• Dienstag, 24 Dezember 2024
  • 13:45 Uhr Frankfurt
  • 12:45 Uhr London
  • 07:45 Uhr New York
  • 07:45 Uhr Toronto
  • 04:45 Uhr Vancouver
  • 23:45 Uhr Sydney

Dalradian Resources Reports Assays From 14,673 Metre Curraghinalt Drill Program Including 13.8g/t Au Over 3.35m, 10.43g/t Au Over 3.75m and 22.83g/t Au Over 1.48m

02.05.2012  |  Marketwire

TORONTO, ONTARIO -- (Marketwire) -- 05/02/12 -- Dalradian Resources Inc. ("Dalradian" or the "Company") (TSX: DNA) has received final assays from outstanding drill holes from the 2011 and first quarter 2012 program at its Curraghinalt Deposit in County Tyrone, Northern Ireland. 54 drill holes are reported with 43 infill, and 11 step-out holes.


Drill results for the infill drilling are broadly consistent with the modelled and reported resource (PR November 30, 2012) while the step-out drilling continues to extend known mineralization along strike and down dip as well as delineating new mineralized veins.


The deposit remains open along strike, down dip and across strike.


These results mark the end of the current phase of surface infill drilling at the Curraghinalt deposit. For the next phase of the infill program, an application has been submitted to enable underground drilling from the existing workings, which we expect to commence end of Q3 this year.


Additional surface drilling will commence on July 1, 2012, following the completion and integration of on-going structural, geophysical, geochemical and geological studies to better understand and target high priority areas in the Curraghinalt trend.


Table 1: Selected drill results



----------------------------------------------------------------------------
Au
From To Grade Width
Hole ID (m) (m) g/t (m) Vein Target
----------------------------------------------------------------------------
11-CT-101a 346.4 346.8 11.68 0.44 Crow Step-out 390m from
the resource
----------------------------------------------------------------------------
11-CT-103(i) 775.6 775.8 155.14 0.2 New Vein Step-out
----------------------------------------------------------------------------
11-CT-108 118.1 120.3 10.24 2.16 M-Class Infill
----------------------------------------------------------------------------
11-CT-108 123.9 127.7 10.43 3.75 M-Class Infill
----------------------------------------------------------------------------
11-CT-109 81.8 83 15.32 1.2 No.1 Infill
----------------------------------------------------------------------------
11-CT-110 83.6 84.3 25.17 0.7 No.1 Infill
----------------------------------------------------------------------------
11-CT-110 95.3 95.4 90.88 0.15 New Vein Infill
----------------------------------------------------------------------------
11-CT-110 138.1 139.6 22.83 1.48 106-16 Infill
----------------------------------------------------------------------------
11-CT-111 75.1 76.5 13 1.41 Secondary Vein Infill
----------------------------------------------------------------------------
11-CT-111 143.2 143.7 25.48 0.54 M-Class Infill
----------------------------------------------------------------------------
11-CT-111 160.9 162.1 10.01 1.25 No.1 Infill
----------------------------------------------------------------------------
11-CT-111 191 192.3 18.32 1.3 106-16 Infill
----------------------------------------------------------------------------
11-CT-112 70.3 71.5 17.78 1.19 Road Infill
----------------------------------------------------------------------------
11-CT-118 110.2 111.6 12.69 1.36 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-121 87.9 89 14.7 1.15 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-138 172.2 172.9 18.17 0.71 T17 Infill
----------------------------------------------------------------------------
11-CT-139 108.3 108.6 87.36 0.25 Road Infill
----------------------------------------------------------------------------
11-CT-143 37.4 45.6 3.39 8.2 Road Infill
----------------------------------------------------------------------------
11-CT-143 146.9 148.8 10.01 1.86 Sheep Dip Infill
----------------------------------------------------------------------------
12-CT-150 200.9 201.7 58.83 0.8 Secondary Vein Infill
----------------------------------------------------------------------------
12-CT-150 220.1 221.3 10.73 1.2 Bend Infill
----------------------------------------------------------------------------
12-CT-150 305.5 308.8 13.18 3.35 Crow Infill
----------------------------------------------------------------------------
12-CT-151 131 132.1 21.06 1.11 106-16 Infill
----------------------------------------------------------------------------
12-CT-151 279.1 280 16.18 0.92 Crow Infill
----------------------------------------------------------------------------
12-CT-152 297.6 298.2 8.97 0.64 New Vein Step-out to south of
Crow Vein and 100m
south of previous
drilling
----------------------------------------------------------------------------


