• Montag, 23 Dezember 2024
  • 08:48 Uhr Frankfurt
  • 07:48 Uhr London
  • 02:48 Uhr New York
  • 02:48 Uhr Toronto
  • 23:48 Uhr Vancouver
  • 18:48 Uhr Sydney

Magino Drilling Update: 149 Metres Grading 1.24 gpt Gold in Central Zone; High Grade in Southwest Extension: 5 Metres Grading 9.42 gpt Gold

20.03.2012  |  Business Wire


Prodigy Gold Incorporated (PDG: TSX.V; 'Prodigy' or 'the company') is
pleased to announce results from 10,724 metres of diamond drilling
completed at the Magino Mine gold project since January, 2012. The
results are from four distinct target areas: 1) Resource definition
drilling in the central portion of the Magino gold deposit, 2) resource
expansion drilling in the Southwest extension of the Magino gold
deposit, 3) exploration drilling in the Lovell Lake area and 4)
condemnation drilling to facilitate identifying specific sites for
future mine infrastructure.

1. Resource Definition Drilling: Prodigy
has completed eleven resource definition drill holes (2,596 metres) in
the central portion of the Magino gold deposit. Highlights include 149.4
metres grading 1.24 gpt gold in drill hole MA12-246 and 121.5 metres
grading 1.05 gpt gold in drill hole MA12-245. Most of these initial
definition holes are shallow and target the margins of deposit in areas
previously modeled as inferred resources (please see technical report
dated November 2, 2011; filed on SEDAR and available on Prodigy's web
site). These eleven holes are reducing the drill hole spacing in
specific parts of the deposit in order to increase drill hole density in
anticipation of updating the gold resource prior to completing a
bankable feasibility study for the project. Results to date are very
encouraging, a complete table of resource definition drilling results
and a drill hole location map are shown below.

2. Southwest Extension Resource Expansion Drilling:
Prodigy completed eleven drill holes (3,505 metres) in the Southwest
portion of the Magino gold deposit, seeking to expand the known gold
resource and more accurately define previously unclassified gold
mineralized zones. This drilling, when combined with previously released
drill results from the Southwest extension, has identified significant
areas of new gold mineralization at depth and along strike within the
gold system. The drilling also continues to identify high grade gold
zones within the broader lower grade gold halo: 5.0 metres grading 9.42
gpt gold in MA12-218 and 6.0 metres grading 6.24 gpt gold in MA12-210.
Expansion of the proposed open pit into the Southwest area could
potentially capture the newly identified low grade gold mineralization
and also allow the mining of the shallow high grade gold zones by open
pit methods. Exploiting the higher grade gold mineralization utilizing
low cost open pit mining vs. high cost underground methods can
positively impact project economics. A complete table of Southwest
extension drill results and a drill hole location map are shown below.

3. Lovell Lake Exploration Drilling:
Prodigy also completed 15 exploration drill holes (2,511 metres) in the
Lovell Lake area, located about 500 metres west of the Magino gold
deposit. Previously announced drill results from the Lovell Lake area
indicated that a low grade gold system was present, hosted by
granodiorite in a geologic setting similar to the main Magino gold
deposit. These fifteen drill holes confirm the presence of widespread
gold mineralization at Lovell Lake, for example: 77.0 metres grading
0.52 gpt gold including 4.0 metres grading 4.73 gpt gold in drill hole
MA12-225. Overall gold grades at Lovell Lake appear to be slightly lower
than at Magino, averaging about 0.7 gpt gold, however the shallow nature
of the gold system, with a low potential strip ratio, suggests the gold
system at Lovell Lake could add to the overall project gold resources at
Magino. A complete table of Lovell Lake drill results and a drill hole
location map are shown below.


