• Dienstag, 23 Juli 2024
  • 12:25 Uhr Frankfurt
  • 11:25 Uhr London
  • 06:25 Uhr New York
  • 06:25 Uhr Toronto
  • 03:25 Uhr Vancouver
  • 20:25 Uhr Sydney

Goldcorp Reports 2012 First Quarter Results

25.04.2012  |  CNW

Toronto Stock Exchange: G

New York Stock Exchange: GG

(All Amounts in $US unless stated otherwise)

VANCOUVER, April 25, 2012 /CNW/ - GOLDCORP INC.

,

today reported that adjusted net earnings(1) in the quarter increased to $404 million, or $0.50 per share,compared to $392million, or $0.49per share, in the first quarter of 2011.  Reported net earnings were $479 million compared to $651million in the first quarter of 2011.  Operating cashflows before working capital changes(2) were $480 million.  Gold production totaled 524,700 ounces at a total cash cost(3) of $251 per ounce.

First Quarter 2012 Highlights


-- Revenues increased 11% to $1.3billion on gold sales of
545,700ounces.
-- Operating cash flow before working capital changes increased 4%
to $480million or $0.59per share.
-- Adjusted net earnings increased 3% over the 2011 first quarter,
to $404 million or $0.50per share.
-- Cash costs totaled $251per ounce on a by-product basis and $648
per ounce on a co-product basis.
-- Dividends paid amounted to $109million.
-- Quarter-end cash balance of $1.4billion; net cash position of
$0.5 billion4.
-- High Pressure Grinding Roll ('HPGR') supplemental feed system
commissioned at Peñasquito.

'Solid operating results throughout most of our mine portfolio were offset by a challenging first quarter at Red Lake,' said Chuck Jeannes, Goldcorp President and Chief Executive Officer.  'Adverse ground conditions at Red Lake delayed the development of new mining faces in the High Grade Zone which, taken together with lower grade in other areas of the mine, led to our slow start to 2012.  Our Mexican operations were a particular area of strength in the first quarter, highlighted by the successful commissioning of the final component of Peñasquito's processing line which positions the mine for strong performance over the balance of 2012.

'The pace of construction and development activities at our growth projects remained impressive in the first quarter as well.  The Pueblo Viejo joint venture in the Dominican Republic is nearing completion and set to be our next source of new gold production in mid-2012. The Cerro Negro project in Argentina continues to progress toward expected initial gold production in the second half of 2013, and ongoing exploration success there is enhancing the prospects for additional gold reserve growth.  In Canada, construction remains on track at Éléonore for late 2014, which is expected to become one of the country's largest new underground gold mines. The 2014 planned completion of the Cochenour project in Red Lake, Ontario will supplement Red Lake's production profile with sustained, low-cost production and the potential for new exploration success in this world-class camp.'

Financial Review

Gold sales in the first quarter were 545,700ounces on production of 524,700ounces.  This compares to sales of 627,300ounces on production of 637,600ounces in the first quarter of 2011. Silver production totaled 6.6 million ounces compared to silver production of 6.1 million ounces in the prior year's first quarter.  Total cash costs were $251per ounce of gold on a by-product basis.  On a co-product basis, cash costs were $648per ounce, impacted primarily by lower overall gold production.

Net earnings in the quarter were $479million compared to $651million in the first quarter of 2011. Adjusted net earnings in the first quarter totaled $404million, or $0.50per share, compared to $392million or $0.49per share, in the first quarter of 2011.  Adjusted net earnings in the first quarter of 2012 primarily exclude the gains from the foreign exchange translation of deferred income tax liabilities; mark-to-market losses relating to a term silver sales contract; mark-to-market gains on the conversion feature of convertible senior notes and impairment charges related to certain of its equity investments; but include the impact of non-cash stock-based compensation expenses which amounted to approximately $28million or $0.03 per share for the quarter.  Operating cash flow before changes in working capital was $480million compared to $463million in last year's first quarter.  An average realized gold price of $1,707per ounce for the quarter and total cash costs of $251per ounce resulted in a gold margin(5) of $1,456per ounce of gold sold

Mexico

Gold and silver production at Peñasquito in the first quarter was 68,600 and 4,955,400 ounces respectively while lead and zinc production totaled 39.2 million pounds and 63.8 million pounds, respectively.  Strong by-product production contributed to total cash costs of negative $751 per ounce of gold.

