• Mittwoch, 24 Juli 2024
  • 01:22 Uhr Frankfurt
  • 00:22 Uhr London
  • 19:22 Uhr New York
  • 19:22 Uhr Toronto
  • 16:22 Uhr Vancouver
  • 09:22 Uhr Sydney

NioGold Mining Corporation Announces New Zone Discovered Hole Returned 19.21 G/T AU Over 5.6 Metres

15.08.2012  |  The Newswire
Val-d’Or, Quebec - August 15, 2012 - NioGold Mining Corporation (TSX-V:NOX) (OTCQX:NOXGF) (“NioGold”) reports that Phase Two exploration on its Marban Block property in Quebec has identified a new high grade gold zone and extended the Marban deposit on strike and at depth. The results from 31 drill holes conclude a very successful program conducted under the $20 million earn-in option to be spent by Aurizon Mines (“Aurizon”) on the property. Approximately $9 million remains on the commitment. The Marban Block is located in the Malartic gold camp, Abitibi region of Quebec.

The new gold zone was discovered at about 500 metres north of the Marban deposit and at 350 metres south of the Norlartic deposit. Two holes intersected a mineralized dioritic dike.


The results of the new zone are:

- 19.40 g/t Au over 1.2 m on section 3600 at a vertical depth of 92 m (MB-12-323)

- 19.21 g/t Au over 5.6 m on section 3600 at a vertical depth of 215 m (MB-12-324)

This discovery occurred in the 13 exploration holes which were drilled outside the Marban deposit limits. One hole investigating the stratigraphy of the Marban deposit at great depth revealed the continuity of the Marban system down to a depth of 780 vertical metres with hole MB-12-322 (1.77 g/t Au over 6.5 m) which is about 450 metres from the deepest information on that section of the deposit. North of the Marban deposit, a group of 5 holes intersected the Norlartic system thus confirming its eastern extension.

Results from the 18 others holes that were drilled on the Marban deposit are distributed on a strike of 1,025 meters and include the Eastern Down Dip Zone (“EDDZ”) and Western High Grade Zone (“WHGZ”).


Drilling highlights from the EDDZ include:

- 3.74g/t Au over 6.4 m on section 4700 at a vertical depth of 245 m (MB-12-317)

- 4.51 g/t Au over 6.0 m on section 4600 at a vertical depth of 375 m(MB-12-319)

In-fill drill holes on the WHGZ include the following highlights:

- 19.35 g/t Au over 1.2 m on section 3725 at a vertical depth of 100 m (MB-12-309)

- 20.70 g/t Au over 0.7 m and 14.65 g/t Au over 1.2 m on section 3675 at a vertical depth of 50 m and 60 m respectively (MB-12-312)

- 1.31 g/t Au over 19.7 m on section 3700 at a vertical depth of 35 m (MB-12-314)

- 21.40 g/t Au over 0.9 m on section 3850 at a vertical depth of 30 m (MB-12-327)

“These are extremely encouraging results,” said Mike Iverson, NioGold’s Chairman and CEO. “We made a new discovery between the Marban and Norlartic deposits. We extended the Eastern Down Dip Zone with wide, high-grade intervals, while in-fill drilling in the Western High Grade Zone continued to deliver high grade values over small widths and lower grade intervals over larger widths. We look forward to the Phase Three program, which NioGold and Aurizon expect to begin in late August or early September.”


