• Mittwoch, 03 Juli 2024
  • 18:23 Uhr Frankfurt
  • 17:23 Uhr London
  • 12:23 Uhr New York
  • 12:23 Uhr Toronto
  • 09:23 Uhr Vancouver
  • 02:23 Uhr Sydney

First Nickel Intersects 1.04% Ni and 0.70% Cu Over 8.6 Metres on Link Zone

08.08.2012  |  Marketwire

TORONTO, ONTARIO -- (Marketwire) -- 08/08/12 -- First Nickel Inc. ("First Nickel", "FNI" or the "Company") (TSX: FNI) reports the results of the 2012 surface exploration diamond drill program consisting of 3 holes representing 2,700 metres of drilling on the Link Zone in Sudbury, Ontario. The assay results within this press release include both new diamond drill holes and previously reported drill holes completed in 2009 on the same area. Assay results have been received for all drilling completed on the Link Zone in 2012.


The surface drill program on the Link Zone was completed on FNI's wholly owned patented mining claims in Graham Township testing an area located between the Lockerby East Zone and the Conwest Deposit. Eight FNI drill holes have been completed on the Link Zone since 2009 intersecting mainly norite hosted disseminated sulphide mineralization with similar characteristics to the Conwest Deposit. Borehole geophysics was completed on selected drill holes in 2009.


The following table summarizes the significant assay results received for the Link Zone area from the 2012 and 2009 diamond drill programs.



Hole ID From (m) To (m) Interval (m) Nickel (%) Copper (%) Year
FNI4001 846.00 870.00 24.00 0.64 0.42 2009
FNI4002 840.60 852.70 12.10 0.89 0.58 2009
incl. 850.10 852.70 2.60 1.82 0.96 2009
FNI4003 816.00 826.40 10.40 1.33 0.64 2009
FNI4004 482.50 483.50 1.00 1.06 0.03 2009
FNI4005 853.50 862.50 9.00 0.57 0.57 2009
and 885.80 906.00 20.20 0.62 0.39 2009
FNI4009 823.00 845.70 22.70 0.79 0.58 2012
incl. 837.10 845.70 8.60 1.04 0.70 2012
FNI4010 828.40 862.75 34.35 0.57 0.52 2012

All assay intervals reported are core length and do not represent true
widths (defined as being measured at right angles to the direction of
extension of the sulphide body). All other assay samples are pending
analysis.


Holes FNI4006 and FNI4007 tested previously unexplored portions of the Sudbury Igneous Complex basal contact to the east of the mineralized trend and did not intersect any significant, additional mineralization.


Paul Davis, First Nickel's Vice President, Exploration states "These drill results confirm that the mineralized system associated with the Lockerby East and Conwest deposits extends through the Link Zone and has expanded the overall area of the higher grade mineralization intercepted in the 2009 program. We are going to interpret these results and determine the next phase of exploration on the area to define the economic potential of the Link Zone."


To view the map "Link Zone Drilling 2012 - Longitudinal", please visit the following link: http://media3.marketwire.com/docs/first_nickel_fig01_aug8.pdf


The diamond drilling program was designed and carried out under the supervision of First Nickel's Sudbury Geology Manager, Philip Vicker, P.Geo. a "qualified person" as defined by National Instrument 43-101. The information in this release was prepared under the direction of Paul Davis, P.Geo., Vice President of Exploration for First Nickel Inc., a "qualified person" as defined by National Instrument 43-101. First Nickel Inc. follows a rigorous quality assurance/quality control ("QA/QC") protocol on all of its exploration projects. Drill core of interest is sawn in half, with one half retained for future reference and one half sent to a commercial laboratory, SGS Laboratories in Garson, Ontario. The company's QA/QC protocol includes the insertion of standards and blanks for each batch of samples.


About First Nickel Inc.


First Nickel is a Canadian mining and exploration company. The Company's mission is to be the most dynamic North American emerging base metal mining company in which to work and invest and to be respected in the communities in which we operate. FNI is in the process of ramping up production at its Lockerby nickel / copper mine in the Sudbury Basin in northern Ontario. Once the Lockerby Mine reaches full production (expected by end of 2012), it is expected to produce at a rate of approximately 10 million pounds of nickel and approximately 7 million pounds of copper annually, providing a strong base of cash flow from which to grow the Company. In addition to the Lockerby nickel mine, the Company owns exploration properties in the Sudbury Basin, the Timmins region of northern Ontario, and the Belmont region of Eastern Ontario. First Nickel's shares are traded on the TSX under the symbol FNI.

Contacts:

First Nickel Inc.

Thomas Boehlert

President & CEO

416 362-7050
tboehlert@firstnickel.com


CHF Investor Relations

Robin Cook

Senior Account Manager

416 868 1079 x 228
robin@chfir.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
First Nickel Inc.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.