• Sonntag, 22 Dezember 2024
  • 16:19 Uhr Frankfurt
  • 15:19 Uhr London
  • 10:19 Uhr New York
  • 10:19 Uhr Toronto
  • 07:19 Uhr Vancouver
  • 02:19 Uhr Sydney

Almaden Completes Drilling for Maiden Resource, Hits 18.00 Meters of 6.6 g/t AuEq (6.36 g/t Au, 14.0 g/t Ag) on Northeast Extension

19.11.2012  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 11/19/12 -- Almaden Minerals Ltd. ("Almaden" or "the Company") (TSX: AMM)(NYSE Amex: AAU)(NYSE MKT: AAU) is pleased to announce final drill results to be included in the Company's maiden resource estimate. With the results today 225 holes accounting for 81,971.03 meters of drilling, all drilled since the discovery was made in 2010, will form the basis of the resource estimate. The exploration drilling program at Ixtaca is on-going. The results reported today demonstrate the continuity of the known mineralisation as well as the presence of high grades locally. Highlights from the holes released today include the following intercepts (a more complete list of intercepts is shown in the table below):



Hole TU-12-196 NORTHEAST EXTENSION SECTION 499+30N:
152.41 meters @ 0.46 g/t gold and 12.1 g/t silver (0.7 g/t
gold equivalent)
Including 39.66 meters @ 1.21 g/t gold and 3.8 g/t silver (1.3 g/t gold
equivalent)
And 10.50 meters @ 3.11 g/t gold and 5.1 g/t silver (3.2 g/t gold
equivalent)
And 4.40 meters @ 1.87 g/t gold and 119.9 g/t silver (4.3 g/t
gold equivalent)

Hole TU-12-208 NORTHEAST EXTENSION SECTION 499+30N:
81.82 meters @ 0.44 g/t gold and 6.0 g/t silver (0.6 g/t gold
equivalent)
39.40 meters @ 1.45 g/t gold and 113.8 g/t silver (3.7 g/t
gold equivalent)
Including 6.25 meters @ 8.44 g/t gold and 624.8 g/t silver (20.9 g/t
gold equivalent)

Hole TU-12-211 MAIN IXTACA ZONE SECTION 10+375E:
156.65 meters @ 0.59 g/t gold and 28.6 g/t silver (1.2 g/t
gold equivalent)
Including 13.80 meters @ 0.97 g/t gold and 82.9 g/t silver (2.6 g/t
gold equivalent)

Hole TU-12-212 IXTACA NORTH ZONE SECTION 10+525E:
15.00 meters @ 0.59 g/t gold and 40.8 g/t silver (1.4 g/t
gold equivalent)
17.05 meters @ 2.27 g/t gold and 30.7 g/t silver (2.9 g/t
gold equivalent)

Hole TU-12-214 IXTACA NORTH ZONE SECTION 10+925E:
13.40 meters @ 0.45 g/t gold and 215.2 g/t silver (4.8 g/t
gold equivalent)
Including 2.50 meters @ 0.90 g/t gold and 901.9 g/t silver (18.9 g/t
gold equivalent)
11.70 meters @ 0.20 g/t gold and 119.0 g/t silver (2.6 g/t
gold equivalent)

Hole TU-12-217 IXTACA NORTH ZONE SECTION 10+525E:
14.10 meters @ 1.27 g/t gold and 87.1 g/t silver (3.0 g/t
gold equivalent)
5.80 meters @ 1.08 g/t gold and 108.9 g/t silver (3.3 g/t
gold equivalent)

Hole TU-12-219 IXTACA NORTH ZONE SECTION 10+950E:
18.80 meters @ 2.27 g/t gold and 4.4 g/t silver (2.4 g/t gold
equivalent)

Hole TU-12-221 NORTHEAST EXTENSION SECTION 500+00N:
41.60 meters @ 0.68 g/t gold and 3.6 g/t silver (0.8 g/t gold
equivalent)
97.75 meters @ 1.49 g/t gold and 10.1 g/t silver (1.7 g/t
gold equivalent)
Including 18.00 meters @ 6.36 g/t gold and 14.0 g/t silver (6.6 g/t
gold equivalent)
And 10.75 meters @ 8.22 g/t gold and 13.8 g/t silver (8.5 g/t
gold equivalent)