Exploration holes results

-----------------------------------------------------------------------------------
|Hole |Easting|Northing|Azimuth|Dip |Hole |From |To |Length|Grade|Zones |
| | | | | |Length| | | | | |
| | | | | | | | | | | |
| | | (m) | | | | | |(m) | | |
| | (m) | | | | (m) | | | | | |
| | | | | | | | | | | |
| | | | | | | |(m) | | (g/t| |
| | | | | | | | | |Au) | |
| | | | | | |(m) | | | | |
| |
|---------------------------------------------------------------------------------|
|Collar coordinates in the Marban grid |
|---------------------------------------------------------------------------------|
|MB-12-320|3600 |4621 |N180° |-56°|813.6 |19.3 |38.6 |19.3 |1.03 | |
|---------------------------------------------------------------------------------|
| | | | | |incl |19.3 |27.6 |8.3 |1.60 | |
|---------------------------------------------------------------------------------|
|MB-12-321|4000 |4635 |N178° |-62°|1206.0|144.4|150.3|5.9 |2.04 | |
|---------------------------------------------------------------------------------|
| | | | | | |661.2|661.9|0.7 |2.99 | |
|---------------------------------------------------------------------------------|
| | | | | | |747.0|748.2|1.2 |4.44 | |
|---------------------------------------------------------------------------------|
|MB-12-322|4000 |4750 |N178° |-67°|1061.0|862.0|868.5|6.5 |1.77 | |
|---------------------------------------------------------------------------------|
|MB-12-323|3600 |4867 |N178° |-54°|909.0 |172.2|173.4|1.2 |19.40|New dike |
|---------------------------------------------------------------------------------|
|MB-12-324|3600 |4867 |N178° |-75°|1035.0|215.6|221.2|5.6 |19.21|New dike |
|---------------------------------------------------------------------------------|
|Collar coordinates in the Norlartic grid |
|---------------------------------------------------------------------------------|
|MB-12-330|9+00 E |1+20 S |N210° |-50°|254.0 |212.0|217.1|5.1 |1.23 | |
|---------------------------------------------------------------------------------|
|MB-12-331|11+00 |0+00 |N210° |-50°|348.0 |169.8|173.4|3.6 |1.81 |Norlartic|
| |E | | | | | | | | | |
|---------------------------------------------------------------------------------|
| | | | | | |307.0|309.4|2.4 |1.98 | |
|---------------------------------------------------------------------------------|
|MB-12-332|11+00 |1+50 S |N210° |-50°|240.0 |59.3 |61.9 |2.6 |2.24 |Norlartic|
| |E | | | | | | | | | |
|---------------------------------------------------------------------------------|
|MB-12-333|6+00 E |0+81 S |N210° |-45°|200.0 |70.8 |72.0 |1.2 |0.81 |Norlartic|
|---------------------------------------------------------------------------------|
|MB-12-337|12+00 |1+00 S |N210° |-50°|201.0 |118.7|125.8|7.1 |0.68 |Norlartic|
| |E | | | | | | | | | |
|---------------------------------------------------------------------------------|
|Collar coordinates in the UTM Nad 83 Zone 18 grid |
|---------------------------------------------------------------------------------|
|MB-12-334|277538 |5335240 |N210° |-48 |300.0 |284.3|285.4|1.1 |0.67 | |
|---------------------------------------------------------------------------------|
|MB-12-335|277428 |5335060 |N210° |-49 |299.0 |Nothing above 66 ppb |
|---------------------------------------------------------------------------------|
|MB-12-336|277315 |5334880 |N210° |-50 |201.0 |Nothing above 86 ppb |
-----------------------------------------------------------------------------------