(i) Reported in 43-101 release, but not separately released


Note:



-- M-Class Veins - are veins in the resource that have not been defined
over a large area due to lack of drilling or limited strike extent and
are referenced in the Micon report as Minor Veins
-- Composites calculated at 0.5g/t Au cut-off and may include up to 2m of
internal dilution
-- True width is interpreted to range from 70 to 95% drilled width


Curraghinalt Step-Out Drilling


Step-out drilling, has expanded the potential resource envelope by 260m along strike on the T17, over 200m down dip on the 106-16 in some areas, 780m along strike and 200m up dip on portions of the Sheep Dip, and up to 240m down dip on the Bend. In addition, several new veins have been identified to the south of the known mineralization


Hole 11-CT-100


Tests the area between Attagh Burn and the central resource area. This hole is the second (steeper) of a scissor pair from the same collar as 11-CT-95. The hole intersected the No.1 vein as expected as well as extended the Bend by 240m down dip and 70m along strike and the T17 260m along strike from the latest resource.


Hole 11-CT-101a


This hole tests the up dip extension (480m) of mineralization identified in hole 11-CT-99, over 400m along strike to the east of the resource. Several mineralized zones were encountered. This hole confirms the up-dip continuity of mineralization on the eastern most line of drilling at Curraghinalt.


Hole 11-CT-103


Planned to test the down dip extensions of the mineralization on the eastern edge of the resource, this hole intercepted both the Crow, 3.11g/t Au over 1.9m, and Bend veins, 3.52g/t Au over 1.66m. Extending mineralization160m down dip from 11-CT-98. It also intersected five new veins to the south of the Crow including 155.14g/t Au over 0.2m and 4.27g/t Au over 2.8m. The latest resource includes the Crow intersection, but none of the other veins.


Hole 11-CT-104


Intended to target the down dip extensions of mineralization below the central portion of the resource, hole 11-CT-104 intersected both the Mullan, 43.63g/t Au over 0.16m, and T17 veins, 8.01g/t Au over 1.46m. The intercepts are 200m down dip of previous drilling and the most recent resource.


Hole 11-CT-105


This hole is a scissor below hole 11-CT-99 on the eastern most section at Curraghinalt. It is interpreted to have intersected the Sheep Dip vein approximately 780m east of the current resource with an intercept of 14.57g/t over 0.43m. A second vein intersected approximately 80m south of the interpreted position of the Crow vein and returned 9.14g/t Au over 0.87m.


Hole 11-CT-152


This hole is a 100m step-out to the south of previous drilling and targeted coincident geophysical and geochemical anomalies. Four veins were intercepted demonstrating the continuation of the system to the south. Results included 8.97g/t Au over 0.64m.


Infill Drilling


Infill drilling within the central portion of the deposit is expected to increase confidence in the resource without significantly altering the grade and tonnes.