The Company announced on March 28(th) the successful commissioning of the HPGR supplemental feed system, positioning the mine to achieve design processing capacity.   As expected, plant throughput during the first quarter of 2012 was affected by the tie-in and commissioning of the HPGR system as well as planned milling circuit maintenance.  The mine remains on track to achieve estimated 2012 production guidance of 425,000 ounces of gold.  Activities at Peñasquito over the balance of 2012 will focus on further optimization of the processing plant as well as commissioning of the Waste Rock Overland Conveyor system expected in the second half of this year.

Gold production at Los Filos in the first quarter was 82,700 ounces at a total cash cost of $521 per ounce.  The construction of new phases of the heap leach pad facility is progressing well and is on track for completion late in the second quarter of 2012.  The 2012 exploration program is continuing to follow up on 2011 drilling success through the exploration of the Los Filos pit towards the 4P south area, and El Bermejal pit towards the northwest.  The Company is pleased to announce that Los Filos has been awarded Goldcorp's highest safety award for the third year in a row.  The Los Filos team's sustained commitment to safety excellence is the embodiment of Goldcorp's dedication to fostering a world-class safety culture throughout the organization.

Canada

At Red Lake in Ontario, first quarter gold production was 114,200 ounces at a total cash cost of $523 per ounce.  Adverse ground conditions in the High Grade Zone delayed access to planned high grade stopes.  Inconsistent mineralization in the Footwall Zones and lower-than expected grades in the Campbell zone, also contributed to lower overall gold production.

Drilling continued from the 4199 exploration ramp during the first quarter of 2012. The focus of exploration activities remains on the High Grade Zone at depth, testing for the possibility of fault offsets and extensions of the High Grade Zone beyond the current five year reserve. Drilling in this area has intersected large carbonate veins, as well as zones of high-grade gold mineralization. These intercepts, located 10-50 metres from the projection of the High Grade Zone, appear to be either the fault offset or a new zone.

At Porcupine in Ontario, gold production during the first quarter increased to 60,700 ounces at a total cash cost of $786 per ounce, driven by higher throughput.  The Hoyle Pond Deep project continued to advance to access both depth extensions of current ore bodies and newly-discovered zones and to enhance operational flexibility and efficiencies throughout the Hoyle Pond operation.  The commencement of full-face shaft sinking is planned for the second quarter of 2012.  Work related to the Hollinger open pit project focused on completing the first kilometer of haul road construction between the Hollinger site and the Dome mill and equipment purchases, with the first of two shovels arriving on site for assembly during the first quarter of 2012. The development phase of the project will continue for a period of 12-18 months, with initial ore feed from Hollinger expected through the mill in the second half of 2012.

Exploration during the first quarter of 2012 focused on current mineralized zones at Hoyle Pond, including follow-up drilling on positive results achieved in the high-grade VAZ zone. Surface drill programs were focused on targets near the Hoyle Pond Mine as well as a conceptual target near Dome Mine.

Gold production at Musselwhite during the first quarter totaled 53,200 ounces at a total cash cost of $844 per ounce.  Exploration in the first quarter focused on continued definition of the Lynx Zone from surface and underground. Surface drilling on Lynx targeted the along-strike extent while two ice rigs targeted the up-dip extent above the current resource. Drilling on the up-dip extent of the Lynx returned positive results and the zone was also intersected at the North Shore, a distance of 1.5 kilometres north of the current resource boundary. Underground drilling has also returned positive results for the C-block of the PQ Deeps north of the 2011 resource boundary. Additionally, early stage exploration of the West Limb target has returned positive results, with a number of mineralized shears intersected in the drilling.

