Galaxy Graphite Corp. Commences Field Work at SUN Project, Quebec
This Phase 1 work program will consist of prospecting, mapping and sampling, and will be completed by early July, 2012. The work will be performed by Consul-Teck Exploration Inc of Val d'Or, QC.
This work will be followed by a Phase 2 program, with a planned 3000 meters of diamond drilling. Drilling will commence as soon as all of the necessary permits are received.
Chris M. Healey P.Geo, a Qualified Person as defined by National Instrument 43-101, has reviewed and approved the technical content of this release.
ON BEHALF OF THE BOARD
Chris M. Healey
President and CEO
We seek safe harbor.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contact Information
Galaxy Graphite Corp.
(604) 921-1810
(604) 921-1898 (FAX)
www.galaxygraphite.com