Marban deposit results

-------------------------------------------------------------------------------
|Hole |Easting|Northing|Azimuth|Dip |Hole |From |To |Length|Grade|Zones|
| | | | | |Length| | | | | |
| | | | | | | | | | | |
| | | (m) | | | | | |(m) | | |
| | (m) | | | | (m) | | | | | |
| | | | | | | | | | | |
| | | | | | | |(m) | | (g/t| |
| | | | | | | | | |Au) | |
| | | | | | |(m) | | | | |
| |
|-----------------------------------------------------------------------------|
|MB-12-307|3800 |3975 |N180° |-47°|228.0 |143.7|146.0|2.3 |3.08 |D3 |
|-----------------------------------------------------------------------------|
|MB-12-308|3800 |3915 |N180° |-46°|186.0 |118.0|123.0|5.0 |1.43 |D3 |
|-----------------------------------------------------------------------------|
|MB-12-309|3725 |4050 |N180° |-47°|281.0 |128.8|130.0|1.2 |5.89 | |
|-----------------------------------------------------------------------------|
| | | | | | |134.2|135.4|1.2 |19.35| |
|-----------------------------------------------------------------------------|
|MB-12-310|3750 |4028 |N180° |-46°|251.0 |131.4|132.6|1.2 |8.06 |2 |
|-----------------------------------------------------------------------------|
| | | | | | |190.6|193.0|2.4 |4.24 |D3 |
|-----------------------------------------------------------------------------|
|MB-12-311|3750 |3905 |N180° |-46°|167.0 |119.3|121.5|2.2 |0.87 | |
|-----------------------------------------------------------------------------|
|MB-12-312|3675 |3950 |N180° |-47°|209.0 |61.9 |62.6 |0.7 |20.70|2 |
|-----------------------------------------------------------------------------|
| | | | | | |75.2 |76.4 |1.2 |14.65| |
|-----------------------------------------------------------------------------|
|MB-12-313|3700 |3925 |N180° |-45°|182.0 |93.6 |106.8|13.2 |1.07 |E |
|-----------------------------------------------------------------------------|
|MB-12-314|3700 |3860 |N180° |-45°|120.0 |35.8 |55.5 |19.7 |1.31 |E |
|-----------------------------------------------------------------------------|
|MB-12-315|3725 |3910 |N180° |-47°|170.0 |88.6 |93.3 |4.7 |1.19 |E |
|-----------------------------------------------------------------------------|
|MB-12-316|3900 |3955 |N180° |-46°|234.0 |145.4|149.0|3.6 |1.37 | |
|-----------------------------------------------------------------------------|
|MB-12-317|4700 |3983 |N180° |-55°|522.0 |297.6|304.0|6.4 |3.74 | |
|-----------------------------------------------------------------------------|
| | | | | | |455.8|457.0|1.2 |4.11 | |
|-----------------------------------------------------------------------------|
|MB-12-318|3850 |3870 |N180° |-45°|164.0 |70.2 |73.1 |2.9 |5.57 | |
|-----------------------------------------------------------------------------|
|MB-12-319|4600 |4000 |N180° |-57°|557.0 |349.0|353.8|4.8 |2.08 |V |
|-----------------------------------------------------------------------------|
| | | | | | |383.1|384.0|0.9 |9.22 |W |
|-----------------------------------------------------------------------------|
| | | | | | |446.8|465.4|18.6 |2.36 | |
|-----------------------------------------------------------------------------|
| | | | | |incl |446.8|452.8|6.0 |4.51 | |
|-----------------------------------------------------------------------------|
|MB-12-325|4050 |3820 |N180° |-46°|140.0 |40.2 |41.4 |1.2 |8.32 | |
|-----------------------------------------------------------------------------|
| | | | | | |87.4 |88.2 |0.8 |7.32 | |
|-----------------------------------------------------------------------------|
|MB-12-326|4450 |4127 |N180° |-78°|693.0 |193.5|196.3|2.8 |3.47 | |
|-----------------------------------------------------------------------------|
| | | | | | |226.6|227.2|0.6 |5.52 | |
|-----------------------------------------------------------------------------|
| | | | | | |532.7|533.8|1.1 |9.77 | |
|-----------------------------------------------------------------------------|
|MB-12-327|3850 |4005 |N180° |-45°|279.0 |42.7 |43.6 |0.9 |21.40| |
|-----------------------------------------------------------------------------|
| | | | | | |180.5|181.3|0.8 |7.75 | |
|-----------------------------------------------------------------------------|
| | | | | | |190.3|194.6|4.3 |2.13 | |
|-----------------------------------------------------------------------------|
|MB-12-328|4650 |3925 |N180° |-55°|480.0 |278.0|280.1|2.1 |4.07 |M |
|-----------------------------------------------------------------------------|
|MB-12-329|3900 |4035 |N180° |-47°|287.0 |58.0 |59.2 |1.2 |12.85| |
|-----------------------------------------------------------------------------|
| | | | | | |96.5 |97.3 |0.8 |10.55| |
-------------------------------------------------------------------------------


Marban Block drilling

The 2010-2012 drill programs (Phase 1 and 2) totalled 84,911 metres (260 holes and 17 extensions). The Marban deposit received the bulk of the drilling with 68,861 metres (208 holes), among which 19,575 metres (74 holes) were in-filling at a 25x25 metres spacing pattern. The other holes were completing a 50x50 metres spacing pattern or making steps of 100 metres. The Norlartic deposit received 4,319 metres (21 holes) of in-fill drilling and 11,731 metres (31 holes) were drilled for exploring the Marban Block property mainly between the Norlartic and Marban deposits, but also some other targets on the property.


Aurizon Option

Aurizon can earn up to a 65% interest the Marban Block property under the terms of an option and joint venture agreement dated July 5, 2010, between NioGold and Aurizon. The initial 50% interest can be earned by incurring expenditures of $20 million over three years, completing an updated NI 43-101 compliant mineral resource estimate, and by making a resource payment for 50% of the total gold ounces defined by the mineral resource estimate. NioGold remains the project operator during the initial earn-in period (see news release dated July 6, 2010).