The drill results reported herein are part of a previously announced
60,000 metre diamond drilling program at Magino. Prodigy is accelerating
the pace of the drilling program and hopes to have eight rigs operating
on the property shortly. Brian J. Maher, President and CEO of Prodigy
Gold commented: 'The company is very pleased with the latest Magino
drill results. As the Magino gold deposit continues to grow, we will add
additional drill capacity to accelerate the progress of the gold
resource definition and expansion drilling. Prodigy is seeking to
identify the ultimate size and scale of the Magino gold resource in
anticipation of settling on final design criteria to be utilized in the
upcoming bankable feasibility study. Completing this drilling program
will allow us to select the proper process plant capacity and mining
fleet size to optimize project economics.'

Drill Hole
 ?

 ?

 ?
From (metres)
 ?

 ?

 ?
To (metres)
 ?

 ?

 ?
Length (metres)
 ?

 ?

 ?
Azimuth (360 deg)
 ?

 ?

 ?
Dip (angle below surface)
 ?

 ?

 ?
Est. True Thickness (metres)
 ?

 ?

 ?
From (Depth Below Surface (metres))
 ?

 ?

 ?
To (Depth Below Surface (metres))
 ?

 ?

 ?
Total Length of Hole (m)
 ?

 ?

 ?
Grade 40 gpt Capped (gpt gold)

Central Magino Gold Deposit Resource Definition Drilling

MA12-236

 ?

 ?

 ?

198.0

 ?

 ?

 ?

329.0

 ?

 ?

 ?

131.0

 ?

 ?

 ?

155.0

 ?

 ?

 ?

-44.9

 ?

 ?

 ?

100.3

 ?

 ?

 ?

151.7

 ?

 ?

 ?

252.0

 ?

 ?

 ?

329.0

 ?

 ?

 ?

0.78

including

 ?

 ?

 ?

232.7

 ?

 ?

 ?

273.0

 ?

 ?

 ?

40.3

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

30.9

 ?

 ?

 ?

178.2

 ?

 ?

 ?

209.1

 ?

 ?

 ?

 ?

 ?

 ?

 ?

2.06

MA12-240

 ?

 ?

 ?

229.0

 ?

 ?

 ?

284.0

 ?

 ?

 ?

55.0

 ?

 ?

 ?

159.1

 ?

 ?

 ?

-45.2

 ?

 ?

 ?

42.1

 ?

 ?

 ?

175.4

 ?

 ?

 ?

217.5

 ?

 ?

 ?

284.0

 ?

 ?

 ?

1.78

MA12-243

 ?

 ?

 ?

223.0

 ?

 ?

 ?

243.0

 ?

 ?

 ?

20.0

 ?

 ?

 ?

173.6

 ?

 ?

 ?

-45.2

 ?

 ?

 ?

15.3

 ?

 ?

 ?

170.8

 ?

 ?

 ?

186.1

 ?

 ?

 ?

350.0

 ?

 ?

 ?

0.95

 ?

 ?

 ?

 ?

275.0

 ?

 ?

 ?

350.0

 ?

 ?

 ?

75.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

57.5

 ?

 ?

 ?

210.7

 ?

 ?

 ?

268.1

 ?

 ?

 ?

 ?

 ?

 ?

 ?

0.52

including

 ?

 ?

 ?

305.0

 ?

 ?

 ?

330.0

 ?

 ?

 ?

25.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

19.2

 ?

 ?

 ?

233.6

 ?

 ?

 ?

252.8

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.01

MA12-244

 ?

 ?

 ?

50.0

 ?

 ?

 ?

83.0

 ?

 ?

 ?

33.0

 ?

 ?

 ?

162.8

 ?

 ?

 ?

-48.4

 ?

 ?

 ?

25.3

 ?

 ?

 ?

38.3

 ?

 ?

 ?

63.6

 ?

 ?

 ?

101.0

 ?

 ?

 ?

0.71

MA12-245

 ?

 ?

 ?

16.5

 ?

 ?

 ?

138.0

 ?

 ?

 ?

121.5

 ?