----------------------------------------------------------------------------
From To Interval Au Ag AuEq AgEq
Hole # (m) (m) (m) (g/t) (g/t) (g/t) (g/t) SECTION
----------------------------------------------------------------------------
TU-12-184 90.00 104.00 14.00 0.43 6.2 0.5 27 10925E
----------------------------------------------------------------------------
TU-12-196 21.34 173.75 152.41 0.46 12.1 0.7 35 49930N
--------------------------------------------------------------------
including 21.34 61.00 39.66 1.21 3.8 1.3 64
--------------------------------------------------------------------
including 25.00 35.50 10.50 3.11 5.1 3.2 160
--------------------------------------------------------------------
including 135.00 139.40 4.40 1.87 119.9 4.3 213
--------------------------------------------------------------------
TU-12-196 185.00 189.80 4.80 0.27 32.4 0.9 46
--------------------------------------------------------------------
TU-12-196 205.00 240.00 35.00 1.58 11.5 1.8 91
--------------------------------------------------------------------
including 216.35 217.35 1.00 49.15 123.5 51.6 2581
--------------------------------------------------------------------
TU-12-196 354.25 358.25 4.00 0.35 8.4 0.5 26
----------------------------------------------------------------------------
TU-12-201 21.34 94.00 72.66 0.34 17.4 0.7 34 49930N
--------------------------------------------------------------------
including 21.34 24.50 3.16 1.58 6.6 1.7 85
--------------------------------------------------------------------
including 86.00 91.75 5.75 0.16 169.9 3.6 178
--------------------------------------------------------------------
including 86.00 87.25 1.25 0.24 618.4 12.6 630
--------------------------------------------------------------------
TU-12-201 143.00 155.70 12.70 0.14 39.7 0.9 47
--------------------------------------------------------------------
TU-12-201 198.10 203.05 4.95 0.11 9.6 0.3 15
--------------------------------------------------------------------
TU-12-201 209.80 245.85 36.05 0.27 15.1 0.6 29
--------------------------------------------------------------------
including 209.80 212.30 2.50 2.65 134.9 5.4 268
----------------------------------------------------------------------------
TU-12-202 26.50 66.50 40.00 0.35 1.4 0.4 19 10375E
--------------------------------------------------------------------
including 26.50 38.00 11.50 0.78 0.5 0.8 39
--------------------------------------------------------------------
TU-12-202 137.10 172.50 35.40 0.62 12.3 0.9 43
--------------------------------------------------------------------
including 139.10 145.10 6.00 2.57 35.4 3.3 164
--------------------------------------------------------------------
TU-12-202 249.30 260.80 11.50 0.10 16.7 0.4 22
----------------------------------------------------------------------------
TU-12-204 27.43 61.00 33.57 0.40 2.0 0.4 22 49930N
--------------------------------------------------------------------
TU-12-204 95.00 102.60 7.60 0.17 16.5 0.5 25
--------------------------------------------------------------------
TU-12-204 184.70 191.70 7.00 0.07 34.6 0.8 38
--------------------------------------------------------------------
TU-12-204 258.35 270.80 12.45 0.13 9.7 0.3 16
--------------------------------------------------------------------
TU-12-204 368.90 418.80 49.90 0.24 7.9 0.4 20
--------------------------------------------------------------------
including 368.90 375.70 6.80 0.57 14.9 0.9 43
--------------------------------------------------------------------
TU-12-204 423.80 428.30 4.50 0.26 4.4 0.4 18
----------------------------------------------------------------------------
TU-12-207 135.20 161.10 25.90 0.27 11.3 0.5 25 10375E
--------------------------------------------------------------------
TU-12-207 171.10 181.00 9.90 0.14 26.4 0.7 33
--------------------------------------------------------------------
TU-12-207 210.00 211.70 1.70 1.70 216.7 6.0 302
----------------------------------------------------------------------------
TU-12-208 24.38 106.20 81.82 0.44 6.0 0.6 28 49930N