Guatemala

At Marlin in Guatemala, gold and silver production decreased 32% and 6% from the first quarter 2011 to a total of 53,200 ounces and 1,663,100 ounces respectively.  Cash costs totaled negative $187 per ounce.  The decreases in gold and silver production are consistent with the mine plan following completion of open pit mining operations in the Marlin pit at the end of 2011. Development of the West Vero Zone has progressed as planned and initial production from this area is expected during the second quarter of 2012. Drilling to extend the Delmy vein to the north is also showing positive results.

Advancing the Project Pipeline

At the Pueblo Viejo project in the Dominican Republic, overall construction is approximately 93% complete, with initial production expected in mid-2012. At the end of the first quarter, about 15 million tonnes of ore were stockpiled; representing approximately 1.7 million contained gold ounces. Construction of the tailings facility progressed during the first quarter with the receipt of all permits to allow construction of the starter dam to its full design height. The oxygen plant is on track for pre-commissioning testing in the second quarter of 2012 and full commissioning of the first two of four autoclaves is expected to occur in the second quarter. The Piedra Blanca Substation was commissioned and the site is now able to draw energy from the grid, in the near-term.

As part of a longer-term, optimized power solution for Pueblo Viejo, the Company is advancing a plan to construct a dual fuel power plant at an estimated incremental cost of approximately $300 million (100% basis) or $120 million (Goldcorp's share), of which 90% is committed.  The new plant is expected to provide lower cost, long-term power to the project. Earth work for the new power plant has commenced.

At the Cerro Negro project in Argentina, activities at site continued to advance the project in the overall categories of infrastructure and construction, mine development and exploration. The development plan calls for concurrent mining from multiple veins, with initial mining to take place in the Eureka, Mariana Central and Mariana Norte veins.  Total underground ramp development for the Eureka vein remained at 1,621 metres of the total 3,900 metres planned, while drifts were driven into the Eureka vein on the 476 and 450 levels.  These levels will become the first production blocks to be mined this year.  Lateral development continued as planned and ore from the Eureka vein is anticipated to be mined and stockpiled on the surface during 2012.  Development of the Mariana Central and Mariana Norte veins also continued to advance in the first quarter of 2012.  Surface excavations and earthworks related to the mine portals for decline development continued. Engineering, Procurement and Construction Management was 31% complete at the end of the first quarter of 2012.

Strong exploration results continued at Cerro Negro throughout the first quarter from a total of 118 holes drilled.  The primary focus of drilling remains on the in-fill and expansion of the Mariana Central, Mariana Norte and San Marcos deposits, as well as completion of condemnation drilling at primary infrastructure locations. Exceptionally strong results were achieved in the Mariana Norte Hanging Wall quartz vein, San Marcos Sur and Mariana Central.

The Company is subject to import restrictions enacted in Argentina during the first quarter with respect to equipment and materials required for the construction of the Cerro Negro project.  While certain delays have been experienced, construction currently remains on schedule for initial gold production in the second half of 2013.

At the Éléonore project in Quebec, construction activities continued to advance on the dual shaft mine design that is expected to feed the 7,000 tonne-per-day plant.  The production shaft has been collared and construction of associated infrastructure continued to progress well.  The Gaumond exploration shaft reached a depth of 691 metres with completion to full 718 metre depth on track for the second quarter of 2012.  The exploration ramp has now advanced 1,200 metres in length and definition drilling is expected to take place from the ramp starting in the third quarter 2012.

Exploration in 2012 continues to focus on increasing the level of confidence in the geological and resources models. Approximately, 45 kilometres of drilling is planned for the year from a combination of surface and underground drills in addition to nine kilometres of expected definition drilling. Three surface rigs were active in the first quarter, with nearly 15,000 metres drilled.  Activities have initially targeted the upper portion of the ore body above 650 metres and drilling is now focusing between 650 metres and 800 metres in the center portion of the ore body and in the northern portion of near-surface low-grade gold mineralization.

