• Dienstag, 23 Juli 2024
  • 00:24 Uhr Frankfurt
  • 23:24 Uhr London
  • 18:24 Uhr New York
  • 18:24 Uhr Toronto
  • 15:24 Uhr Vancouver
  • 08:24 Uhr Sydney

Santacruz Silver Confirms Continuity of GSA Vein and the Stockwork Area at Gavilanes; Drilling Intersects 263 g/t Ag Over 5.40 m, Including 2,060 g/t Ag. Over 0.20 m

15.01.2013  |  Marketwire

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 01/15/13 -- Santacruz Silver Mining Ltd. (TSX VENTURE: SCZ) ("Santacruz" or the "Company") announces that further to its press release of November 20, 2012 the Company has received results from 18 additional diamond drill holes as part of an ongoing 6,000 meter diamond drill program at its 100% owned Gavilanes Silver project in Durango, Mexico. The current drill program is designed to test three of seven known silver-bearing veins and a stockwork area within the 7,347 hectare property (see attached map - http://media3.marketwire.com/docs/scz115-F1.pdf - which is also posted on the Company's website).


Drill results reported herein are from the Guadelupe-Soledad-Aranzazu (GSA) vein and the Stockwork area of El Hundido. Gavilanes hosts a low sulphidation epithermal system.


Highlights (reported as true widths and assays uncut) include:


Hundido Stockwork



-- SCHN-09: 5.40 m @ 286 g/t Ag eq. (263 g/t Ag, 0.28% Zn, 0.69% Pb and
0.01 g/t Au).
-- SCHN-08: 4.95 m @ 439 g/t Ag eq. (427 g/t Ag, 0.07% Zn, 0.40% Pb and
0.01 g/t Au).
-- SCHN-07: 4.70 m @ 274 g/t Ag eq. (212 g/t Ag, 1.18% Zn, 1.13% Pb and
0.03 g/t Au).


GSA Vein



-- SCGP-12: 3.82 m @ 267 g/t Ag eq. (243 g/t Ag, 0.21% Zn, 0.32% Pb and
0.23 g/t Au).


Two drill rigs are currently working at Gavilanes on the last phase of the first 6,000 meter drilling campaign. Arturo Prestamo, President and CEO stated, "We are very pleased with the drill results thus far as it continues to prove grades and widths on the targeted mineralized areas, reinforcing our belief that Gavilanes will continue to return high grade silver as the property is more fully explored."


Complete results from the 18 drill holes in addition to the first 7 holes announced on November 20, 2012, and in this press release which have been received to date are as follows: (Note that the first 7 holes announced on November 20, 2012 were not in numeric sequence. Due to hole numbers being assigned using the proposed drill hole number instead of numbering them in the actual order they were drilled in. Since holes are not being drilled in the same sequence as the drill plan, the hole numbers were not in sequence. For example, hole 22 was actually the fourth hole completed. This has been rectified but will continue to appear in the reporting until the 22nd hole has actually been completed).



