• Freitag, 22 November 2024
  • 12:33 Uhr Frankfurt
  • 11:33 Uhr London
  • 06:33 Uhr New York
  • 06:33 Uhr Toronto
  • 03:33 Uhr Vancouver
  • 22:33 Uhr Sydney

Freegold Intersects 50.3 metres grading 1.46 g/t Au at Golden Summit Project, Alaska

16.10.2012  |  CNW

VANCOUVER, Oct. 16, 2012 /CNW/ - Freegold Ventures Limited (TSX: FVL) (Frankfurt: FR4N) ("Freegold") is pleased to report the results from its drill program on the Golden Summit Project located near Fairbanks, Alaska. Drilling at Golden Summit was conducted with two rigs from mid January through mid-April with one rig operating from mid May until the end of September at which point drilling ceased in order to complete the upcoming resource calculation.  Drilling has been primarily focused in the Dolphin and Cleary Hill Areas.

Results from the drill program continue to demonstrate the significant expansion potential of the Dolphin/Cleary Hill resource areas. 9,714 metres have been drilled in the Dolphin Zone since January of which assays for 9,373 metres have now been reported.   5,203 meters have been drilled in the Cleary Zone since January of which all assays have now been reported.

Hole Number
Hole InclinationDepth of Hole
(ft)
From
(ft)
To
(ft)
Interval
(ft)
Interval
(m)
Au
g/t
Uncut
Au
g/t
Cleary Hill Area        
GSCL1216 82216239223070.10.41 
   467536.569.521.20.41 
   579.5781201.561.40.67 
GSCL1217Abandoned       
         
GSCL1218 996851254012.20.44 
   166638472143.90.44 
   7418228124.70.42 
         
GSCL1219 813.5221260.539.512.00.48 
   433526.593.528.50.35 
         
GSCL1220 845.52734.57.52.35.4 
   140187.547.514.50.35 
   421789368112.20.38 
         
         
GSCL1221  63780216550.31.46 
  including637730.593.528.50.43 
  including730.5735.551.5 191
  including769.580232.59.91.34 

Width refers to drill hole intercepts, true widths can not be determined due to uncertain geometry of mineralization.

Within GSCL1221 the 1.5 meter interval from 730.5 to 735.5 feet returned 191 g/t Au. This sample value was cut to 30 g/t Au for the purposes of calculating the interval from 637 to 802 feet reported in the table above. All other assays reported are uncut. The bottom 9.9 metres of GSCL1221 intersected 1.34 g/t Au. This higher grade intercept appears to be the downdip extension of the vein system mined in the historic Cleary Hill Mine, from which 281,000 ounces grading 1.3 oz/t (44.5 g/t ) Au were extracted prior to its closure in 1942. Further drilling will be necessary to expand on these higher grade intercepts.

The current NI 43-101 resource at Dolphin was updated in December 2011 which using a 0.35 g/t cutoff, is 14,840,000 tonnes @ 0.66 g/t Au  - represents 316,000 ounces in the indicated category and 50,460,000 tonnes @ 0.61 g/t Au  - and represents 991,000 ounces in the inferred category.  The current NI 43-101 compliant resource at Dolphin was based on 11,802 metres. The updated NI 43-101 resource will incorporate approximately 38,357 metres and is expected to be completed in the near term.

The Qualified Person who has reviewed the technical disclosure contained in this release is Curtis J. Freeman, M.Sc., PGeo who is the primary geological consultant for the project.

Drill cores were cut in half using a diamond saw, with one-half placed in sealed bags for geochemical analysis. Core samples were picked up on-site by Acme Analytical Lab and transported to their facility in Fairbanks, Alaska. A sample quality control/quality assurance program was implemented.

About Freegold Ventures Limited

Freegold is a TSX listed company focused on the exploration of gold projects in Alaska. In addition to the Golden Summit Gold Project, the company holds a 100% in lease interest in the Rob Gold Project near the Pogo Gold Mine in the Goodpaster Mining District of Alaska and has an exploration agreement with option to lease the Vinasale Gold project in central Alaska.

Some statements in this news release contain forward-looking information, including without limitation statements as to planned expenditures and exploration programs. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs

SOURCE Freegold Ventures Limited

Kristina Walcott-President and CEO
Telephone: 1.604.662.7307
jkw@freegoldventures.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Freegold Ventures Ltd.
Bergbau
A1C4K0
CA3564552048
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.