 ?

 ?

167.3

 ?

 ?

 ?

-49.5

 ?

 ?

 ?

93.1

 ?

 ?

 ?

12.6

 ?

 ?

 ?

105.7

 ?

 ?

 ?

140.0

 ?

 ?

 ?

1.05

including

 ?

 ?

 ?

16.5

 ?

 ?

 ?

76.0

 ?

 ?

 ?

59.5

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

45.6

 ?

 ?

 ?

12.6

 ?

 ?

 ?

58.2

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.42

MA12-246

 ?

 ?

 ?

97.6

 ?

 ?

 ?

247.0

 ?

 ?

 ?

149.4

 ?

 ?

 ?

162.1

 ?

 ?

 ?

-44.7

 ?

 ?

 ?

114.4

 ?

 ?

 ?

74.8

 ?

 ?

 ?

189.2

 ?

 ?

 ?

350.0

 ?

 ?

 ?

1.24

MA12-247

 ?

 ?

 ?

36.0

 ?

 ?

 ?

53.0

 ?

 ?

 ?

17.0

 ?

 ?

 ?

161.7

 ?

 ?

 ?

-52.0

 ?

 ?

 ?

13.0

 ?

 ?

 ?

27.6

 ?

 ?

 ?

40.6

 ?

 ?

 ?

101.0

 ?

 ?

 ?

1.09

MA12-248

 ?

 ?

 ?

81.0

 ?

 ?

 ?

121.0

 ?

 ?

 ?

40.0

 ?

 ?

 ?

168.8

 ?

 ?

 ?

-52.8

 ?

 ?

 ?

30.6

 ?

 ?

 ?

62.0

 ?

 ?

 ?

92.7

 ?

 ?

 ?

200.0

 ?

 ?

 ?

1.17

MA12-250

 ?

 ?

 ?

101.0

 ?

 ?

 ?

179.0

 ?

 ?

 ?

78.0

 ?

 ?

 ?

177.1

 ?

 ?

 ?

-43.6

 ?

 ?

 ?

59.7

 ?

 ?

 ?

77.4

 ?

 ?

 ?

137.1

 ?

 ?

 ?

500.0

 ?

 ?

 ?

1.00

 ?

 ?

 ?

 ?

336.0

 ?

 ?

 ?

494.0

 ?

 ?

 ?

158.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

121.0

 ?

 ?

 ?

257.4

 ?

 ?

 ?

378.4

 ?

 ?

 ?

 ?

 ?

 ?

 ?

0.67

including

 ?

 ?

 ?

436.0

 ?

 ?

 ?

477.0

 ?

 ?

 ?

41.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

31.4

 ?

 ?

 ?

334.0

 ?

 ?

 ?

365.4

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.06

MA12-251

 ?

 ?

 ?

57.0

 ?

 ?

 ?

67.0

 ?

 ?

 ?

10.0

 ?

 ?

 ?

165.8

 ?

 ?

 ?

-49.7

 ?

 ?

 ?

7.7

 ?

 ?

 ?

43.7

 ?

 ?

 ?

51.3

 ?

 ?

 ?

110.0

 ?

 ?

 ?

1.58

MA12-252

 ?

 ?

 ?

15.0

 ?

 ?

 ?

104.0

 ?

 ?

 ?

89.0

 ?

 ?

 ?

139.5

 ?

 ?

 ?

-57.7

 ?

 ?

 ?

68.2

 ?

 ?

 ?

11.5

 ?

 ?

 ?

79.7

 ?

 ?

 ?

131.0

 ?

 ?

 ?

0.88

including

 ?

 ?

 ?

15.0

 ?

 ?

 ?

37.0

 ?

 ?

 ?

22.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

16.9

 ?

 ?

 ?

11.5

 ?

 ?

 ?

28.3

 ?

 ?

 ?

 ?

 ?

 ?

 ?

