Belvedere Resources Ltd.: Recent Drilling Confirms Potential of Osikonmäki West; Geophysics Expands Potential of Osikonmäki East
In addition to the drilling program, a geophysics program was carried out over the Eastern end of the shear zone to assist in better characterizing the high grade and bulk tonnage potential in that area. The results of this program have not yet been fully interpreted but initial indications are that the geophysical anomalies associated with the mineralized shear zone continue to extend further to the East. The next phase of drilling will target this area.
David Pym (CEO) and Mark Burridge (Chairman of the JV partner REBgold) comment, "The results from the drilling at the Western end of the shear zone confirm the potential for additional gold mineralization beyond that previously identified in the Eastern part of the shear zone. The geophysics program indicates that the geophysical anomalies extend well beyond the current Eastern limit of the previously identified shear zone and will be a target for follow-up drilling. The indication of eastern extension is of particular interest as it is on the far Eastern end that the best intercepts of the 2011 and 2012 Drill Programs were encountered."
Hole_id From To Interval Au g/t GT
BELOSI093 47.01 52.84 5.83 1.38 8.1
including 47.01 49.99 2.98 2.32 6.9
including 47.01 47.96 0.95 5.15 4.9
BELOSI094 30.04 37.15 7.11 0.99 7.1
including 30.04 32.16 2.12 1.66 3.5
Table 1: Intersections using a 0.5 g/t Au cut-off with a grade thickness (GT= grade x thickness) greater than 1 gram metres. No top cut is applied. Maximum grade is 5.15g/t Au over 0.95m, one of six individual samples over 1 g/t Au. Intersections are estimated to be 70-90% of true width. BELOSI 92 returned no significant intercepts, although did contain anomalous levels of gold.
HoleID Easting Northing Elevation Depth Azimuth Dip
BELOSI092 3562040 6883210 107.7 65.35 0 50
BELOSI093 3561900 6883180 109.6 91.20 0 65
BELOSI094 3561934 6883212 110.7 49.50 0 60
Table 2: Details of drillhole locations
The drilling was undertaken by Drillcon SMOY of Finland, providing 42 mm diameter core. Samples are comprised of half diamond core. Intersections are estimated to be 70-90% of true width. No top cuts are applied with the highest individual assay being 5.15 g/t gold over 0.95 metres. Core samples are sawn in half on site, prepped and assayed by 30g fire assay with an AAS finish at the internationally accredited laboratories of ALS Chemex in Finland. The quality assurance-quality control (QAQC) program consists of the insertion of certified standards of known gold content every 20 samples, with blanks at the beginning of each batch. In addition, ALS Chemex inserts a number of blanks and standards into the analytical process. Standards, blanks and duplicates make up approximately 15% of the samples assayed. The remaining half core is retained on site for verification and reference purposes.
About Belvedere:
Belvedere Resources Limited is a mining company incorporated in British Columbia with a primary focus on nickel, gold, cobalt and copper in Finland. The Company currently produces 2200t of nickel in concentrate/year from the Hitura nickel mine in Central Finland. The Company has a number of advanced gold projects in close proximity to the Hitura mine.
About the Joint Venture with REBgold (TSX.V:RBG)
REBgold Corporation has the right to earn up to a 50% interest in a special purpose joint venture company which holds the Kiimala and Rantasalmi projects by contributing expenditures of C$6 million over a 4 year period. If REBgold proceeds with and completes the feasibility study it will increase its stake in the projects to between 55% and 75% depending on the level of Belvedere's contribution to the study. A further 5% can be earned if REBgold's bioleaching technology can lead to a material improvement in the project economics. REBgold currently owns 14% of the project.
Forward Looking Statement:
Some of the statements contained herein may be forward-looking statements, which involve known and unknown risks and uncertainties. Without limitation, statements regarding future plans and objectives of the Company (including statements relating to future drilling and interpreted continuity of the new mineralised zones) are forward-looking statements that involve various degrees of risk. It is important to note that the Company's actual results could differ materially from those in such forward-looking statements.
Qualified Person
The technical aspects of this statement have been prepared by Dr Toby Strauss (CGeol), Chief Operating Officer of Belvedere Resources Ltd, who is acting as a Qualified Person in compliance with National Instrument 43-101 with respect to this release. Dr Strauss has verified the data supporting this press release. Verification included checking the data to the original Laboratory certificates, examining photographs of the core, reviewing sampling procedures and reviewing the geological interpretation.
BELVEDERE RESOURCES LTD.
David Pym, CEO; Suite #404, Vancouver World Trade Centre, 999 Canada Place, Vancouver. BC. V6C 3E2, Canada
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contact
Humbercrest Capital Inc.
Scott Findlay
647 274 2536
www.belvedere-resources.com