--------------------------------------------------------------------
including 24.38 36.10 11.72 1.04 7.8 1.2 60
--------------------------------------------------------------------
TU-12-208 120.60 160.00 39.40 1.45 113.8 3.7 186
--------------------------------------------------------------------
including 128.60 134.85 6.25 8.44 624.8 20.9 1047
--------------------------------------------------------------------
including 128.60 131.10 2.50 19.75 1203.8 43.8 2192
--------------------------------------------------------------------
TU-12-208 172.00 233.80 61.80 0.24 11.8 0.5 24
--------------------------------------------------------------------
including 229.50 232.00 2.50 2.07 30.8 2.7 134
----------------------------------------------------------------------------
TU-12-210 51.82 109.80 57.98 0.28 5.1 0.4 19 10925E
--------------------------------------------------------------------
TU-12-210 120.00 148.00 28.00 0.15 54.3 1.2 62
--------------------------------------------------------------------
including 122.00 134.00 12.00 0.22 114.7 2.5 126
--------------------------------------------------------------------
TU-12-210 155.50 166.50 11.00 0.07 34.4 0.8 38
--------------------------------------------------------------------
TU-12-210 198.50 200.50 2.00 0.12 79.8 1.7 86
--------------------------------------------------------------------
TU-12-210 215.50 234.85 19.35 0.18 16.6 0.5 26
----------------------------------------------------------------------------
TU-12-211 31.20 187.85 156.65 0.59 28.6 1.2 58 10375E
--------------------------------------------------------------------
including 70.70 84.50 13.80 0.97 82.9 2.6 131
--------------------------------------------------------------------
including 97.80 105.65 7.85 1.07 59.4 2.3 113
--------------------------------------------------------------------
including 129.85 142.40 12.55 1.38 53.3 2.4 122
--------------------------------------------------------------------
including 172.85 183.85 11.00 0.91 56.7 2.0 102
----------------------------------------------------------------------------
TU-12-212 43.60 58.60 15.00 0.59 40.8 1.4 70 10525E
--------------------------------------------------------------------
TU-12-212 67.70 84.75 17.05 2.27 30.7 2.9 144
--------------------------------------------------------------------
including 74.20 76.20 2.00 16.06 97.0 18.0 900
--------------------------------------------------------------------
TU-12-212 95.50 103.30 7.80 0.20 10.9 0.4 21
--------------------------------------------------------------------
TU-12-212 116.20 124.60 8.40 0.31 64.5 1.6 80
----------------------------------------------------------------------------
TU-12-213 5.49 11.00 5.51 0.33 1.3 0.4 18 10950E
--------------------------------------------------------------------
TU-12-213 16.00 26.82 10.82 0.32 1.3 0.3 17
--------------------------------------------------------------------
TU-12-213 50.50 83.50 33.00 0.56 4.3 0.6 32
--------------------------------------------------------------------
including 58.50 77.00 18.50 0.82 5.2 0.9 46
--------------------------------------------------------------------
TU-12-213 111.50 146.20 34.70 0.29 5.7 0.4 20
----------------------------------------------------------------------------
TU-12-214 40.85 106.00 65.15 0.38 2.8 0.4 22 10925E
--------------------------------------------------------------------
TU-12-214 181.10 201.70 20.60 0.13 31.3 0.8 38
--------------------------------------------------------------------
including 193.25 195.50 2.25 0.13 145.5 3.0 152
--------------------------------------------------------------------
TU-12-214 209.50 218.60 9.10 0.09 12.6 0.3 17
--------------------------------------------------------------------
TU-12-214 228.50 307.50 79.00 0.20 70.5 1.6 81
--------------------------------------------------------------------
including 249.00 277.00 28.00 0.33 126.6 2.9 143
--------------------------------------------------------------------
including 261.60 275.00 13.40 0.45 215.2 4.8 238
--------------------------------------------------------------------
including 269.50 272.00 2.50 0.90 901.9 18.9 947
--------------------------------------------------------------------
