• Montag, 22 Juli 2024
  • 21:29 Uhr Frankfurt
  • 20:29 Uhr London
  • 15:29 Uhr New York
  • 15:29 Uhr Toronto
  • 12:29 Uhr Vancouver
  • 05:29 Uhr Sydney

Tosca Mining Releases NI 43-101 Resource Estimate and Metallurgical Results for Red Hills, Texas

22.02.2012  |  Business Wire
Tosca Mining Corporation (TSX.V:TSQ, OTCQX:TSMNF, FSE:TQ4) announces the completion by Mine Development Associates ('MDA') of Reno, Nevada of the first publically reported, NI 43-101 compliant mineral resource estimate for the Red Hills Deposit, located in Presidio County, Texas. The MDA report also summarizes the results of a metallurgical study completed by METCON Research in Tucson, Arizona. Themineralization of interest at Red Hills occurs within a porphyry molybdenum deposit and near surface copper enrichment zone ('copper blanket') that covers an area about 4,000 ft (1220 m) by 3,000 ft (915 m). The porphyry molybdenum mineralization has a depth-extent of over 2,000 ft (610 m) though the mineralization is not well-defined past a depth of 1,000 ft (305 m).Both copper and molybdenum mineralization are open to the south under post-mineralization cover.


Highlights

Red Hills Mineral Resources

CategoryCutoff

(%MoEq*)

Tons

(million)

%MoEq %Mo lbs. Mo

(million)

%Cu lbs. Cu

(million)


Indicated
0.025
26.7
0.080
0.054
28.7
0.14
77.4
Inferred
0.025
263.8
0.056
0.051
268.5
0.03
151.3

Indicated
0.050
21.7
0.090
0.061
26.6
0.16
68.6
Inferred
0.050
149.8
0.073
0.069
206.6 0.0268.2

*Molybdenum Equivalent Grades (% MoEq) are calculated as follows:MoEq%=Mo%+(Cu% x 0.1806). This formula is based on 1) prices of$ 14/lb. Mo and $ 3.25/lb. Cu, and 2) molybdenum and copper recoveries of approximately 90% and 70%, respectively.

As a term of reference according to www.metalprices.com, the price as of February 17, 2012, of Molybdenum was $14.51 per pound and Copper $3.79 per pound.


Metallurgy: Results of flotation testing

Average molybdenum recovery: 89%


Sadek El-Alfy, PhD, CEO, commented, 'The results from the 2011 diamonddrill campaign confirmed that Red Hills is a large porphyry deposit with commercially attractive grades of both molybdenum and copper. Metallurgical studies have shown that recoveries of thismolybdenum/copper resource are encouraging and straightforward.

In 2012 we will continue to develop Red Hills by investigating the economic feasibility of molybdenum/copper extraction and recovery on a large scale; this study will be incorporated in a Preliminary Economic Assessment ('PEA?) currently being prepared by M3 Engineering in Tucson, Arizona. The company is planning a drill program to upgrade the resources and to drill test the potential southern extension of thedeposit.


Mineral Resources

The resource estimate is based on a database of 121 drill holes totaling 60,131 feet (18,328 m) which includes 53,947 feet (16,443 m) of diamond drilling. The copper and molybdenum resources were modeled and estimated by evaluating the drill data statistically, utilizing the geologic interpretations developed by Tosca and MDA to interpret mineral domains on 29 cross sections spaced at 100 ft (30.5 m) intervals, resolving the mineral domain interpretations on longitudinal sections spaced at 20 ft (6.1 m) intervals, analyzing the modeled mineralization statistically to establish estimation parameters, and interpolating grades into a three-dimensional block model. Lithology, oxidation, and copper-molybdenum mineral domains models were created for the Red Hillsproject. The modeling of the Red Hills Resources was performed using Gemcom Surpac ? mining software.

The stated resource is fullydiluted to 20ft (6.1 m) by 20ft by 20ft blocks. In consideration of the depth limits of any potential open pit mining, the Red Hills resource was constrained toa bottom elevation of 2,800 ft (853 m) approximately 1,200 ft (366 m) below the general surface.

Because of the requirement that the resource exists 'in such form and quantity and of such a grade or quality that it has reasonable prospectsfor economic extraction,? MDA is reporting the resources at a cutoff grade (0.025% MoEq) as that is reasonable for deposits mined by open-pit methods. In determining a reasonable cutoff grade, MDA considered metal prices, extraction costs, and metallurgical recoveries. The dilutedresources have been reported at additional cutoffs in order to provide a grade distribution. The diluted resources at a 0.05% MoEq cut-off gradeis included in the Mineral Resource highlights on page 1 to show the effect of a higher cut-off grade.

