Medusa Mining Limited: Co-O Mine Mineral Resource Update

06.08.2012  |  Marketwire

TORONTO, ONTARIO -- (Marketwire) -- 08/06/12 -- Medusa Mining Limited (ASX: MML)(LSE: MML) ("Medusa" or the "Company"), through its Philippines operating company, Philsaga Mining Corporation ("Philsaga"), advises that it has completed the annual resource estimate for the Co-O Mine.


In line with the mine expansion, the FY 2012 drilling has focused on infill drilling to increase confidence levels in key mining areas as well as stepout drilling along strike and at depth to demonstrate the excellent upside of the deposit. Whilst, the strike length has been increased by 400 metres to 2,000 metres, and is still open in all directions continuing to demonstrate excellent potential to add more resources in future years, many drill intersections undertaken in the FY 2012 drilling campaign are not incorporated into the resource model as the spacing of the drilling is still too wide along strike and down dip.


A 3 g/t gold lower cut-off has been applied to the resource (previously a 0 g/t gold cut-off), resulting in total resources of 6,215,000 tonnes containing 2,019,000 ounces at a grade of 10.1 g/t gold (compared to 1,960,000 ounces at 9.6 g/t gold in FY2011 and after taking into account gold produced of 60,595 ounces since 30 June 2011). The Indicated Resource has increased by 16% to 715,000 ounces at 11.8 g/t gold (from 616,000 ounces at 12.0 g/t gold).



Table I. Co-O Mine mineral resource estimate at 30 June 2012

----------------------------------------------------------------------------
greater than 3 g/t gold
------------------------------------------------------------
Category tonnes g/t gold ounces
----------------------------------------------------------------------------
Indicated
resources 1,890,000 11.8 715,000
----------------------------------------------------------------------------
Inferred
resources 4,325,000 9.4 1,304,000
----------------------------------------------------------------------------
TOTAL RESOURCES 6,215,000 10.1 2,019,000
----------------------------------------------------------------------------


Peter Hepburn-Brown, Managing Director of Medusa, commented:


"This increase in Indicated Resources is pleasing as confidence levels have been significantly improved in key areas of the mine. The step-out drilling strongly supports future resource additions as the mineralised system remains open in all directions including at depth where the deepest ore grade intersection achieved to date is at 1,073 metres below surface. The current wide spacing of many step-out surface drill holes prevents incorporation of their corresponding intersections into the resource model.


Drilling is planned to continue with 6 surface and 3 underground rigs during FY 2013 with the aim of raising the resource level to approximately 2,500,000 ounces following which the on-going drilling programmes will be tailored to replace at a minimum, mined ounces each year to maintain the resource base."


MINERAL RESOURCE MODEL


Discussion


Drilling has continued since the 27 July 2011 resource model update and this new resource model is based on data available as at 30 June 2012.


In line with the mine expansion, surface and underground diamond drilling has focused on infilling in key mining areas to increase confidence levels for detailed mine planning and expanded production. It has also demonstrated considerable upside to the Co-O vein system at the eastern end of the mine, at depth and recently to the west of the Tinago Fault.


The step-out drilling along strike has increased the strike length of mineralisation by 400 metres from 1,600 metres to 2,000 metres which is still open east and west and at depth. It should be emphasised that a significant number of step-out drill hole intersections reported since 7 July 2011 cannot be incorporated into the resource estimate as the spacing of drilling is still too wide along strike and down dip.


The number of veins in the Co-O Vein system is expanding and, due to the increasing diversity of vein types and grade variability between veins, a 3 g/t lower gold cut-off has been introduced (compared to FY 2011 where a 0 g/t gold cut-off was used). This has increased the global resource grade to 10.1 g/t gold from 9.6 g/t gold. The ounces below the 3 g/t gold cut-off total 60,000 ounces. In addition, level and stope development on some veins during the year showed less continuity of grades than predicted which required some changes to previously estimated grades, and faulting has affected some veins until the offsets are re-located.


Table II is a summary of the resources for the major veins. A total of 66 veins have been modelled.



Table II. Co-O Mine mineral resource estimates for the major veins at 30
June 2012 with greater than or equal to 50,000 ounces