At the Cochenour project in Ontario, widening of the historical Cochenour shaft continued to advance, with 154 metres completed of a total depth of 238 metres.  The Cochenour-Red Lake haulage drift that will transport ore from Cochenour to existing Red Lake processing facilities advanced to 43% of completion.  Exploration drilling from the haulage drift is continuing with two drills in operation.  Diamond drilling with three drills at surface is underway to define the top portion of the Bruce Channel deposit and additional resources at Cochenour.

Successful exploration and development work also continued at Camino Rojo, an advanced-stage district project near Peñasquito.  Drilling has demonstrated that sulphide mineralization extends at depth for at least 400 metres west of the Represa resource. The resource block and geologic models were completed early in the current quarter, and a feasibility study remains on track to be available by mid-2012. At Noche Buena, another advanced-stage district project near Peñasquito, the focus in the first quarter remained on completion of the geologic model and an updated feasibility study is in progress for completion mid-2012.

At the El Morro project in Chile, construction planning and detailed engineering for facilities in the areas approved by the Environmental Impact Assessment ('EIA') continued to progress. Detailed engineering of fresh water and concentrate pipelines is expected to be completed in the third quarter of 2012.  Detailed engineering of the desalination plant continues and a commitment to purchase equipment has been signed.  Detailed engineering for power line towers and foundations is also progressing.  Mine and plant equipment selection process in ongoing.  The detailed design for the tailings dam are expected to be sufficiently complete in second quarter of 2012 which will allow for application for sectoral permits in the third quarter. Condemnation drilling activities at site continued with over 20 kilometres drilled to date and 8,500 metres in the first quarter of 2012.

2012 Outlook

Goldcorp's current 2012 gold production guidance is 2.6 million ounces at total cash costs of $250 to $275 per ounce of gold on a by-product basis and $550 to $600 per ounce of gold on a co-product basis. The Company is currently analyzing the potential impact of first quarter production delays at Red Lake to Goldcorp's overall 2012 production and cash costs.

This release should be read in conjunction with Goldcorp's first quarter 2012 financial statements and MD&A report on the Company's website, www.goldcorp.com, in the 'Investor Resources - Reports & Filings' section under 'Quarterly Reports'.

A conference call will be held on April 26, 2012 at 10:00 a.m. (PDT) to discuss the first quarter results. Participants may join the call by dialing toll free 1-800-355-4959 or 1-416-695-6617 for calls from outside Canada and the US.  A recorded playback of the call can be accessed after the event until May 27, 2012 by dialing 1-800-408-3053 or 1-905-694-9451 for calls outside Canada and the US.  Pass code: 6608575.  A live and archived audio webcast also be available at www.goldcorp.com.

Goldcorp is one of the world's fastest growing senior gold producers.  Its low-cost gold production is located in safe jurisdictions in the Americas and remains 100% unhedged.



(1) Adjusted net earnings and adjusted net earnings per
share are non-GAAP performance measures. The Company
believes that, in addition to conventional measures
prepared in accordance with GAAP, the Company and
certain investors use this information to evaluate the
Company's performance. Accordingly, it is intended to
provide additional information and should not be
considered in isolation or as a substitute for measures
of performance prepared in accordance with GAAP. Refer
to page 38 of the 2012 first quarter MD&A for a
reconciliation of adjusted earnings to reported net
earnings attributable to shareholders of Goldcorp.



(2) Operating cash flows before working capital changes is a
non-GAAP performance measure which the Company believes
provides additional information about the Company's
ability to generate cash flows from its mining
operations.



Cash provided by operating activities reported in
accordance with GAAP was $322 million for the three
months ended March 31, 2012.



