• Sonntag, 22 Dezember 2024
  • 21:20 Uhr Frankfurt
  • 20:20 Uhr London
  • 15:20 Uhr New York
  • 15:20 Uhr Toronto
  • 12:20 Uhr Vancouver
  • 07:20 Uhr Sydney

Great Quest Increases the Tilemsi Phosphate Inferred Resource (Mali) by over 50%, to 50 Million Tonnes, and Appoints Dr. Robert Rennie as Company Advisor

23.10.2012  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 10/23/12 -- Joel Jeangrand, President and CEO of Great Quest Metals Ltd. (the "Company") (TSX VENTURE: GQ)(FRANKFURT: GQM), is pleased to announce that an updated resource estimate on the Tilemsi Phosphate Project has resulted in an increase of 17.4 million tonnes of inferred phosphate resource at an average grade of 25.9% P2O5. At a 10% cut- off grade, the updated resource estimate represents a 53% increase of the Tilemsi phosphate resource reported by Great Quest in the NI 43-101 Technical Report filed in August 2012. Together with the previously estimated resources on the Alfachatfa and Tin Hina, two other areas within the Tilemsi license, the total inferred resource now stands at 50 million tonnes with an average grade of 24.3% P2O5 (at 10% cut-off).



Table 1: Summarized Resource Estimate - Tilemsi Project

Average
Drilling Target Cut-Off Tonnes Grade
Campaign Zone Grade (%) (000's) (P2O5 %)
----------------------------------------------------------------------------
Phase I Alfatchafa 10 12,538 22.16
Phase I Tin Hina 10 20,000 24.24
Phase II Tarkint Est 10 17,436 25.87
Phases I and II Total 10 49,974 24.29


This technical report entitled "Tilemsi Phosphate Project, Mali - Tarkint Est Area. Resource Estimate" (the "Report"), dated October 17, 2012, will be available shortly on SEDAR and on the Company's corporate website www.greatquest.com. The Report is based on the second phase of the Company's drilling program conducted in the fourth quarter of 2011 on Tarkint Est, one of Great Quest's three phosphate licenses (see Map 1: http://media3.marketwire.com/docs/GQ-1023-MAP.pdf).


RESOURCE ESTIMATE HIGHLIGHTS:



-- As can be seen from Table 2, the results show little sensitivity to cut-
off grades, with most of the resource assays above 20%, which bodes well
for future beneficiation processes.

-- Geochemical analyses of the phosphate samples indicate they are clean of
deleterious elements

-- Average overburden in Tarkint Est is about 7.6m, which will result in a
strip ratio of 5.7:1 (t/t). About 10% of the Tarkint Est resource occurs
along the edges of the plateaus and could be mined without any
stripping.


Table 2: Summarized Resource Estimate - Tarkint Est

Cut-off Tonnes Average grade
grade % (000's) P2O5 %
---------------------------------------------
20 17,194 25.98
15 17,436 25.87
10 17,436 25.87


Property Description and Location:


The Tilemsi Phosphate Project comprises the contiguous Tilemsi, Tarkint Est, and Aderfoul licenses and covers a land package of around 1,206 sq. km. The Tarkint Est license covers 589 sq. km and hosts the target area of the late 2011 drilling campaign. The drilling tested 3 large plateau areas - the western In Tassit, the central Chenamagel and the eastern Tagit N'Ouerene.


Analytical Procedure:


This mineral resource estimate of work done to date on Tarkint Est is based on the data derived from 608m of Rotary Air Blast (RAB) drilling in 48 drillholes and 48 bulk samples, taken from outcrops and at shallow depths from trenches and excavations. All drilling protocols and geological sampling of the program were established by Mr. Jed Diner, MSc P.Geol. Drill cuttings were sent to ALS Bamako Minerals Laboratory and to ALS Laboratory in Vancouver, BC.