----------------------------------------------------------------------------
greater than 3 g/t gold
---------------------------------------------
contained
Vein name Category tonnes g/t gold ounces
----------------------------------------------------------------------------
Central Vein Indicated 324,000 10.3 106,800
----------------------------------------------------------------------------
Inferred 150,000 3.9 19,000
----------------------------------------------------------------------------
Jeremy Vein Indicated 122,000 12.4 48,700
----------------------------------------------------------------------------
Inferred 10,000 4.3 1,400
----------------------------------------------------------------------------
Great Hamish Indicated 251,000 17.5 140,900
----------------------------------------------------------------------------
Inferred 258,000 14.6 120,800
----------------------------------------------------------------------------
Great Hamish
East FW Indicated 39,000 12.3 15,400
----------------------------------------------------------------------------
Inferred 241,000 8.6 66,600
----------------------------------------------------------------------------
Great Hamish FW2 Indicated 293,000 13.7 128,800
----------------------------------------------------------------------------
Inferred 432,000 10.5 145,100
----------------------------------------------------------------------------
Catto 1 Indicated 59,000 12.6 23,800
----------------------------------------------------------------------------
Inferred 75,000 24.5 59,400
----------------------------------------------------------------------------
Roysan Indicated 66,000 21.6 46,100
----------------------------------------------------------------------------
Inferred 88,000 14.1 39,900
----------------------------------------------------------------------------
East Agsao 1 Inferred 206,000 11.2 73,900
----------------------------------------------------------------------------
East Agsao 2 Indicated 51,000 9.3 15,300
----------------------------------------------------------------------------
Inferred 197,000 9.2 58,200
----------------------------------------------------------------------------
East Agsao 7 Indicated 97,000 8.3 25,900
----------------------------------------------------------------------------
Inferred 274,000 8.7 76,900
----------------------------------------------------------------------------
East Agsao 14 Indicated 20,000 6.3 4,000
----------------------------------------------------------------------------
Inferred 411,000 7.4 97,800
----------------------------------------------------------------------------
East Agsao 15 Indicated 28,000 6.9 6,100
----------------------------------------------------------------------------
Inferred 596,000 8.5 162,400
----------------------------------------------------------------------------
East Agsao 3 Inferred 133,000 15.4 65,800
----------------------------------------------------------------------------
Other veins Indicated 541,000 8.8 153,000
Inferred 1,253,000 7.9 316,500
----------------------------------------------------------------------------
Total Indicated Resources
(rounded) 1,890,000 11.8 715,000
----------------------------------------------------------------------------
Total Inferred Resources
(rounded) 4,325,000 9.4 1,304,000
----------------------------------------------------------------------------
TOTAL RESOURCES (rounded) 6,215,000 10.1 2,019,000
----------------------------------------------------------------------------

Notes:
------

- A lower cut-off of 3 g/t gold has been applied
Variable upper cuts up to 300 g/t gold have been applied to different
- veins
Rounding to the nearest 1,000 may result in some slight discrepancies
- in totals.


The increase in confidence levels in key mining areas has boosted the Indicated Resource by 16% to 715,000 ounces from 616,000 ounces. The Indicated Resource will now be used to estimate the new Probable Reserve.


It should be noted that 1,252,000 ounces or 62% of the resources are located above level 8, the bottom level to be accessed by the Saga Shaft.


Figure 1 shows the updated 3D resource model. The veins are open at depth, to the east and to the west. The resource model now stretches over a strike length of approximately two kilometres demonstrating excellent potential to add more resources in future years.


Figure 2 is the Level 6 map of the Co-O Mine area showing the veins in the 3D resource model at Level 6.


Vein modelling


Cube Consulting Pty Ltd of Perth, Western Australia was contracted to undertake the resource estimations. A wireframe model of the vein system and the mine depletions were based on all available information as at 30 June 2012. A Specific Gravity value of 2.62 was used in the estimations. A 2D longitudinal modelling approach was used and is based on an accumulation variable incorporating mineralised vein horizontal width and intercept grade. Variography was used to analyse the spatial continuity of the horizontal width and accumulation variables within the mineralised veins and to determine appropriate estimation inputs to the interpolation process. The accumulation variables were interpolated into blocks using Ordinary Kriging. High grade limits were applied to gold prior to the calculation of the accumulation variable. Mineral resources have been reported in accordance with The 2004 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code).


Information in this report relating to Exploration Results has been reviewed and is based on information compiled by Mr Geoff Davis, who is a member of The Australian Institute of Geoscientists. Mr Davis is the Chairman of Medusa Mining Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a "Competent Person" as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and is a "Qualified Person". Mr Davis consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.


Information in this report relating to Mineral Resources has been estimated and compiled by Mr Mark Zammit of Cube Consulting Pty Ltd of Perth, Western Australia. Mr Zammit is a member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Zammit consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.


To view Figure 1. 3D model of the Co-O vein system and underground workings, please visit the following link:

http://media3.marketwire.com/docs/810330A.jpg


To view Figure 2. Co-O Mine Level 6 plan showing the veins and workings, please visit the following link:

http://media3.marketwire.com/docs/810330B.jpg


ABN: 60 099 377 849

Contacts:

Australia

Medusa Mining Limited

Peter Hepburn-Brown

Managing Director

+61 8 9367 0601
www.medusamining.com.au


United Kingdom

Fairfax I.S. PLC

Financial Adviser and Broker

Ewan Leggat/Laura Littley

+44 (0)20 7598 5368


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Ten Sixty Four Ltd.
Bergbau
A3DMQC
AU0000221418

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.