(3) The Company has included non-GAAP performance measures,
total cash costs, by-product and co-product, per gold
ounce, throughout this document. The Company reports
total cash costs on a sales basis. In the gold mining
industry, this is a common performance measure but does
not have any standardized meaning. The Company follows
the recommendations of the Gold Institute Production
Cost Standard. The Company believes that, in addition to
conventional measures prepared in accordance with GAAP,
the Company and certain investors use this information
to evaluate the Company's performance and ability to
generate cash flow. Accordingly, it is intended to
provide additional information and should not be
considered in isolation or as a substitute for measures
of performance prepared in accordance with GAAP. Total
cash costs on a by-product basis are calculated by
deducting by-product copper, silver, lead and zinc sales
revenues from production cash costs.



Commencing in 2011, production costs are allocated to
each co-product based on the ratio of actual sales
volumes multiplied by budget metals prices of $1,250 per
ounce of gold, $20 per ounce of silver, $3.25 per pound
of copper, $0.90 per pound of lead and $0.90 per pound
of zinc, rather than realized sales prices. Using
actual realized sales prices, the co-product total cash
costs would be $654 per gold ounce for the three months
ending March 31, 2012. Refer to page 37 of the 2012
first quarter MD&A for a reconciliation of total cash
costs to reported production costs.



(4) Net cash position is the quarter-end cash balance less
the face value of the convertible debenture of $862
million which includes the liability and equity
components.



(5) The Company has included a non-GAAP performance measure,
margin per gold ounce, throughout this document. The
Company reports margin on a sales basis. The Company
believes that, in addition to conventional measures,
prepared in accordance with GAAP, the Company and
certain investors use this information to evaluate the
Company's performance and ability to generate cash flow.
Accordingly, it is intended to provide additional
information and should not be considered in isolation or
as a substitute for measures of performance prepared in
accordance with GAAP.



______________________________________________________
|(in $ millions, except where noted - | Q1'12|
|Unaudited) | |
|______________________________________________|_______|
|Revenues per Financial Statements | $1,349|
|______________________________________________|_______|
|Treatment and refining charges on concentrate | 45|
|sales | |
|______________________________________________|_______|
|By-product silver, copper, lead and zinc sales| (462)|
|______________________________________________|_______|
|Gold revenues | 932|
|______________________________________________|_______|
|Divided by ounces of gold sold |545,700|
|______________________________________________|_______|
|Realized gold price per ounce | $1,707|
|______________________________________________|_______|
|Deduct total cash costs per ounce of gold | 251|
|sold3 | |
|______________________________________________|_______|
|Margin per gold ounce | $1,456|
|______________________________________________|_______|





Cautionary Note Regarding Forward-Looking Statements

This press release contains 'forward-looking statements', within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of Goldcorp Inc. ('Goldcorp'). Forward-looking statements include, but are not limited to, statements with respect to the future price of gold, silver, copper, lead and zinc, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage.  Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as 'plans', 'expects', 'is expected',  'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates', 'believes' or variations of such words and phrases or statements that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur' or 'be achieved' or the negative connotation thereof.

Forward-looking statements are made based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performances or achievements of Goldcorp to be materially different from future results, performances or achievements expressed or implied by such statements.  Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which Goldcorp will operate in the future, including the price of gold, anticipated costs and ability to achieve goals. Certain important factors that could cause actual results, performances or achievements to differ materially from those in the forward-looking statements include, among others, gold price volatility, discrepancies between actual and estimated production, mineral reserves and resources and metallurgical recoveries, mining operational and development risks, litigation risks, regulatory restrictions (including environmental regulatory restrictions and liability), activities by governmental authorities (including changes in taxation), currency fluctuations, the speculative nature of gold exploration, the global economic climate, dilution, share price volatility, competition, loss of key employees, additional funding requirements and defective title to mineral claims or property.  Although Goldcorp has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended.