2.31

Southwest Magino Gold Deposit Resource Expansion and Definition
Drilling

MA12-210

 ?

 ?

 ?

47.0

 ?

 ?

 ?

53.0

 ?

 ?

 ?

6.0

 ?

 ?

 ?

161.8

 ?

 ?

 ?

-47.5

 ?

 ?

 ?

4.6

 ?

 ?

 ?

36.0

 ?

 ?

 ?

40.6

 ?

 ?

 ?

251.0

 ?

 ?

 ?

6.24

 ?

 ?

 ?

 ?

94.0

 ?

 ?

 ?

121.0

 ?

 ?

 ?

27.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

20.7

 ?

 ?

 ?

72.0

 ?

 ?

 ?

92.7

 ?

 ?

 ?

 ?

 ?

 ?

 ?

0.60

MA12-212

 ?

 ?

 ?

69.0

 ?

 ?

 ?

82.0

 ?

 ?

 ?

13.0

 ?

 ?

 ?

163.2

 ?

 ?

 ?

-49.2

 ?

 ?

 ?

10.0

 ?

 ?

 ?

52.9

 ?

 ?

 ?

62.8

 ?

 ?

 ?

272.0

 ?

 ?

 ?

1.12

 ?

 ?

 ?

 ?

104.0

 ?

 ?

 ?

221.0

 ?

 ?

 ?

117.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

89.6

 ?

 ?

 ?

79.7

 ?

 ?

 ?

169.3

 ?

 ?

 ?

 ?

 ?

 ?

 ?

0.61

including

 ?

 ?

 ?

157.0

 ?

 ?

 ?

177.0

 ?

 ?

 ?

20.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

15.3

 ?

 ?

 ?

120.3

 ?

 ?

 ?

135.6

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.86

MA12-213

 ?

 ?

 ?

156.0

 ?

 ?

 ?

201.0

 ?

 ?

 ?

45.0

 ?

 ?

 ?

167.5

 ?

 ?

 ?

-50.2

 ?

 ?

 ?

34.5

 ?

 ?

 ?

119.5

 ?

 ?

 ?

154.0

 ?

 ?

 ?

227.0

 ?

 ?

 ?

0.84

 ?

 ?

 ?

 ?

156.0

 ?

 ?

 ?

184.0

 ?

 ?

 ?

28.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

21.4

 ?

 ?

 ?

119.5

 ?

 ?

 ?

140.9

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.15

MA12-217

 ?

 ?

 ?

177.0

 ?

 ?

 ?

249.0

 ?

 ?

 ?

72.0

 ?

 ?

 ?

167.5

 ?

 ?

 ?

-48.3

 ?

 ?

 ?

55.2

 ?

 ?

 ?

135.6

 ?

 ?

 ?

190.7

 ?

 ?

 ?

320.0

 ?

 ?

 ?

0.44

MA12-218

 ?

 ?

 ?

252.0

 ?

 ?

 ?

257.0

 ?

 ?

 ?

5.0

 ?

 ?

 ?

161.8

 ?

 ?

 ?

-48.3

 ?

 ?

 ?

3.8

 ?

 ?

 ?

193.0

 ?

 ?

 ?

196.9

 ?

 ?

 ?

281.0

 ?

 ?

 ?

9.42

MA12-224

 ?

 ?

 ?

217.0

 ?

 ?

 ?

259.0

 ?

 ?

 ?

42.0

 ?

 ?

 ?

166.8

 ?

 ?

 ?

-49.4

 ?

 ?

 ?

32.2

 ?

 ?

 ?

166.2

 ?

 ?

 ?

198.4

 ?

 ?

 ?

308.0

 ?

 ?

 ?

0.87

MA12-228

 ?

 ?

 ?

108.0

 ?

 ?

 ?

130.0

 ?

 ?

 ?

22.0

 ?

 ?

 ?

162.1

 ?

 ?

 ?

-50.2

 ?