The copper resource is fully contained within the near-surface copper blanket, and there is a significant tonnage of molybdenum-only material in the resource. The lower copper grades within the Red Hills resource result from the 'spreading? of the copper over the full resource. If the copper mineralization is evaluated from a copper-only standpoint, the copper resource at a 0.15% Cu cutoffgrade (comparable to 0.027% MoEq cutoff grade) containsan Indicated Resource of 8million tonsof 0.35% Cu (56.4 millionlbs. Cu) and an Inferred Resource of 12.7 million tons of 0.25% Cu (63.4 million lbs. Cu).

In addition to the molybdenum/copper mineralization, multi-element analyses of Tosca′s drill samples show elevated rhenium levelsassociated with molybdenite mineralization. Rhenium concentrations of 0.5 to >1.0 part per million were encountered over vertical intervals of up to 500 feet (152 m) throughout the mineralized porphyry.


Metallurgical Testing

METCON conducted a froth flotation study on seven composite core samples from Tosca′s 2011 drilling at Red Hills, using assay rejects. The frothflotation study was conducted at a grind size of approximately 80 percent passing 74 microns, a pulp density of 25 percent solids, and pulp pH at 11. The results of this investigation are tabulated below:


Locked Cycle Flotation Testing On Composite Samples

Average Metallurgical Results

Summary of Results

Locked Cycle Flotation Testing On Composite Samples

Average Metallurgical Results

Summary of Results

Sample ID


Head Grade


Grade


Recovery



Total

Cu (%)




Mo

(ppm)




Mass

Recovery

(%)




Cu

(%)




Mo

(%)




Cu

(%)




Mo

(%)

Composite 1



0.46




41




4.75




5.70




0.08




63.37




68.43
Composite 2




0.26




438




1.39




10.66




2.36




64.95




81.41
Composite 3



0.31




513




1.24




10.92




3.07




52.26




86.69
Composite 4



0.78




682




4.28




14.80




1.24




85.61




91.30
Composite 5



0.16




562




2.95




3.70




1.54




64.86




89.48
Composite 6



<0.001




728




0.42




1.11




14.85



63.03




93.23
Composite 7


<0.001




963




0.42



0.28




19.32




30.54




90.50

Head assays of composites 1 to 5 contained significant copperconcentrations (0.16% to 0.78% Cu). Copper recoveries from those five samples ranged from 52.26% to 85.61 % (average: 66.2 %). Composites 6 and 7 did not contain detectable copper in head assays.

Head assays of Composites 2 to 7 contained significant molybdenum concentrations (438 ppm to 963 ppm Mo). Molybdenum recoveries from those composites ranged from 81.41% to 93.23 % (average: 88.8%).

A complete copy of the NI 43-101 for Red Hills Projects is available on SEDAR and also filed on the OTC-QX website.


Qualified Person

The mineral resource estimate was prepared by Paul Tietz, Senior Geologist at Mine Development Associates ('MDA') in Reno, Nevada in accordance with National Instrument 43-101. Paul Tietz is an independent 'Qualified Person? as defined by National Instrument 43-101.

The metallurgical studies were supervised by Rodrigo R. Carneiro, a metallurgical engineer with METCON Research ('METCON?) and a 'Qualified Person' as defined by NI-43-101.

The mineral Resource estimate and the metallurgical work were reviewed by Luca Riccio, PhD, PGeo and Sadek El-Alfy, PhD, respectively. Both are 'Qualified Persons? according to the definitions of NI 43-101. LucaRiccio has supervised the preparation of the technical information and data included in this News Release.


On Behalf of the board of directors,

'Ron Shenton'



For further information, please visit the company's website at www.toscamining.com or call 604-687-6562. Email info@toscamining.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)accepts responsibility for the adequacy or accuracy of this release.

Statements in this press release, other than purely historical information, including statements relating to the Company′s future plans and objectives or expected results, may include forward-looking statements. Forward-looking statements are based on numerous assumptionsand are subject to all of the risks and uncertainties inherent in resource exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements



Tosca Mining Corporation
Ron Shenton
604-687-6562
info@toscamining.com
www.toscamining.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Tosca Resources Corp.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.