Table 2: Results from holes 11-CT-100 to 11-CT-152



----------------------------------------------------------------------------
Au
From To Grade Width
Hole ID (m) (m) g/t (m) Vein Target
----------------------------------------------------------------------------
11-CT-100(i) 37.1 38.3 9.04 1.15 T17 Step-out 260m from
resource
----------------------------------------------------------------------------
11-CT-100(i) 150.6 150.7 53.12 0.16 No.1 Step-out
----------------------------------------------------------------------------
11-CT-100(i) 355.8 356.1 18.61 0.32 Bend 240m step-out down
dip + 70 m along
strike from the
resource
----------------------------------------------------------------------------
11-CT-101a 346.4 346.8 11.68 0.44 Crow Step-out 390m from
the resource
----------------------------------------------------------------------------
11-CT-102(i) 227.2 229.1 3.11 1.9 Crow Infill
----------------------------------------------------------------------------
11-CT-103(i) 473.4 475 3.52 1.66 Bend 82m step-out down
dip from the
resource
----------------------------------------------------------------------------
11-CT-103(i) 591.2 592.7 5.72 1.55 Crow Infill
----------------------------------------------------------------------------
11-CT-103(i) 751.5 751.7 36.04 0.21 New Vein Step-out
----------------------------------------------------------------------------
11-CT-103(i) 775.6 775.8 155.14 0.2 New Vein Step-out
----------------------------------------------------------------------------
11-CT-103(i) 833.4 833.6 33.94 0.17 New Vein Step-out
----------------------------------------------------------------------------
11-CT-103(i) 931.2 940.4 0.9 9.2 New Vein Step-out
----------------------------------------------------------------------------
11-CT-103(i) 969.9 970.4 22.38 0.48 New Vein Step-out
----------------------------------------------------------------------------
11-CT-103(i) 969.9 972.7 4.27 2.81 New Vein Step-out
----------------------------------------------------------------------------
11-CT-104 540.8 540.9 43.63 0.16 Sheep Dip Step-out 200m down
dip of resource
----------------------------------------------------------------------------
11-CT-104 624.4 625.9 8.01 1.46 106-16 Step-out 200m down
dip of resource
----------------------------------------------------------------------------
11-CT-104 629.4 629.5 71.68 0.11 106-16 Step-out 200m down
dip of resource
----------------------------------------------------------------------------
11-CT-105 386 386.4 14.57 0.43 Road Step-out 80m along
strike from resource
----------------------------------------------------------------------------
11-CT-105 898.8 899.7 9.14 0.87 New Vein Step-out 80 m south
of crow vein
----------------------------------------------------------------------------
11-CT-106 287.5 288.3 10.26 0.8 T17 Infill
----------------------------------------------------------------------------
11-CT-107 No results above 5 gm Infill -
intercepting
expected low grades
----------------------------------------------------------------------------
11-CT-108 67 67.1 59.52 0.11 New Vein Infill intercepted
new vein between the
V45 and V55 veins
----------------------------------------------------------------------------
11-CT-108 78.9 80.9 3.36 2.08 T17 Infill
----------------------------------------------------------------------------
11-CT-108 110.8 112.3 3.39 1.54 No.1 Infill
----------------------------------------------------------------------------
11-CT-108 118.1 120.3 10.24 2.16 M-Class Infill
----------------------------------------------------------------------------
11-CT-108 123.9 127.7 10.43 3.75 M-Class Infill
----------------------------------------------------------------------------
11-CT-108 156.5 157 15.36 0.5 106-16 Infill
----------------------------------------------------------------------------
11-CT-109 78.6 78.9 35.23 0.27 No.1 Infill
----------------------------------------------------------------------------
11-CT-109 81.8 83 15.32 1.2 No.1 Infill
----------------------------------------------------------------------------
11-CT-109 86.9 87.6 6.6 0.76 M-Class Infill
----------------------------------------------------------------------------
11-CT-109 120.5 121.9 7.93 1.37 106-16 Infill
----------------------------------------------------------------------------
11-CT-109 132.4 133.1 13.96 0.72 M-Class Infill
----------------------------------------------------------------------------
11-CT-110 72.2 73.9 8.82 1.74 M-Class Infill
----------------------------------------------------------------------------
11-CT-110 83.6 84.3 25.17 0.7 No.1 Infill
----------------------------------------------------------------------------
11-CT-110 95.3 95.4 90.88 0.15 New Vein Infill
----------------------------------------------------------------------------
11-CT-110 133.2 134.4 5.04 1.22 106-16 Infill
----------------------------------------------------------------------------
11-CT-110 138.1 139.6 22.83 1.48 106-16 Infill
----------------------------------------------------------------------------
11-CT-111 75.1 76.5 13 1.41 Secondary Vein Infill