 ?

 ?

16.9

 ?

 ?

 ?

82.7

 ?

 ?

 ?

99.6

 ?

 ?

 ?

329.0

 ?

 ?

 ?

0.97

 ?

 ?

 ?

 ?

188.0

 ?

 ?

 ?

222.0

 ?

 ?

 ?

34.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

26.0

 ?

 ?

 ?

144.0

 ?

 ?

 ?

170.1

 ?

 ?

 ?

 ?

 ?

 ?

 ?

0.91

MA12-235

 ?

 ?

 ?

256.0

 ?

 ?

 ?

336.0

 ?

 ?

 ?

80.0

 ?

 ?

 ?

165.0

 ?

 ?

 ?

-50.0

 ?

 ?

 ?

61.3

 ?

 ?

 ?

196.1

 ?

 ?

 ?

257.4

 ?

 ?

 ?

383.0

 ?

 ?

 ?

0.49

MA12-237

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

165.0

 ?

 ?

 ?

-50.0

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

332.0

 ?

 ?

 ?

nsv

MA12-242

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

171.6

 ?

 ?

 ?

-47.6

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

380.0

 ?

 ?

 ?

nsv

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

MA12-249

 ?

 ?

 ?

227.0

 ?

 ?

 ?

363.0

 ?

 ?

 ?

136.0

 ?

 ?

 ?

166.1

 ?

 ?

 ?

-46.3

 ?

 ?

 ?

104.2

 ?

 ?

 ?

173.9

 ?

 ?

 ?

278.1

 ?

 ?

 ?

422.0

 ?

 ?

 ?

0.52

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?
Drill Hole
 ?

 ?

 ?
From (metres)
 ?

 ?

 ?
To (metres)
 ?

 ?

 ?
Length (metres)
 ?

 ?

 ?
Azimuth (360 deg)
 ?

 ?

 ?
Dip (angle below surface)
 ?

 ?

 ?
Est. True Thickness (metres)
 ?

 ?

 ?
From (Depth Below Surface (metres))
 ?

 ?

 ?
To (Depth Below Surface (metres))
 ?

 ?

 ?
Total Length of Hole (m)
 ?

 ?

 ?
Grade 40 gpt Capped (gpt gold)

Lovell Lake Area Exploration Drilling

MA12-214

 ?

 ?

 ?

41.0

 ?

 ?

 ?

91.0

 ?

 ?

 ?

50.0

 ?

 ?

 ?

158.1

 ?

 ?

 ?

-49.0

 ?

 ?

 ?

38.3

 ?

 ?

 ?

31.4

 ?

 ?

 ?

69.7

 ?

 ?

 ?

131.0

 ?

 ?

 ?

0.53

including

 ?

 ?

 ?

67.0

 ?

 ?

 ?

82.0

 ?

 ?

 ?

15.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

11.5

 ?

 ?

 ?

51.3

 ?

 ?

 ?

62.8

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.16

MA12-215

 ?

 ?

 ?

102.0

 ?

 ?

 ?

113.0

 ?

 ?

 ?

11.0

 ?

 ?

 ?

165.4

 ?

 ?

 ?

-50.9

 ?

 ?

 ?

8.4

 ?

 ?

 ?

78.1

 ?

 ?

 ?

86.6

 ?

 ?

 ?

125.0

 ?

 ?

 ?

0.49

MA12-216

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

166.0

 ?

 ?

 ?

-49.8

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

122.0

 ?

 ?

 ?

nsv

MA12-219

 ?

 ?

 ?

5.0

 ?

 ?

 ?

36.0

 ?

 ?

 ?

31.0

 ?

 ?

 ?

166.0

 ?

 ?

 ?

-50.6

 ?

 ?

 ?

23.7

 ?

 ?

 ?

3.8

 ?

 ?

 ?

27.6

 ?

 ?

 ?

125.0

 ?

 ?