Great Quest President and CEO, Joel Jeangrand, commented: "This latest resource report confirms that the Tilemsi deposit is graduating to become a world-class deposit, thanks to its increasing size and potential for low extraction cost. Given the extensive land surface of our project and the work done so far, we can only expect a substantial upsize potential on the project. An inferred resource of 50 million tonnes will greatly benefit the findings of our Preliminary Economic Assessment (PEA), expected to be completed in the fourth quarter of 2012."


Exploration and Development Initiatives:


The Company's exploration and development program on Tilemsi, designed to expedite the path to a production decision, includes of the following components:



-- Aircore drilling to upgrade 'inferred' resource into the 'indicated'
category;

-- Pursuing the Company's exploration program on new target zones within
the three concessions to increase the size of the project resource, as
soon as the local geopolitical situation permits;

-- Completion of a Preliminary Economic Assessment by year-end;

-- Initiation of a product development and marketing strategy report;

-- Initiation of a Feasibility Study in 2013.


The readers are cautioned that:



i. Mineral resources which are not mineral reserves do not have
demonstrated economic viability. The estimate of mineral resources may
be materially affected by environmental, permitting, legal, title,
taxation, socio-political, marketing, or other relevant issues.
Estimates are rounded since the figures are not precise calculations.

ii. The quantity and grade of reported inferred resources in this estimation
are uncertain in nature and there has been insufficient exploration to
define these inferred resources as an indicated or measured mineral
resource and it is uncertain if further exploration will result in
upgrading them to an indicated or measured mineral resource category.

iii.The mineral resources in this report were estimated using the Canadian
Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on
Mineral Resources and Reserves, Definitions and Guidelines prepared by
the CIM Standing Committee on Reserve Definitions and adopted by CIM
Council.


Qualified Person


Mr. Jed Diner, MSc. P.Geol., a Qualified Person as defined under NI 43-101, completed the mineral resource estimate and has reviewed the technical information presented in this release. Mr. Diner completed his MSc. in Applied Earth Science at Stanford University in 1983 and works internationally on mineral exploration and resource development projects. He has consulted on other phosphate projects in Uzbekistan, Peru and Angola. The resource estimate complies with the NI 43-101 for the Standard of Disclosure for Mineral Projects as adopted by the Canadian Securities Regulators.


APPOINTMENT OF DR. ROBERT RENNIE AS ADVISOR


The Company is also pleased to announce the appointment of Dr. Robert Rennie as Company Advisor. Recently retired as President and CEO of Spur Ventures, Dr. Rennie has over 27 years' experience in the fertilizer business. He began his career as a researcher working for the joint division of the FAO/IAEA of the United Nations and Agriculture Canada before being recruited by Esso Chemical to develop new and proprietary fertilizer products. He then rose to the position of Vice President International for Agrium, where he was responsible for the construction of the world's largest ammonia/urea plant and Agrium's retail fertilizer network in Argentina. He is Chairman of the Alberta Value Added Corporation (AVAC) and co-chair of ABIC 2013, the Agricultural Biotechnology International Conference. Dr. Rennie brings his valuable insight and experience to the preparation of the Company's PEA and its ongoing work on the Tilemsi Phosphate project.


ON BEHALF OF THE BOARD OF DIRECTORS OF GREAT QUEST METALS LTD.


Joel Jeangrand, President, CEO & Director


About Great Quest:


Great Quest Metals Ltd. is a Canadian mineral exploration company with assets in Mali, West Africa. The Company is focused on developing the Tilemsi Phosphate Project, encompassing 1,206 km2 in eastern Mali. The Company also holds several gold concessions in the productive Birimian gold belt in western Mali. Great Quest is listed on TSX Venture Exchange under the symbol GQ, and the Frankfurt Stock Exchange under the symbol GQM.


The statements that are not historical facts and are forward-looking statements involving known and unknown risks and uncertainties could cause actual results to vary materially from the targeted results. We seek safe harbor.


Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

Contacts:

Great Quest Metals Ltd.

Candice Font

Investor Relations

+1 604-689-2882 or Toll Free: 1 877-325-3838

604-684-5854 (FAX)
www.greatquest.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Great Quest Gold Ltd.
Bergbau
A40JV5
CA39119C1095
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.