Forward-looking statements are subject to known and unknown risks, uncertainties and other important factors that may cause the actual results, level of activity, performance or achievements of Goldcorp to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the integration of acquisitions; risks related to international operations, including economical and political instability in foreign jurisdictions in which Goldcorp operates; risks related to current global financial conditions; risks related to joint venture operations; actual results of current exploration activities; environmental risks; future prices of gold, silver, copper, lead and zinc; possible variations in ore reserves, grade or recovery rates; mine development and operating risks; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; risks related to indebtedness and the service of such indebtedness, as well as those factors discussed in the section entitled 'Description of the Business - Risk Factors' in Goldcorp's annual information form for the year ended December 31, 2011available at www.sedar.com.  Although Goldcorp has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.  There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, readers should not place undue reliance on forward-looking statements.  Forward-looking statements are made as of the date hereof and accordingly are subject to change after such date.  Except as otherwise indicated by Goldcorp, these statements do not reflect the potential impact of any non-recurring or other special items or of any dispositions, monetizations, mergers, acquisitions, other business combinations or other transactions that may be announced or that may occur after the date hereof.  Forward-looking statements are provided for the purpose of providing information about management's current expectations and plans and allowing investors and others to get a better understanding of our operating environment. Goldcorp does not undertake to update any forward-looking statements that are included in this document, except in accordance with applicable securities laws.

FINANCIAL STATEMENTS TO FOLLOW





SUMMARIZED FINANCIAL RESULTS
(in millions of United States dollars,
except per share and per ounce amounts)

Three Months Ended
March 31

2012 2011

Revenues $1,349 $1,216

Gold produced (ounces) 524,700 637,600

Gold sold (ounces) 545,700 627,300

Copper produced(thousands of pounds) 24,100 21,400

Copper sold(thousands of pounds) 21,600 21,400

Silver produced (ounces) 6,618,500 6,143,400

Silver sold (ounces) 8,714,000 5,911,000

Lead produced(thousands of pounds) 39,200 36,500

Lead sold(thousands of pounds) 52,400 31,400

Zinc produced(thousands of pounds) 63,800 55,600

Zinc sold(thousands of pounds) 75,900 59,500

Average realized gold price(per ounce) $1,707 $1,394

Average London spot gold price(per ounce) $1,691 $1,386

Average realized copper price(per pound) $4.25 $4.27

Average London spot copper price(per pound) $3.77 $4.38

Average realized silver price(per ounce) $26.80 $28.91

Average London spot silver price(per ounce) $32.63 $31.86

Average realized lead price(per ounce) $0.96 $1.21

Average London spot lead price(per ounce) $0.95 $1.18

Average realized zinc price(per ounce) $0.98 $1.07

Average London spot zinc price(per ounce) $0.92 $1.09

Total cash costs - by-product(per gold
ounce) $251 $188

Total cash costs - co-product(per gold
ounce) $648 $504



Production Data:

Red Lake gold mines : Tonnes of ore milled 220,100 210,600

Average mill head
grade (grams per
tonne) 16 29

Gold ounces produced 114,200 186,100

Total cash cost per
ounce - by-product $523 $322

Porcupine mines : Tonnes of ore milled 1,017,800 1,010,300

Average mill head
grade (grams per
tonne) 2.07 2.02

Gold ounces produced 60,700 59,800

Total cash cost per
ounce - by-product $786 $733

Musselwhite mine : Tonnes of ore milled 327,400 350,200

Average mill head
grade (grams per
tonne) 5.43 6.22

Gold ounces produced 53,200 67,300

Total cash cost per
ounce - by-product $844 $621

Peñasquito : Tonnes of ore mined 8,224,751 13,859,300

Tonnes of waste
removed 32,225,155 31,048,200

Tonnes of ore milled 8,393,100 7,937,200

Average head grade
(grams per tonne) -
gold 0.36 0.31

Average head grade
(grams per tonne) -
silver 24.84 23.51

Average head grade
(%) - lead 0.31 0.32

Average head grade
(%) - zinc 0.56 0.53

Gold ounces produced 68,600 57,600

Silver ounces
produced 4,955,400 4,374,400

Lead (thousands of
pounds) produced 39,200 36,500

Zinc (thousands of
pounds) produced 63,800 55,600

Total cash cost per
ounce - by-product ($751) ($1,488)