including 286.50 298.20 11.70 0.20 119.0 2.6 129
--------------------------------------------------------------------
including 293.60 297.60 4.00 0.30 263.0 5.6 278
--------------------------------------------------------------------
including 301.50 305.00 3.50 0.29 74.2 1.8 89
----------------------------------------------------------------------------
TU-12-215 70.30 111.60 41.30 0.54 3.8 0.6 31 50000N
--------------------------------------------------------------------
TU-12-215 153.70 166.50 12.80 0.10 7.5 0.2 12
--------------------------------------------------------------------
TU-12-215 473.50 491.30 17.80 0.69 36.1 1.4 71
--------------------------------------------------------------------
including 476.50 488.30 11.80 0.92 50.3 1.9 96
--------------------------------------------------------------------
TU-12-215 509.45 554.15 44.70 0.26 12.4 0.5 26
----------------------------------------------------------------------------
TU-12-217 43.90 58.00 14.10 1.27 87.1 3.0 151 10525E
--------------------------------------------------------------------
including 49.20 49.70 0.50 34.20 2050.0 75.2 3760
--------------------------------------------------------------------
TU-12-217 64.00 112.10 48.10 0.08 9.5 0.3 14
--------------------------------------------------------------------
including 105.70 107.30 1.60 0.84 43.3 1.7 85
--------------------------------------------------------------------
TU-12-217 132.70 161.65 28.95 0.37 33.7 1.0 52
--------------------------------------------------------------------
including 142.00 147.80 5.80 1.08 108.9 3.3 163
----------------------------------------------------------------------------
TU-12-218 39.01 91.00 51.99 0.57 3.5 0.6 32 10925E
--------------------------------------------------------------------
including 69.00 80.00 11.00 0.96 2.4 1.0 50
----------------------------------------------------------------------------
TU-12-219 48.16 105.90 57.74 0.41 8.8 0.6 29 10950E
--------------------------------------------------------------------
including 97.20 104.00 6.80 0.62 32.7 1.3 64
--------------------------------------------------------------------
TU-12-219 127.90 146.70 18.80 2.27 4.4 2.4 118
--------------------------------------------------------------------
including 135.25 135.75 0.50 78.40 14.4 78.7 3934
----------------------------------------------------------------------------
TU-12-220 6.10 13.50 7.40 0.21 2.2 0.3 13 10950E
--------------------------------------------------------------------
TU-12-220 56.00 108.00 52.00 0.52 7.1 0.7 33
--------------------------------------------------------------------
including 79.00 89.00 10.00 0.95 7.8 1.1 55
--------------------------------------------------------------------
TU-12-220 117.00 252.60 135.60 0.16 38.1 0.9 46
--------------------------------------------------------------------
including 183.50 187.60 4.10 0.18 110.8 2.4 120
--------------------------------------------------------------------
including 201.25 248.00 46.75 0.22 67.0 1.6 78
--------------------------------------------------------------------
including 204.75 207.75 3.00 0.48 151.8 3.5 176
--------------------------------------------------------------------
TU-12-220 264.57 276.76 12.19 0.16 26.2 0.7 34
----------------------------------------------------------------------------
TU-12-221 71.70 113.30 41.60 0.68 3.6 0.8 38 50000N
--------------------------------------------------------------------
including 73.20 78.10 4.90 2.62 5.2 2.7 136
--------------------------------------------------------------------
TU-12-221 409.50 507.25 97.75 1.49 10.1 1.7 85
--------------------------------------------------------------------
including 451.50 469.50 18.00 6.36 14.0 6.6 332
--------------------------------------------------------------------
including 451.50 453.50 2.00 7.01 25.7 7.5 376
--------------------------------------------------------------------
including 458.75 469.50 10.75 8.22 13.8 8.5 425
--------------------------------------------------------------------
TU-12-221 520.25 523.75 3.50 0.16 10.6 0.4 18
----------------------------------------------------------------------------