 ?

0.45

MA12-220

 ?

 ?

 ?

11.0

 ?

 ?

 ?

27.0

 ?

 ?

 ?

16.0

 ?

 ?

 ?

163.9

 ?

 ?

 ?

-51.7

 ?

 ?

 ?

12.3

 ?

 ?

 ?

8.4

 ?

 ?

 ?

20.7

 ?

 ?

 ?

137.0

 ?

 ?

 ?

0.42

MA12-222

 ?

 ?

 ?

21.0

 ?

 ?

 ?

27.0

 ?

 ?

 ?

6.0

 ?

 ?

 ?

165.0

 ?

 ?

 ?

-50.9

 ?

 ?

 ?

4.6

 ?

 ?

 ?

16.1

 ?

 ?

 ?

20.7

 ?

 ?

 ?

131.0

 ?

 ?

 ?

0.61

 ?

 ?

 ?

 ?

37.0

 ?

 ?

 ?

69.0

 ?

 ?

 ?

32.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

24.5

 ?

 ?

 ?

28.3

 ?

 ?

 ?

52.9

 ?

 ?

 ?

 ?

 ?

 ?

 ?

0.56

MA12-223

 ?

 ?

 ?

81.0

 ?

 ?

 ?

105.0

 ?

 ?

 ?

24.0

 ?

 ?

 ?

161.8

 ?

 ?

 ?

-48.3

 ?

 ?

 ?

18.4

 ?

 ?

 ?

62.0

 ?

 ?

 ?

80.4

 ?

 ?

 ?

161.0

 ?

 ?

 ?

0.60

including

 ?

 ?

 ?

88.0

 ?

 ?

 ?

98.0

 ?

 ?

 ?

10.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

7.7

 ?

 ?

 ?

67.4

 ?

 ?

 ?

75.1

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.14

MA12-225

 ?

 ?

 ?

43.0

 ?

 ?

 ?

120.0

 ?

 ?

 ?

77.0

 ?

 ?

 ?

163.3

 ?

 ?

 ?

-50.1

 ?

 ?

 ?

59.0

 ?

 ?

 ?

32.9

 ?

 ?

 ?

91.9

 ?

 ?

 ?

161.0

 ?

 ?

 ?

0.52

including

 ?

 ?

 ?

43.0

 ?

 ?

 ?

56.0

 ?

 ?

 ?

13.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

10.0

 ?

 ?

 ?

32.9

 ?

 ?

 ?

42.9

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.67

 ?

 ?

 ?

 ?

150.0

 ?

 ?

 ?

154.0

 ?

 ?

 ?

4.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

3.1

 ?

 ?

 ?

114.9

 ?

 ?

 ?

118.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

4.73

MA12-227

 ?

 ?

 ?

114.0

 ?

 ?

 ?

122.0

 ?

 ?

 ?

8.0

 ?

 ?

 ?

163.1

 ?

 ?

 ?

-47.8

 ?

 ?

 ?

6.1

 ?

 ?

 ?

87.3

 ?

 ?

 ?

93.5

 ?

 ?

 ?

191.0

 ?

 ?

 ?

0.48

MA12-229

 ?

 ?

 ?

63.0

 ?

 ?

 ?

133.0

 ?

 ?

 ?

70.0

 ?

 ?

 ?

162.1

 ?

 ?

 ?

-46.8

 ?

 ?

 ?

53.6

 ?

 ?

 ?

48.3

 ?

 ?

 ?

101.9

 ?

 ?

 ?

221.0

 ?

 ?

 ?

0.43

including

 ?

 ?

 ?

67.0

 ?

 ?

 ?

76.0

 ?

 ?

 ?

9.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

6.9

 ?

 ?

 ?

51.3

 ?

 ?

 ?

58.2

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.13

and

 ?

 ?

 ?

93.0

 ?

 ?

 ?

116.0

 ?

 ?

 ?

