Belvedere Resources Ltd.: High Grade Gold Discovery at Osikonmaki Prospect Confirmed and Extended
Hole_ID From To Interval Au (g/t) Au gram metres
BELOSI044* 4.31 27.35 23.04 5.8 133.6
including 7.53 21.71 14.18 9.14 129.6
BELOSI077* 26.4 42.05 15.65 9.96 155.9
BELOSI078* 46.04 100.3 54.26 2.91 157.9
including 46.04 65.9 19.86 6.32 125.6
BELOSI081 55.23 90.81 35.58 3.2 113.9
including 58.72 77.05 18.33 5.69 104.4
* Previously announced in a news release May 17, 2011, Sept 14, 2011 and Feb 28, 2012
Table 1: All intersections into Upper East HW zone. Intersections are based on a 0.3 g/t Au cut-off (higher grade intervals at 1.0 g/t Au cut-off) with a grade thickness greater than 2 gram metres. No top cut is applied. Maximum grade is 69.6 g/t Au over 0.67 metres (BELOSI081), one of 20 individual samples over 10 g/t Au (0.32 oz/t). Intersections are estimated to be 70-90% of true width.
David Pym CEO of Belvedere and Mark Burridge, Chairman of the JV partner REBgold comment "With every intersection into the new discovery yielding greater than 100 gram metres of gold the new zone confirms the potential to rapidly build on the current resource at Osikonmäki East. It's position in the hanging wall to the main shear zone, which hosts the bulk of the mineralisation at Osikonmäki East adds substantially to the potential on the prospect. While the Osikonmäki East prospect continues to grow, the company remains excited about the overall potential of the Rantasalmi Property. Other prospects such as Osikonmäki West and Pirilä areas have not been re-evaluated since their discovery in the late 1980's and the exploration potential for further discoveries appears significant with several gold mineralised boulder trains yet to be traced to source on the property.
Additional drill hole results not previously announced are published below.
Hole_ID From To Interval Au (g/t) Au gram metres
BELOSI081 17.16 20.15 2.99 1.15 3.4
BELOSI081 55.23 90.81 35.58 3.2 113.9
BELOSI081 96.33 130.88 34.55 0.69 23.7
BELOSI081 160.38 165.7 5.32 1.65 8.8
BELOSI081 178.93 188.12 9.19 0.36 3.3
BELOSI082 189.8 193.97 4.17 0.51 2.1
BELOSI084 125.24 131.23 5.99 1.49 8.9
BELOSI084 163.11 172.93 9.82 0.93 9.1
BELOSI086 96.33 97.25 0.92 2.52 2.3
BELOSI086 110.06 118.14 8.08 0.43 3.4
BELOSI090 9.09 18.04 8.95 0.65 5.8
BELOSI091 68.62 73.64 5.02 0.49 2.5
Table 2: Intersections are based on a 0.3 g/t Au cut-off with a grade thickness greater than 2 gram metres. No top cut is applied. Intersections are estimated to be 70-90% of true width.
Other drill holes confirmed the depth and Western strike potential of the systems. BELOSI 84 was drilled to target the main shear zone at depth on the eastern portion of the shear zone. The hole intersected 9.8m at 0.9g/t and identified additional mineralisation in the hanging wall, including 6m at 1.5 g/t.
BELOSI 82 was drilled to test the depth extension of the main shear zone 700 m further to the west, and it confirmed the extension of the shear zone at depth but assay results were modest, at around 0.5g/t. The hole appears to have intersected the low grade zone in-between the higher grade chutes identified in previous holes.
BELOSI 83 and BELOSI 85-91 were shallow exploratory holes drilled to test the shear zone as it continues westwards towards the Osikonmäki West mineralisation. The main shear was intersected in all holes but from the limited drilling undertaken, grades appear generally lower in this portion of the shear zone, with individual samples up to 2.5 g/t gold recorded.
Other ongoing work related to the project include: the surveying and QA/QC assaying of historic holes not used in the previous resource estimates. These, combined with the results from this year's drilling program, will form the basis for updating the mineral resource estimate.
Osikonmäki Geology: The Osikonmäki project occurs in a three kilometer long shear complex, hosted by a Proterozoic aged Tonalitic Intrusion. Most of the drilling to date has focused on the Eastern 800m of the shear where the mineralisation is primarily associated with a 45 °south dipping shear zone between 4 and 30 m thick. A series of higher grade chutes pitch at shallow angles across the plane of the main shear, plunging 20°to the ESE contain the better part of the mineralisation and extend for at least 600 m down plunge. These chutes have been grouped into three principle lode systems the S, T and U lode systems. The following resources have been outlined on the Rantasalmi Property to date:
Property Prospect Resource
Category Tonnes Au g/t Contained Oz's
Rantasalmi Osikonmäki East Indicated 1,296,000 1.7 68,000
Rantasalmi Osikonmäki East Inferred 3,542,000 2.09 244,000
Rantasalmi Osikonmäki West Historical 90,000 4.86 14,000
Rantasalmi Pirilä Historical 150,000 8.9 43,000
Table 3:Mineral Resources at Rantasalmi.