Total cash cost per
ounce - co-product $726 $671

Los Filos mine : Tonnes of ore mined 7,391,100 6,016,300

Tonnes of waste
removed 10,368,400 9,468,100

Tonnes of ore
processed 7,404,300 6,034,000

Average grade
processed (grams per
tonne) 0.70 0.75

Gold ounces produced 82,700 94,600

Total cash cost per
ounce - by-product $521 $427

El Sauzal mine : Tonnes of ore mined 576,500 520,100

Tonnes of waste
removed 2,678,900 1,498,200

Tonnes of ore milled 516,300 525,800

Average mill head
grade (grams per
tonne) 1.37 1.53

Gold ounces produced 21,400 24,500

Total cash cost per
ounce - by-product $605 $499

Marlin mine : Tonnes of ore milled 477,900 373,200

Average mill head
grade (grams per
tonne) - gold 3.49 6.91

Average mill head
grade (grams per
tonne) - silver 118 166

Gold ounces produced 53,200 77,800

Silver ounces
produced 1,663,100 1,769,000

Total cash cost per
ounce - by-product ($187) ($324)

Total cash cost per
ounce - co-product $501 $330

Alumbrera mine :(1) Tonnes of ore mined 2,311,700 990,200

Tonnes of waste
removed 5,394,500 4,936,500

Tonnes of ore milled 3,499,900 3,396,000

Average mill head
grade (grams per
tonne) - gold 0.36 0.45

Average mill head
grade (%) - copper 0.39 0.39

Gold ounces produced 27,600 34,100

Copper (thousands of
pounds) produced 24,100 21,400

Total cash cost per
ounce - by-product ($1,131) ($232)

Total cash cost per
ounce - co-product $918 $862

Marigold mine :(2) Tonnes of ore mined 1,713,200 2,033,200

Tonnes of waste
removed 6,785,400 6,490,700

Tonnes of ore
processed 1,713,200 2,033,200

Average grade
processed (grams per
tonne) 0.65 0.54

Gold ounces produced 26,500 22,500

Total cash cost per
ounce - by-product $679 $785

Wharf mine : Tonnes of ore mined 716,200 606,000

Tonnes of ore
processed 737,900 574,300

Average grade
processed (grams per
tonne) 0.94 0.65

Gold ounces produced 16,600 13,300

Total cash cost per
ounce - by-product $663 $898



Financial Data:

Cash provided by operating activities of
continuing operations $322 $586

Net earnings from continuing operations
attributable to shareholders of Goldcorp
Inc. $479 $651

Net earnings attributable to shareholders
of Goldcorp Inc. $479 $651

Net earnings per share from continuing
operations - basic $0.59 $0.82

Net earnings per share - basic $0.59 $0.82

Adjusted net earnings per share - basic $0.50 $0.49

Weighted average number of shares
outstanding (000's) 810,046 798,462



(1) Shown at Goldcorp's interest - 37.5%

(2) Shown at Goldcorp's interest - 66.7%





CONDENSED INTERIM CONSOLIDATED STATEMENTS OF EARNINGS

(In millions of United States dollars, except for per share amounts - Unaudited)





Three Months
Ended March 31



2012 2011

Revenues $ 1,349 $ 1,216

Mine operating costs

Production costs (559) (451)

Depreciation and depletion (158) (164)

(717) (615)

Earnings from mine operations 632 601

Exploration and evaluation costs (19) (12)

Share of net (losses) and earnings of (22) 2
associates

Corporate administration (72) (58)

Earnings from operations and associates 519 533

(Losses) gains on securities (5) 320

Gains (losses) on derivatives, net 55 (57)

Finance costs (6) (6)

Other income 14 22

Earningsbefore taxes 577 812

Income taxes (98) (161)

Net earnings attributable toshareholders $ 479 $ 651
of Goldcorp Inc.