----------------------------------------------------------------------------
11-CT-111 143.2 143.7 25.48 0.54 M-Class Infill
----------------------------------------------------------------------------
11-CT-111 160.9 162.1 10.01 1.25 No.1 Infill
----------------------------------------------------------------------------
11-CT-111 191 192.3 18.32 1.3 106-16 Infill
----------------------------------------------------------------------------
11-CT-112 70.3 71.5 17.78 1.19 Road Infill
----------------------------------------------------------------------------
11-CT-113 160.2 160.5 36.8 0.29 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-114 No intercepts greater than 5 Infill was expected
gm to intercept the
Mullan vein
----------------------------------------------------------------------------
11-CT-115 20.5 23.5 3.24 3 Road Step-out 200m up dip
of the resource
----------------------------------------------------------------------------
11-CT-115 130.3 132.6 2.4 2.3 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-116 132.1 132.9 6.3 0.8 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-117 51 54.4 3.34 3.42 Road Step-out 120m up dip
of the resource
----------------------------------------------------------------------------
11-CT-118 110.2 111.6 12.69 1.36 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-119 160.6 162.1 4.46 1.51 Road Infill
----------------------------------------------------------------------------
11-CT-120 103.9 105.1 5.12 1.26 T17 Infill
----------------------------------------------------------------------------
11-CT-120 143.1 148.7 2.1 5.63 M-Class Infill 20m along
strike of the
resource
----------------------------------------------------------------------------
11-CT-120 143.3 143.7 21.91 0.34 Included As above
----------------------------------------------------------------------------
11-CT-121 87.9 89 14.7 1.15 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-121 128 129.5 4.84 1.5 New Vein Infill identified a
new vein between the
Mullan and T17
veins.
----------------------------------------------------------------------------
11-CT-122 46.1 48.8 5.2 2.7 M-Class Infill
----------------------------------------------------------------------------
11-CT-122 61 61.6 15.47 0.6 No.1 Infill
----------------------------------------------------------------------------
11-CT-123 No intercepts greater than 5 Infill expected to
gm hit the Mullan
----------------------------------------------------------------------------
11-CT-124 No intercepts greater than 5 Infill expected to
gm hit the Mullan
----------------------------------------------------------------------------
11-CT-125 No intercepts greater than 5 Infill expected to
gm hit the Mullan
----------------------------------------------------------------------------
11-CT-126 73 75.1 3.3 2.1 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-127 31.6 31.7 140.8 0.18 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-127 128.1 129.8 5.53 1.74 T17 Infill
----------------------------------------------------------------------------
11-CT-127 164.6 168.2 2.03 3.58 No.1 Infill
----------------------------------------------------------------------------
11-CT-127 185.5 191.6 1.02 6.05 106-16 Infill 24m down dip
of resource
----------------------------------------------------------------------------
11-CT-128 151.9 154.9 1.91 2.98 T17 Infill 13m away from
resource
----------------------------------------------------------------------------
11-CT-129 47.1 47.8 8.86 0.73 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-130 127.7 127.9 44.8 0.12 New Vein New Vein in infill
drilling between the
Mullan and the T17
----------------------------------------------------------------------------
11-CT-131 No intercepts greater than 5 Expected to
gm intercept the Mullan
and the T17 on
Infill
----------------------------------------------------------------------------
11-CT-132 92 93.4 3.68 1.37 New Vein New vein identified
during infill
drilling - expected
to also intercept
the Mullan vein.
----------------------------------------------------------------------------
11-CT-133 No intercepts greater than 5 Expected several
gm veins on Infill
----------------------------------------------------------------------------
11-CT-134 156.6 157.2 12.57 0.6 106-16 Infill
----------------------------------------------------------------------------
11-CT-135 No intercepts greater than 5 Expected the Mullan
gm vein during Infill
drilling
----------------------------------------------------------------------------
11-CT-136 68.4 69.8 8.96 1.46 Road Step-out drilling
intersected this
vein 130m up dip of
the resource.
----------------------------------------------------------------------------
11-CT-136 134.3 135 11.32 0.74 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-137 86 86.2 48.7 0.22 Road Infill
----------------------------------------------------------------------------
11-CT-137 165.8 166.4 9.08 0.63 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-138 37.8 38.7 11.81 0.88 New Vein Infill