J.D. Poliquin, Chairman of Almaden commented, "These new results show the continued expansion of the overall Ixtaca vein system. We are excited to be working towards our maiden resource. Since the discovery in 2010 of the Main Ixtaca Zone we have found the parallel Ixtaca North Zone, the perpendicular Northeast Extension (Chemalaco) Zone and widespread mineralisation in the volcanic units. All of these zones remain open and drilling is on-going to expand the resource beyond the boundaries set for the maiden resource, a snapshot of drilling results to date."


The Company currently has three drills operating on the Tuligtic project. Almaden plans to continue drilling operations throughout 2012. Below is a plan map, relevant sections and table of significant intervals which will be posted to the Company's website (www.almadenminerals.com).


To view the plan map, sections and table, please visit: http://media3.marketwire.com/docs/SectionPR.pdf.


About the Ixtaca Property


The 100% owned Ixtaca zone is a blind discovery made by the Company in 2010. The Main Ixtaca and Ixtaca North Zones of veining are thought to have a north-easterly trend. Holes to date suggest that the Main Ixtaca and Ixtaca North Zones are sub vertical with local variations. This interpretation suggests that true widths range from approximately 35% of intersected widths for a -70 degree hole to 94% of intersected widths for a -20 degree hole. The drilling completed to date has traced mineralisation over 1,000 meters along this northeast trend. Based upon observations at surface and of core as drilling progresses, there seems to be a variety of veinlet orientations within the Northeast Extension Zone however overall the zone is currently interpreted to be dipping shallowly to the west and striking roughly north-south.


Mr. Norm Dircks, P.Geo., a qualified person ("QP") under the meaning of NI 43-101, is the QP and project manager of Almaden's Ixtaca program and reviewed the technical information in this news release. The analyses reported were carried out at ALS Chemex Laboratories of North Vancouver using industry standard analytical techniques. For gold, samples are first analysed by fire assay and atomic absorption spectroscopy ("AAS"). Samples that return values greater than 10 g/t gold using this technique are then re-analysed by fire assay but with a gravimetric finish. Silver is first analysed by Inductively Coupled Plasma - Atomic Emission Spectroscopy ("ICP-AES"). Samples that return values greater than 100 g/t silver by ICP-AES are then re-analysed by HF-HNO3-HCLO4 digestion with HCL leach and ICP-AES finish. Of these samples those that return silver values greater than 1,500 g/t are further analysed by fire assay with a gravimetric finish.


Blanks, field duplicates and certified standards were inserted into the sample stream as part of Almaden's quality assurance and control program which complies with National Instrument 43-101 requirements. Gold equivalent ("AuEq" or "Gold Eq.") and silver equivalent ("AgEq" or "Silver Eq.") values were calculated using silver to gold ratios of 50 to 1. The ratio of 50 to 1 was used for the sake of consistency with past news releases. Intervals that returned assays below detection were assigned zero values. Metallurgical recoveries and net smelter returns are assumed to be 100% for these calculations.


About Almaden


Almaden is a well-financed (cash, gold inventory and equity investments totalling approximately $35.6 MM as of July 4, 2012) mineral exploration company working in North America. The company has assembled mineral exploration projects, including the Ixtaca Zone and the Tuligtic project, through its grass roots exploration efforts. While the properties are largely at early stages of development they represent exciting opportunities for the discovery of significant gold, silver and copper deposits as evidenced at Ixtaca. Almaden's business model is to find and acquire mineral properties and develop them by seeking option agreements with others who can acquire an interest in a project by making payments and exploration expenditures. Through this means the company has been able to expose its shareholders to discovery and capital gain without the funding and consequent share dilution that would be required if the company were to have developed these projects without a partner. The company intends to expand this business model, described by some as prospect generation, by more aggressively exploring several of its projects including the Ixtaca Zone.


On Behalf of the Board of Directors


Morgan J. Poliquin, Ph.D., P.Eng.


President, CEO and Director


Almaden Minerals Ltd.


Except for the statements of historical fact contained herein, certain information presented constitutes "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and Canadian securities laws. Such forward-looking statements, including but not limited to, those with respect to potential expansion of mineralization, potential size of mineralized zone, and size and timing of exploration and development programs, estimated project capital and other project costs and the timing of submission and receipt and availability of regulatory approvals involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievement of Almaden to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks related to international operations and joint ventures, the actual results of current exploration activities, conclusions of economic evaluations, uncertainty in the estimation of mineral resources, changes in project parameters as plans continue to be refined, environmental risks and hazards, increased infrastructure and/or operating costs, labour and employment matters, and government regulation and permitting requirements as well as those factors discussed in the section entitled "Risk Factors" in Almaden's Annual Information form and Almaden's latest Form 20-F on file with the United States Securities and Exchange Commission in Washington, D.C. Although Almaden has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Almaden disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, other than as required pursuant to applicable securities laws. Accordingly, readers should not place undue reliance on forward-looking statements.


Neither the Toronto Stock Exchange (TSX) nor the NYSE MKT have reviewed or accepted responsibility for the adequacy or accuracy of the contents of this news release which has been prepared by management.

Contacts:

Almaden Minerals Ltd.

604.689.7644

604.689.7645 (FAX)
www.almadenminerals.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Almaden Minerals Ltd.
Bergbau
A14X2Z
CA0202833053
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.