23.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

17.6

 ?

 ?

 ?

71.2

 ?

 ?

 ?

88.9

 ?

 ?

 ?

 ?

 ?

 ?

 ?

0.60

 ?

 ?

 ?

 ?

167.0

 ?

 ?

 ?

169.0

 ?

 ?

 ?

2.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.5

 ?

 ?

 ?

127.9

 ?

 ?

 ?

129.5

 ?

 ?

 ?

 ?

 ?

 ?

 ?

4.27

MA12-232

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

166.7

 ?

 ?

 ?

-49.5

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

161.0

 ?

 ?

 ?

nsv

 ?

 ?

 ?

 ?

122.0

 ?

 ?

 ?

124.0

 ?

 ?

 ?

2.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.5

 ?

 ?

 ?

93.5

 ?

 ?

 ?

95.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.87

MA12-234

 ?

 ?

 ?

97.0

 ?

 ?

 ?

126.0

 ?

 ?

 ?

29.0

 ?

 ?

 ?

164.4

 ?

 ?

 ?

-49.3

 ?

 ?

 ?

22.2

 ?

 ?

 ?

74.3

 ?

 ?

 ?

96.5

 ?

 ?

 ?

224.0

 ?

 ?

 ?

0.62

MA12-238

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

162.0

 ?

 ?

 ?

-50.2

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

161.0

 ?

 ?

 ?

nsv

MA12-239

 ?

 ?

 ?

96.0

 ?

 ?

 ?

140.0

 ?

 ?

 ?

44.0

 ?

 ?

 ?

168.1

 ?

 ?

 ?

-48.4

 ?

 ?

 ?

33.7

 ?

 ?

 ?

73.5

 ?

 ?

 ?

107.2

 ?

 ?

 ?

230.0

 ?

 ?

 ?

0.61

including

 ?

 ?

 ?

96.0

 ?

 ?

 ?

107.0

 ?

 ?

 ?

11.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

 ?

8.4

 ?

 ?

 ?

73.5

 ?

 ?

 ?

82.0

 ?

 ?

 ?

 ?

 ?

 ?

 ?

1.19

MA12-241

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

165.2

 ?

 ?

 ?

-50.9

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

230.0

 ?

 ?

 ?

nsv

Condemnation Drilling

MA12-209

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

342.6

 ?

 ?

 ?

-49.3

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

350.0

 ?

 ?

 ?

nsv

MA12-211

 ?

 ?

 ?

288.0

 ?

 ?

 ?

289.0

 ?

 ?

 ?

1.0

 ?

 ?

 ?

343.1

 ?

 ?

 ?

-49.9

 ?

 ?

 ?

0.8

 ?

 ?

 ?

220.6

 ?

 ?

 ?

221.4

 ?

 ?

 ?

452.0

 ?

 ?

 ?

2.46

MA12-221

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

167.7

 ?

 ?

 ?

-49.9

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

359.0

 ?

 ?

 ?

nsv

MA12-226

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

164.0

 ?

 ?

 ?

-48.8

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

347.0

 ?

 ?

 ?

nsv

MA12-231

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

339.9

 ?

 ?

 ?

-49.0

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

350.0

 ?

 ?

 ?

nsv

MA12-233

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

166.9

 ?

 ?

 ?

-50.8

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

nsv

 ?

 ?

 ?

254.0

 ?

 ?