----------------------------------------------------------------------------
11-CT-138 59.8 61.7 2.97 1.95 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-138 172.2 172.9 18.17 0.71 T17 Infill
----------------------------------------------------------------------------
11-CT-139 108.3 108.6 87.36 0.25 Road Infill
----------------------------------------------------------------------------
11-CT-140 10.5 12.7 6.5 2.21 Road Infill
----------------------------------------------------------------------------
11-CT-141 No intercepts greater than 5 Infill no intercept
gm expected
----------------------------------------------------------------------------
11-CT-142 122.4 124.4 4.78 2 Secondary Vein Infill
----------------------------------------------------------------------------
11-CT-142 148.6 150.1 5.52 1.5 T17 Infill
----------------------------------------------------------------------------
11-CT-142 168.5 169.9 7.67 1.33 No.1 Infill
----------------------------------------------------------------------------
11-CT-142 191.3 193.8 5.12 2.52 106-16 Infill
----------------------------------------------------------------------------
11-CT-142 199.9 200.7 12.05 0.73 106-16 Infill
----------------------------------------------------------------------------
11-CT-143 37.4 45.6 3.39 8.2 Road Infill
----------------------------------------------------------------------------
11-CT-143 146.9 148.8 10.01 1.86 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-144 47.6 48.5 5.07 0.9 Sheep Dip Infill
----------------------------------------------------------------------------
11-CT-145 99.4 100 15.27 0.6 Secondary Vein Infill
----------------------------------------------------------------------------
11-CT-145 146.3 146.8 20.11 0.49 T17 Infill
----------------------------------------------------------------------------
11-CT-145 180.7 185.2 3.86 4.44 M-Class Infill
----------------------------------------------------------------------------
11-CT-145 208.1 208.8 13 0.73 106-16 Infill
----------------------------------------------------------------------------
11-CT-146 No intercepts greater than 5 A low-grade
gm intercept of the
Mullan vein was
expected.
----------------------------------------------------------------------------
11-CT-147 114.2 114.9 10.03 0.68 New Vein Infill
----------------------------------------------------------------------------
11-CT-147 123.6 124.7 9.31 1.19 No.1 Infill
----------------------------------------------------------------------------
11-CT-147 162.3 163.1 7.8 0.83 Secondary Vein Infill
----------------------------------------------------------------------------
11-CT-148 167.4 168 15.55 0.6 Secondary Vein Infill drilling
intersected this
vein 55m down dip of
the resource.
----------------------------------------------------------------------------
11-CT-148 170.9 171.3 30.79 0.38 T17 Infill
----------------------------------------------------------------------------
11-CT-148 199.5 201.8 2.71 2.26 T17 Infill
----------------------------------------------------------------------------
11-CT-149 138.4 142.9 2.98 4.5 No.1 Infill
----------------------------------------------------------------------------
11-CT-149 145.2 154.8 2.56 9.63 T17 Infill
----------------------------------------------------------------------------
11-CT-149 164.7 171.2 2.36 6.5 Secondary Vein Infill
----------------------------------------------------------------------------
12-CT-150 67.3 67.6 47 0.31 No. 1 Infill
----------------------------------------------------------------------------
12-CT-150 200.9 201.7 58.83 0.8 Secondary Vein Infill
----------------------------------------------------------------------------
12-CT-150 220.1 221.3 10.73 1.2 Bend Infill
----------------------------------------------------------------------------
12-CT-150 252.6 256.9 2.18 4.29 New Vein Infill
----------------------------------------------------------------------------
12-CT-150 305.5 308.8 13.18 3.35 Crow Infill
----------------------------------------------------------------------------
12-CT-151 5 5.5 20.8 0.5 T17 Infill
----------------------------------------------------------------------------
12-CT-151 77.2 78.1 5.73 0.92 No. 1 Infill
----------------------------------------------------------------------------
12-CT-151 113.4 114 13.74 0.6 M-class vein Infill
----------------------------------------------------------------------------
12-CT-151 131 132.1 21.06 1.11 106-16 Infill
----------------------------------------------------------------------------
12-CT-151 156.8 157.3 15.29 0.45 M-class vein Infill
----------------------------------------------------------------------------
12-CT-151 187.4 188 18.39 0.51 Secondary Vein Infill
----------------------------------------------------------------------------
12-CT-151 279.1 280 16.18 0.92 Crow Infill
----------------------------------------------------------------------------
12-CT-152 297.6 298.2 8.97 0.64 New Vein Step-out to south of
Crow Vein and 100m
south of previous
drilling
----------------------------------------------------------------------------


