MCG035, as summarized in Table 1 and Figure 1 (to view Figure 1, please click the following link: http://media3.marketwire.com/docs/sa0216.pdf). All intersections are reported as down-hole lengths. A total of eight holes totaling 2,285.7 metres have been completed to date in the Phase 1 program at the Bising target. Highlight drilling intercepts include:



MCG028 51.3 m @ 1.5 g/t gold from 35.6 m
including 5.1 m @ 3.5 g/t gold from 53.4 m
3.8 m @ 4.9 g/t gold from 60.2 m
MCG030 39.0 m @ 1.8 g/t gold from 34.0 m
including 9.7 m @ 4.9 g/t gold and 5.9 g/t silver from 56.3 m
0.3 m @ 89.0 g/t gold and 27.6 g/t silver from 69.2 m
MCG031 4.4 m @ 2.1 g/t gold and 7.3 g/t silver from 74.2 m
0.8 m @ 47.7 g/t gold and 13.2 g/t silver from 156.8 m
MCG032 37.8 m @ 1.0 g/t gold from 11.7 m
including 3.0 m @ 2.7 g/t gold from 19.0 m
4.8 m @ 4.0 g/t gold from 25.2 m


Bising is a high-priority drilling target for Southern Arc based on the presence of significant surface channel intercepts from banded and brecciated chalcedonic-quartz vein structures, including 5.0 m @ 12.2 g/t gold, 2.0 m @ 228.0 g/t gold and 5.0 m @ 5.22 g/t gold.


'Initial drill results indicate that gold mineralization continues at depth in the Bising target,' said Dr. Mike Andrews, Chief Operating Officer of Southern Arc. 'Given the impressive width of the main mineralized structure and the extensive network of offshoots and intersecting structures, Southern Arc will make Bising a high-priority target when full-scale exploration resumes at the West Lombok property.'


The extensive width (up to 66 metres) of the main Bising epithermal body is inferred to result from the intersection of geological structures: a major west-northwest trending structure and several north-northwest trending structures, the latter of which form the dominant gold mineralized trend in the district. Drill holes were located at 100 m drill spacings to test the main Bising epithermal structural body, its extensions, and intersections with several crossing structures.


Further drilling is warranted to map out these broad silification zones, which have large tonnage potential. Closer-spaced drilling is required to determine the orientation and continuity of higher-grade gold zones. Southern Arc will prioritize additional drilling of the Bising target when the Company resumes full-scale exploration upon receipt of its Pinjam/Pakai forestry permit. In the interim, the Company is focused on exploration of epithermal gold targets to the northwest of the property and copper-gold porphyry targets to the southeast and northeast of the property.


On behalf of the Board of Southern Arc Minerals Inc.


John Proust, Chairman & Chief Executive Officer


About Southern Arc


Southern Arc Minerals Inc. is a Canadian mineral exploration company with an aggressive exploration, acquisition and growth strategy. The Company's portfolio includes four exploration projects with epithermal gold and gold-copper porphyry prospects on the Lombok and Sumbawa islands in Indonesia, three of which are being advanced in partnership with major mining companies Vale and Newcrest. The Company's key exploration property is its West Lombok project, with several gold-rich copper porphyry and epithermal gold vein prospects. Southern Arc is listed on the TSX Venture Exchange under the symbol SA and on the OTCQX International under the symbol SOACF. More information is available at www.southernarcminerals.com or by emailing info@southernarcminerals.com.


Qualified Person


The technical information in this document has been reviewed by Southern Arc's Chief Geologist, Andrew Rowe, B. App. Sc. Geology, MAusIMM. Mr. Rowe has over 18 years of international mineral exploration experience throughout Southeast and Central Asia and Australia. During this time he has held such positions as Principal Geologist - Feasibility Studies, Senior Geologist and Consulting Geologist. The technical information in this document has also been reviewed by Southern Arc's President & Chief Operating Officer, Dr. Mike Andrews, PhD, FAusIMM, who has sufficient experience relevant to the style of mineralization under consideration and qualifies as a Qualified Person as defined by National Instrument 43-101.


The drill program and sampling protocol is managed by Southern Arc under the supervision of Andrew Rowe. The diamond drill holes are drilled at PQ, HQ and NQ sizes depending on hole depth and core recovery to date has averaged 98.0%. Half core is cut by rock saw and is generally sampled using nominal 1-metre intervals; however, sample intervals are varied according to geological contacts and have ranged between 0.2 to 2.5 metres in length. Three quality control samples (one blank and two standards) are inserted into each batch of 40 samples. The half core samples are securely transported from the project site to the Intertek Testing Services ('ITS') sample preparation laboratory in Sumbawa Besar via private truck hired by Southern Arc. Sample pulps are then sent to the ITS Jakarta laboratory by ITS. Gold is analysed by fire assay with AAS finish and a four-acid digestion with ICP-MS finish is used to analyse a full suite of elements including silver and base metals. ITS is one of the world's largest product and commodity testing, inspection and certification organizations. The Jakarta laboratory is ISO 17025 accredited and employs a Laboratory Information Management System for sample tracking, quality control and reporting.