The drilling was undertaken by Drillcon SMOY of Finland, providing 42 mm diameter core. Samples are comprised of half diamond core. Intersections are estimated to be 70-90% of true width. No top cuts are applied with the highest individual assay being 47.8 g/t gold over 0.46 metres. Core samples are sawn in half on site, prepped and assayed by 30g fire assay with an AAS finish at the internationally accredited laboratories of ALS Chemex in Finland. The quality assurance-quality control (QAQC) program of Belvedere consists of the insertion of certified standards of known gold content every 20 samples, with blanks at the beginning of each batch. In addition, ALS Chemex inserts a number of blanks and standards into the analytical process. Standards, blanks and duplicates make up approximately 15% of the samples assayed. The remaining half core is retained on site for verification and reference purposes.
hole_id x y z max_depth Azimuth Dip
BELOSI078 3564360 6883202 117.8 101.50 180 45
BELOSI079 3564400 6883138 117.3 80.50 0 45
BELOSI080 3564440 6883126 117.4 101.55 0 60
BELOSI081 3564400 6883195 120.0 205.30 180 65
BELOSI082 3563760 6882865 102.7 221.40 0 60
BELOSI083A 3563600 6882890 105.3 56.50 0 60
BELOSI083 3563600 6882888 105.3 156.85 0 60
BELOSI084 3564400 6883080 114.1 200.15 0 65
BELOSI085 3563440 6883015 105.5 57.90 0 45
BELOSI086 3563600 6882935 105.6 131.70 0 60
BELOSI087 3563440 6882970 110.0 71.40 0 60
BELOSI088 3563240 6883040 115.7 68.20 0 45
BELOSI089 3563240 6882995 115.3 89.15 0 45
BELOSI090 3563320 6883050 114.3 49.53 0 45
BELOSI091 3563315 6883005 114.8 79.95 0 45
Table 4: Details of drillhole locations.
The resources were previously announced in a press release on 11th October, 2011. An NI 43-101 compliant Technical Report "Mineral Resource Estimate of the Rantasalmi Gold Project in Finland" filed on SEDAR October 19th, 2011. The mineral resource estimate for Osikonmäki East was prepared by Golder Associates (UK) Ltd under the supervision of Alexandra Akyurek (CSci, MSc MIMMM), acting as an independent "Qualified Person" as defined by National Instrument 43-101. Mrs Akyurek is a member of the Institute of Materials, Minerals and Mining (Member #447670). The Qualified Person has not done sufficient work to classify the historical estimates at Osikonmäki West and Pirilä as current resources under NI 43-101, and suggests that the historical estimates should be considered an historical reference of tonnes and grade, and not resources. These historical estimates have not been validated by Golder and no reliance should be placed on these figures.
About the Joint Venture with REBgold (TSX VENTURE:RBG)
REBgold Corporation has the right to earn up to a 50% interest in a special purpose joint venture company which holds the Kiimala and Rantasalmi projects by contributing expenditures of C$6 million over a 4 year period. If REBgold proceeds with and completes the feasibility study it will increase its stake in the projects to between 55% and 75% depending on the level of Belvedere's contribution to the study. A further 5% can be earned if REBgold's bioleaching technology can lead to a material improvement in the project economics.
Forward Looking Statement:
Some of the statements contained herein may be forward-looking statements, which involve known and unknown risks and uncertainties. Without limitation, statements regarding future plans and objectives of the Company (including statements relating to future drill results) are forward- looking statements that involve various degrees of risk. It is important to note that the Company's actual results could differ materially from those in such forward-looking statements.
Qualified Person:
The technical aspects of this news release have been prepared by Dr Toby Strauss (CGeol), who is acting as Qualified Person in compliance with National Instrument 43-101 with respect to this release. Toby Strauss is Chief Operating Officer of Belvedere Resources Ltd. The data supporting this news release has been provided in a Surpac database and has been verified against the original laboratory assay certificates. The Qualified Person has not undertaken any independent sampling of the drill core, but has reviewed the QA/QC procedures, and considers the results to be within expected margins of error.
About Belvedere:
Belvedere Resources Limited is a mining company incorporated in British Columbia with a primary focus on nickel, gold, cobalt and copper in Finland. The Company currently produces 2500t of nickel in concentrate/year from the Hitura nickel mine in Central Finland. The Company has a number of advanced gold projects in close proximity to the Hitura mine.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of the contents of this release.
Contact Information
Belvedere Resources Ltd.
David Pym, CEO
www.belvedere-resources.com
Humbercrest Capital Inc.
Scott Findlay
+1 647 274 2536