Qualified Person


Damien Stephens, BSc.(hons), M.AIG, M.AusIMM, Exploration Manager, Dalradian Resources Inc., is the Qualified Person who supervised the preparation of the technical data in this news release.


Drill core was halved with samples averaging ranging between 0.1 and 0.25 metres in ore and up to 0.5 metres in wall rock were submitted to Omac in the Republic of Ireland. Rigorous quality assurance and quality control procedures have been implemented including the use of blanks, standards and duplicates. Core samples were analyzed by a 30 gram gold fire assay with an atomic absorption, conventional gravimetric and/or screen fire techniques.


About Dalradian Resources Inc.:


Dalradian Resources Inc. is a TSX-listed, Canadian based exploration company engaged in the acquisition, exploration and development of gold, base metals and other precious metals projects. With a European focus, our most advanced property is in Northern Ireland and focuses on and around the high-grade mesothermal gold deposit, Curraghinalt.


The Company's wholly owned subsidiary, Dalradian Gold Limited, holds a 100% interest, subject to certain royalties, in mineral prospecting licences and mining lease option agreements in counties Tyrone and Londonderry, Northern Ireland. The Department of Enterprise, Trade and Investment ("DETI") and the Crown Estate Commissioners ("CEC") have together granted to Dalradian base and precious metal mineral exploration rights to four contiguous areas collectively known as the Tyrone Project.


Dalradian's flagship deposit, Curraghinalt hosts an NI 43-101 compliant measured mineral resource of 0.02 MT grading 21.51g/t gold for 10,000 contained ounces, indicated mineral resource of 1.11 MT grading 12.84g/t gold for 460,000 contained ounces and inferred mineral resource of 5.45 MT grading 12.74g/t for 2,230,000 contained ounces. Dalradian's NI 43-101 report, "An updated Mineral Resource Estimate for the Curraghinalt Gold Deposit, Tyrone Project, County Tyrone and County Londonderry, Northern Ireland" is dated January 10, 2012 and effective November 30, 2011, prepared by Messrs. Hennessey and Mukhopadhyay of Micon International Limited, and is available on SEDAR at www.sedar.com.


Dalradian is preparing a preliminary economic assessment for the Curraghinalt deposit, while also carrying out an active exploration program on the surrounding 84,000 hectares of exploration licenses.


In Norway, Dalradian holds mineral rights for approximately 1.7 million hectares over four greenstone belts including an area hosting an historic silver mining district. Dalradian is actively engaged in data acquisition and analysis in advance of an early stage exploration program in Norway.


Dalradian's Common Shares are listed on the Toronto Stock Exchange under the symbol "DNA". For further information, please see www.dalradian.com.


FORWARD-LOOKING INFORMATION


This news release contains "forward-looking information" which may include, but is not limited to, statements with respect to the estimation of mineral resources. Often, but not always, forward-looking statements can be identified by the use of words and phrases such as "plans," "expects," "is expected," "budget," "scheduled," "estimates," "forecasts," "intends," "anticipates," or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may," "could," "would," "might" or "will" be taken, occur or be achieved.


Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and are based on various assumptions.


Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, general business, economic, competitive, political and social uncertainties; the actual results of current exploration activities; actual results of reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations of ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled "Risk Factors" in the Company's annual information form. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of this news release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.


To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/dna0502fig1.pdf.


To view Figure 2, please visit the following link: http://media3.marketwire.com/docs/dna0502fig2.pdf.


To view Figure 3, please visit the following link: http://media3.marketwire.com/docs/dna0502fig3.pdf.


To view Figure 4, please visit the following link: http://media3.marketwire.com/docs/dna0502fig4.pdf.


To view Figure 5, please visit the following link: http://media3.marketwire.com/docs/dna0502fig5.pdf.


To view Figure 6, please visit the following link: http://media3.marketwire.com/docs/dna0502fig6.pdf.


To view Figure 7, please visit the following link: http://media3.marketwire.com/docs/dna0502fig7.pdf.


To view Figure 8, please visit the following link: http://media3.marketwire.com/docs/dna0502fig8.pdf.


To view Figure 9, please visit the following link: http://media3.marketwire.com/docs/dna0502fig9.pdf.


To view Figure 10, please visit the following link: http://media3.marketwire.com/docs/dna0502fig10.pdf


To view Figure 11, please visit the following link: http://media3.marketwire.com/docs/dna0502fig11.pdf.


To view Figure 12, please visit the following link: http://media3.marketwire.com/docs/dna0502fig12.pdf.


To view Figure 13, please visit the following link: http://media3.marketwire.com/docs/dna0502fig13.pdf.


To view Figure 14, please visit the following link: http://media3.marketwire.com/docs/dna0502fig14.pdf


To view Figure 15, please visit the following link: http://media3.marketwire.com/docs/dna0502fig15.pdf.


To view Figure 16, please visit the following link: http://media3.marketwire.com/docs/dna0502fig16.pdf.


To view Figure 17, please visit the following link: http://media3.marketwire.com/docs/dna0502fig17.pdf.


To view Figure 18, please visit the following link: http://media3.marketwire.com/docs/dna0502fig18.pdf.


To view Figure 19, please visit the following link: http://media3.marketwire.com/docs/dna0502fig19.pdf.

Contacts:

Dalradian Resources Inc.

Shae-Lynn Mathers

Director, Investor Relations

+1.416.583.5622
investor@dalradian.com
www.dalradian.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Dalradian Resources Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.