Net earnings per share

Basic $ 0.59 $ 0.82

Diluted 0.51 0.81




CONDENSED INTERIM CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

(In millions of United States dollars - Unaudited)





Three Months
Ended March31



2012 2011

Net earnings attributable to shareholders of $ 479 $ 651
Goldcorp Inc.

Other comprehensiveincome (loss), net of tax

Mark-to-market gains (losses) on securities 12 (63)

Reclassification adjustment for impairment 5 -
losses included in net earnings

Reclassification adjustment for realized - (295)
gain on disposition of securities included
in net earnings

17 (358)

Total comprehensive income attributable to $ 496 $ 293
shareholders of Goldcorp Inc.







CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS

(In millions of United States dollars - Unaudited)





Three Months
EndedMarch 31

2012 2011

Operating Activities

Net earnings from continuing $ 479 $ 651
operations

Adjustments for:

Reclamation expenditures (5) (4)

Losses (gains) on securities 5 (320)

Items not affecting cash

Depreciation and depletion 158 164

Share of net losses and (earnings) 22 (2)
of associates

Share-based compensation expense 28 22

Unrealized (gains) losses on (55) 49
derivatives, net

Accretion of reclamation and 4 3
closure cost obligations

Deferred income tax recovery (155) (100)

Other (1) -

Change in working capital (158) 123

Net cash provided by operating 322 586
activities

Investing Activities

Expenditures on mining interests (540) (346)

Deposits on mining interests (50) (6)
expenditures

Interest paid (9) (9)

Repayment of capital investment in - 64
Pueblo Viejo

Purchases of securities and other (14) (6)
investments

Proceeds from sales of securities and 273 519
other investments, net

Other 8 (4)

Net cash (used in) provided by (332) 212
investing activities

Net cash provided by investing 5 -
activities of discontinued operations

Financing Activities

Common shares issued, net of issue 6 11
costs

Dividends paid to shareholders (109) (75)

Net cash used in financing activities (103) (64)

Effect of exchange rate changes on - (10)
cash and cash equivalents

(Decrease) increase in cash and cash (108) 724
equivalents

Cash and cash equivalents, beginning 1,502 556
of period

Cash and cash equivalents,end of $ 1,394 $ 1,280
period





CONDENSED INTERIM CONSOLIDATED BALANCE SHEETS

(In millions of United States dollars - Unaudited)





March 31 December
2012 31 2011

Assets

Current assets

Cash and cash equivalents $ 1,394 $ 1,502

Accounts receivable 691 473

Inventories and stockpiled ore 569 574

Notes receivable 35 40

Other 197 361

2,886 2,950

Mining interests

Owned by subsidiaries 22,930 22,673

Investments in associates 1,652 1,536

24,582 24,209

Goodwill 1,737 1,737

Investments in securities 221 207

Note receivable 42 42

Deposits on mining interests 106 73
expenditures

Other 177 156

Total assets $ 29,751 $ 29,374

Liabilities

Current liabilities

Accounts payable and accrued $ 651 $ 619
liabilities

Income taxes payable 140 48

Derivative liabilities 109 65

Other 25 39

925 771

Deferred income taxes 5,405 5,560

Long-term debt 748 737

Derivative liabilities 185 237

Provisions 382 375

Income taxes payable 113 113

Other 91 96

Total liabilities 7,849 7,889

Equity

Shareholders' equity

Common shares, stock options and 17,022 16,992
restricted share units

Investment revaluation reserve 60 43

Retained earnings 4,607 4,237

21,689 21,272

Non-controlling interests 213 213

Total equity 21,902 21,485

Total liabilities and equity $ 29,751 $ 29,374



 

Goldcorp Inc.

CONTACT: Jeff Wilhoit

Vice President, Investor Relations

(604) 696-3074

Fax: (604) 696-3001

Email: info@goldcorp.com

Website: www.goldcorp.com



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Goldcorp Inc.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.