----------------------------------------------------------------------------
True
Length Width Au Ag Cu Pb Zn AgEq
VEIN DDH From To mts. mts. g/t % g/t
----------------------------------------------------------------------------
SCHN
EL -01 46.40 47.55 1.15 0.81 0.00 79 0.01 0.12 0.16 84.97
SCHN
HUNDIDO -01 47.55 48.55 1.00 0.70 0.00 61 0.00 0.07 0.13 64.83
SCHN
ST -01 48.55 49.50 0.95 0.67 0.00 351 0.01 0.29 0.19 361.89
SCHN
-01 49.50 50.05 0.55 0.39 0.00 50 0.00 0.09 0.10 53.82
SCHN
-01 50.05 50.95 0.90 0.63 0.00 511 0.03 0.75 0.22 534.58
SCHN
-01 50.95 51.70 0.75 0.53 0.00 497 0.08 0.36 0.22 515.46
SCHN
-01 51.70 52.50 0.80 0.56 0.00 280 0.02 0.15 0.05 285.59
SCHN
-01 52.50 53.10 0.60 0.42 0.00 184 0.15 0.79 0.32 220.14
SCHN
-01 53.10 54.15 1.05 0.74 0.03 212 0.07 0.27 0.17 228.69
SCHN
-01 54.15 55.50 1.35 0.95 0.00 7 0.05 0.23 0.32 22.32
SCHN
-01 55.50 56.75 1.25 0.88 0.03 101 0.10 0.36 0.09 120.44
----------------------------------------------------------------------------
Total 10.35 7.25 0.01 197 0.05 0.30 0.18 211.11
----------------------------------------------------------------------------
SCHN
EL -01 62.90 64.40 1.50 1.08 0.01 325 0.08 0.48 0.12 344.38
SCHN
HUNDIDO -01 64.40 65.40 1.00 0.72 0.01 195 0.02 0.35 0.15 208.08
SCHN
ST -01 65.40 65.75 0.35 0.25 0.06 322 0.05 0.75 0.11 347.29
----------------------------------------------------------------------------
Total 2.85 2.05 0.01 279 0.06 0.47 0.13 296.91
----------------------------------------------------------------------------
SCHN
EL -01 108.50 109.35 0.85 0.61 0.00 102 0.00 0.03 0.07 104.20
SCHN
HUNDIDO -01 109.35 110.25 0.90 0.65 0.00 876 0.02 0.21 0.11 884.54
SCHN
ST -01 110.25 111.50 1.25 0.90 0.00 643 0.02 0.12 0.05 648.52
SCHN
-01 111.50 112.40 0.90 0.65 0.00 72 0.00 0.03 0.07 74.41
----------------------------------------------------------------------------
Total 3.90 2.19 0.00 572 0.02 0.13 0.09 577.79
----------------------------------------------------------------------------
SCHN
EL -01 119.85 120.30 0.45 0.32 0.00 290 0.01 0.10 0.08 294.38
SCHN
HUNDIDO -01 120.30 121.25 0.95 0.68 0.00 66 0.00 0.25 0.04 72.06
SCHN
ST -01 121.25 122.45 1.20 0.86 0.00 155 0.00 0.10 0.07 158.92
SCHN
-01 122.45 123.75 1.30 0.94 0.00 47 0.00 0.07 0.08 50.00
SCHN
-01 123.75 124.40 0.65 0.47 0.00 540 0.00 0.96 0.08 562.79
SCHN
-01 124.40 125.15 0.75 0.54 0.00 62 0.01 0.03 0.04 63.51
SCHN
-01 125.15 126.05 0.90 0.65 0.00 295 0.00 0.04 0.05 297.1
----------------------------------------------------------------------------
Total 6.20 4.46 0.00 178 0.00 0.19 0.06 183.46
----------------------------------------------------------------------------
SCHN
EL -01 198.50 199.60 1.10 0.79 1.45 58 0.24 0.05 0.05 156.15
SCHN
HUNDIDO -01 199.60 200.20 0.60 0.43 1.41 38 0.26 0.03 0.04 135.61
SCHN
ST -01 200.20 201.10 0.90 0.65 2.40 42 0.13 0.09 0.04 181.81
----------------------------------------------------------------------------
Total 2.60 1.87 1.77 48 0.21 0.06 0.04 160.29
----------------------------------------------------------------------------