Forward-looking Statements


This news release contains forward-looking statements relating to expected or anticipated future events and operations, timing of projects and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, the regulatory process and actions, the need to obtain permits, the need to work with local communities and authorities to advance the properties, technical issues, new legislation, competitive and general economic factors and conditions, the uncertainties resulting from potential delays or changes in plans, the occurrence of unexpected events, and the Company's ability to execute and implement future plans. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors. There is no representation by the Company that actual results achieved during the forecast period will be the same in whole or in part as that forecast.



Table 1 - Mencanggah Prospect, Bising Target, Phase 1 Drill Hole
Statistics Summary
--------------------------------------------------------------------
Coordinates
Depth ---------------------
Drill Hole Target (m) E N Az Dip
--------------------------------------------------------------------
MCG028 Bising 326.5 388254.66 9023900.8 195 -50
Including
Including
Including
Including
Including
Including
Including
--------------------------------------------------------------------
MCG029 Bising 234 388069.26 9023936.1 195 -50


--------------------------------------------------------------------
MCG030 Bising 201.5 388157.06 9023887.5 195 -50
Including
Including
Including
Including
Including
--------------------------------------------------------------------
MCG031 Bising 283.9 388331.2 9023866.8 195 -50



--------------------------------------------------------------------
MCG032 Bising 250 388562 9023720 195 -50
Including
Including
Including
--------------------------------------------------------------------
MCG033 Bising 387.2 388217.82 9024026.3 230 -50

--------------------------------------------------------------------
MCG034 Bising 304.5 388376 9023678 230 -50
--------------------------------------------------------------------
MCG035 Bising 298.1 388256 9023500 230 -50
--------------------------------------------------------------------


----------------------------------------------------------------
From To Interval Gold Silver
Drill Hole Target (m) (m) (m) (g/t) (g/t)
----------------------------------------------------------------
MCG028 Bising 35.6 86.85 51.3 1.5 NS
Including 47.9 52 4.1 2.3 NS
Including 53.4 58.45 5.1 3.5 NS
Including 56.4 57.4 1.0 11.0 NS
Including 60.2 63.9 3.8 4.9 NS
Including 61.8 62.05 0.3 40.3 NS
Including 65.6 76.4 10.8 1.4 2.8
Including 76.0 76.4 0.5 13.4 NS
----------------------------------------------------------------
MCG029 Bising 47.1 47.7 0.6 3.5 NS
74.6 75.0 0.4 2.9 26
80.0 81.0 1.0 1.0 4.0
----------------------------------------------------------------
MCG030 Bising 34.0 73.0 39.0 1.8 3.1
Including 38.6 40.0 1.4 1.1 NS
Including 46.5 50.1 3.6 1.7 2.0
Including 56.3 66.0 9.7 4.9 5.9
Including 59.2 59.5 0.3 89 27.6
Including 71.0 73.0 2.0 1.1 5
----------------------------------------------------------------
MCG031 Bising 37.0 37.6 0.6 6.5 2.2
74.2 78.6 4.4 2.1 7.3
74.2 75.1 0.9 6.8 27.7
156.8 157.5 0.8 47.7 13.2
----------------------------------------------------------------
MCG032 Bising 11.7 49.5 37.8 1.0 NS
Including 19.0 22.0 3.0 2.7 NS
Including 25.2 30.0 4.8 4.0 2.5
Including 44.2 45.2 1.0 1.4 NS
----------------------------------------------------------------
MCG033 Bising 220.4 220.7 0.3 1.7 6.5
259.1 259.55 0.4 1.4 NS
----------------------------------------------------------------
MCG034 Bising 10.2 11.6 1.4 1.2 23.2
----------------------------------------------------------------
MCG035 Bising 65 66.4 1.4 1.7 NS
176.7 177.3 0.7 2.5 NS
----------------------------------------------------------------

NS - No significant result


Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:

Southern Arc Minerals Inc.

Rhylin Bailie

Vice President, Communications & Investor Relations

North American Toll-free: 1-855-676-5241
info@southernarcminerals.com
www.southernarcminerals.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Southern Arc Minerals Inc.
Bergbau
A2QEXE
CA8422004041
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.