Technical Info, QA/QC and Qualified Persons

Reported intervals are in core lengths but are anticipated to approximate true width, except where structural complexities occur, as the holes were drilled near perpendicular to the principal local structural orientation.

Diamond drill holes were drilled with NQ-size core in order to obtain larger sample volumes of the mineralised zones, except for holes that traversed underground workings which were completed using BQ-size core. The core was sealed delivered by the drilling contractor to NioGold’s facilities located at the Norlartic mine site. The core was photographed for reference, logged and mineralised sections were sawed in half. Sample lengths vary between 0.5 to 1.5 metres. Half core samples were bagged, sealed and delivered to ALS Chemex in Val-d’Or, Quebec, an accredited laboratory. The remaining core is stored on site for reference. Samples were assayed by the fire-assay method using an atomic absorption finish on a 50-gram pulp split. A quality assurance and quality control program (QA/QC) was implemented by NioGold and the laboratory to insure the precision and reproducibility of the analytical method and results. The QA/QC program includes the insertion of standards, blanks and field duplicates in the sample batches sent to the laboratory and a systematic re-assaying of samples returning values above 2 g/t Au by the fire-assay method using a gravimetric finish. As well, pulps grading above 0.5 g/t Au are sent to Bourlamaque Assay Laboratories Ltd. in Val-d’Or for check assaying.

The drilling program is conducted under the supervision of Yan Ducharme, M.Sc., P.Geo. (OGQ), the NioGold Vice president of exploration and a Qualified Person as defined by National Instrument 43-101. The news released was prepared by Mr. Ducharme.


NioGold Mining Corporation – « On Canada’s Golden Highway »

NioGold Mining Corporation is a mineral exploration company focused on gold. The Company’s flagship projects are located in the Cadillac - Malartic - Val-d’Or region of the prolific Abitibi gold mining district Quebec. The Cadillac, Malartic and Val-d’Or mining camps have produced over 45 million ounces of gold since the 1930’s and presently encompasses six producing gold mines including Osisko Mining’s new Canadian Malartic operations. NioGold’s land holdings within the Abitibi presently cover 130km2 and encompass four former gold producers, namely the Norlartic, Kierens (First Canadian), Marban and Malartic Hygrade mines that collectively produced 640,000 ounces of gold. NioGold has outlined Indicated resources of 598,000 ounces gold and Inferred resources of 361,000 ounces gold in and around these deposits.

NioGold’s experienced and qualified technical team are overseeing the advancement of these projects, with current drill programs underway targeting expansion of the resource base.

NioGold invites you to visit the company website at www.niogold.com.



For information on NioGold Mining Corporation contact:

NioGold Mining Corp.
Michael A. Iverson, Chairman & CEO
Tel: (604) 856-9887
miverson@niogold.comd

Dale Paruk, Vice-President
paruk@niogold.com
Tel: (604) 662-4505
Toll-free: (877) 642-6200



Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.


FORWARD-LOOKING STATEMENTS

This news release includes "forward looking statements", as that term is defined in Section 27A of the Unites States Securities Act of 1933, as amended, and Section 21E of the United States Exchange Act of 1934, as amended, that are subject to assumptions, risks and uncertainties. Statements in this news release which are not purely historical are forward looking statements, including without limitation any statements concerning the Company's intentions, plans, estimates, expectations or beliefs regarding the future. Although the Company believes that any forward looking statements in this news release are reasonable, there can be no assurance that any such forward looking statements will prove to be accurate. The Company cautions readers that all forward looking statements, including without limitation those relating to the Company's future operations and business prospects, are based on assumptions none of which can be assured, and are subject to certain risks and uncertainties that could cause actual events or results to differ materially from those indicated in the forward looking statements. Readers are advised to rely on their own evaluation of such risks and uncertainties and should not place undue reliance on forward looking statements.

Any forward looking statements are made as of the date of this news release, and the Company assumes no obligation to update the forward looking statements, or to update the reasons why actual events or results could or do differ from those projected in the forward looking statements. Except as required by law, the Company assumes no obligation to update any forward looking statements, whether as a result of new information, future events or otherwise.


CAUTIONARY NOTE TO U.S. INVESTORS

Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
NioGold Mining Corp.
Bergbau
-
-

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.