 ?

nsv

About Prodigy Gold:Prodigy Gold Inc. (PDG: TSX.V)
is currently evaluating the development of the Magino mine gold project
in Ontario as an open-pit mining opportunity with the potential for
deeper, higher grade gold production. The Magino project contains
Indicated gold resources of 2,176,000 ounces grading 1.00 gpt gold (67.6
million tonnes), and 1,721,000 ounces of Inferred gold resources grading
0.99 gpt gold (54.2 million tonnes) at a cut off grade of 0.35 gpt gold.
A Preliminary Economic Assessment (PEA) shows a pre-tax NPV of $939
million and an IRR of 36% using a 5% discount rate for the project (see
Press Release dated December 22, 2011 and technical report available on
SEDAR or Prodigy's web site). The proposed operation would have total
gold production of 2,614,000 ounces and an average annual gold output of
249,300 ounces a year during an eleven year project life. Please note:
mineral resources that are not mineral reserves do not have demonstrated
economic viability. The PEA is preliminary in nature and includes
Inferred mineral resources that are considered too speculative
geologically to have economic considerations applied to them that would
enable them to be categorized as mineral reserves. There is no certainty
that the preliminary assessment will be realized.


A full feasibility study for the proposed open pit mining project at
Magino is scheduled for completion in 2012. Bringing the Magino mine
project through the feasibility process and towards production, is a
catalyst to growing Prodigy Gold and building substantial value for
Prodigy shareholders: Today's Discovery, Tomorrow's Future.


To view this map, please click on the following link: http://www.usetdas.com/pr/prodigymapmar192012.jpg.


Drill hole location map for the Magino Mine Project. A higher resolution
version of the map can be found on Prodigy's web site.


All scientific and technical information for the Magino project has been
reviewed and approved by Tom Pollock, P.Geo., Prodigy Gold′s Vice
President ? Exploration, who is a qualified person under the definitions
established by National Instrument 43-101. Drill core at Magino is
boxed, covered, and sealed at the drill rig and moved to the Prodigy
logging and sample preparation facilities by Prodigy Gold personnel. The
core is then split down the centre using a typical table fed circular
rock saw normally at one metre intervals. One half of the core is sent
for assay to Actlabs, 33 Iroquois Road, Timmins, ON, P4N 7C5, while the
other half is returned to the core box and stored at Prodigy′s sampling
facility in a secure, fenced off, area. Prodigy QA/QC procedures include
the regular use of blanks, standards and duplicate samples in addition
to sending 10% of the samples off to a second lab for check assays.
Samples assaying > 3.0 gpt gold are automatically re-assayed by the
metallic screen method. Gold assays greater than 40 gpt are capped at 40
gpt when calculating composite intervals in drill holes. Drill holes are
directed as much as possible perpendicular to the strike and dip of the
mineralization at Magino. As a rough estimate the true thickness of the
above intercepts is approximately 76%.

On behalf of the Board of Directors

Brian J. Maher

President
and Chief Executive Officer


Prodigy Gold Inc. was recognized as a TSX Venture 50 ? company
in 2012.

TSX Venture 50 is a trade-mark of TSX Inc. and is used
under license.

This news release includes certain forward-looking statements or
information.
All statements other than statements of historical
fact included in this release, including, without limitation, statements
relating to the potential mineralization and geological merits of the
Magino mine
property and other future plans, objectives or
expectations of Prodigy Gold Incorporated (the 'Company') are
forward-looking statements that involve various risks and uncertainties.
There can be no assurance that such statements will prove to be
accurate and actual results and future events could differ materially
from those anticipated in such statements.
Important factors that
could cause actual results to differ materially from the Company's plans
or expectations include risks relating to the actual results of current
exploration activities, fluctuating gold prices, possibility of
equipment breakdowns and delays, exploration cost overruns, availability
of capital and financing, general economic, market or business
conditions, regulatory changes, timeliness of government or regulatory
approvals and other risks detailed herein and from time to time in the
filings made by the Company with securities regulators.
The
Company expressly disclaims any intention or obligation to update or
revise any forward-looking statements whether as a result of new
information, future events or otherwise except as otherwise required by
applicable securities legislation. Neither
TSX Venture Exchange
nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the
adequacy or accuracy of this release.

Prodigy Gold Incorporated

Brian Maher, 1-604-688-9006

Fax:
1-604-688-9029

www.prodigygold.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Prodigy Gold Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.