----------------------------------------------------------------------------
True
Length Width Au Ag Cu Pb Zn AgEq
VEIN DDH From To mts. mts. g/t % g/t
----------------------------------------------------------------------------
SCHN
EL -01 206.85 208.05 1.20 0.86 1.93 293 2.62 0.55 0.22 619.19
SCHN
HUNDIDO -01 208.05 208.90 0.85 0.61 0.70 118 2.32 0.41 0.26 353.58
SCHN
ST -01 208.90 209.55 0.65 0.47 1.63 224 1.80 0.15 0.16 460.29
SCHN
-01 209.55 210.60 1.05 0.76 2.74 282 1.53 0.66 0.12 565.66
SCHN
-01 210.60 211.35 0.75 0.54 6.16 592 1.28 1.53 0.27 1060.03
SCHN
-01 211.35 212.25 0.90 0.65 0.07 18 0.33 0.03 0.05 49.63
SCHN
-01 212.25 213.25 1.00 0.72 0.12 52 1.30 0.07 0.10 164.45
SCHN
-01 213.25 214.20 0.95 0.68 0.68 216 1.19 5.05 0.54 467.62
SCHN
-01 214.20 215.15 0.95 0.68 0.28 110 2.19 0.65 0.17 316.80
SCHN
-01 215.15 215.95 0.80 0.58 0.23 66 0.69 0.73 0.08 150.00
SCHN
-01 215.95 216.80 0.85 0.61 0.53 35 0.35 0.30 0.12 99.43
SCHN
-01 216.80 217.80 1.00 0.72 2.78 404 1.34 4.80 0.58 774.22
----------------------------------------------------------------------------
Total 10.95 7.88 1.46 201 1.45 1.29 0.23 426.09
----------------------------------------------------------------------------
SCHN
EL -02 42.10 43.10 1.00 0.42 0.01 627 0.04 0.18 0.12 636.62
SCHN
HUNDIDO -02 43.10 44.15 1.05 0.44 0.01 380 0.03 0.25 0.30 394.72
SCHN
ST -02 44.15 45.15 1.00 0.42 0.00 644 0.03 0.24 0.23 656.22
SCHN
-02 45.15 46.65 1.50 0.63 0.00 18 0.04 0.19 0.11 27.60
SCHN
-02 46.65 47.55 0.90 0.38 0.01 355 0.05 1.25 0.33 393.60
SCHN
-02 47.55 49.25 1.70 0.71 0.05 866 0.24 1.36 1.65 951.43
----------------------------------------------------------------------------
Total 7.15 3.00 0.01 488 0.09 0.61 0.55 520.33
----------------------------------------------------------------------------
SCHN
EL -02 99.35 99.90 0.55 0.23 0.00 135 0.01 0.31 0.06 144.21
SCHN
HUNDIDO -02 99.90 100.80 0.90 0.38 0.01 20 0.04 0.69 0.10 40.93
SCHN
ST -02 100.80 101.90 1.10 0.46 0.04 88 0.45 7.15 0.09 282.82
SCHN
-02 101.90 102.45 0.55 0.23 0.05 148 0.18 20.00 0.47 609.57
SCHN
-02 102.45 103.20 0.75 0.31 0.01 59 0.08 3.84 0.59 161.64
SCHN
-02 103.20 104.00 0.80 0.34 0.03 61 0.21 4.79 0.65 196.34
SCHN
-02 104.00 104.75 0.75 0.31 0.03 74 0.27 7.48 0.26 264.09
SCHN
-02 104.75 105.50 0.75 0.31 0.03 167 0.27 2.47 0.09 245.78
SCHN
-02 105.50 106.50 1.00 0.42 0.05 373 0.24 6.56 0.17 540.51
----------------------------------------------------------------------------
Total 7.15 3.00 0.03 128 0.21 5.65 0.26 274.65
----------------------------------------------------------------------------

----------------------------------------------------------------------------
True
Length Width Au Ag Cu Pb Zn AgEq
VEIN DDH From To mts. mts. g/t % g/t
----------------------------------------------------------------------------
SCHN
EL -07 113.40 113.60 0.20 0.10 0.04 52 0.08 1.86 6.39 233.61
SCHN
HUNDIDO -07 113.60 114.45 0.85 0.41 0.01 323 0.21 1.86 3.13 445.46
SCHN
ST -07 114.45 115.75 1.30 0.63 0.00 49 0.01 0.81 1.10 89.37
SCHN
-07 115.75 116.20 0.45 0.22 0.03 744 0.03 1.74 2.73 842.37
SCHN
-07 116.20 116.90 0.70 0.00 0.00 35 0.00 0.22 0.20 44.34
SCHN
-07 116.90 117.55 0.65 0.00 0.00 379 0.00 0.25 0.21 388.89
SCHN
-07 117.55 118.45 0.90 0.00 0.00 121 0.00 0.21 0.15 128.82
SCHN
-07 118.45 119.60 1.15 0.46 0.00 394 0.01 0.45 0.73 419.81
SCHN
-07 119.60 120.60 1.00 0.40 0.01 227 0.01 1.50 1.88 299.88
SCHN
-07 120.60 121.05 0.45 0.18 0.01 240 0.02 2.35 2.18 338.43
SCHN
-07 121.05 122.15 1.10 0.44 0.01 125 0.07 0.76 0.30 153.54
SCHN
-07 122.15 123.25 1.10 0.44 0.02 403 0.06 0.77 0.61 437.84
SCHN
-07 123.25 124.35 1.10 0.44 0.01 39 0.01 0.03 0.05 41.78
SCHN
-07 124.35 125.40 1.05 0.42 0.01 13 0.00 0.02 0.04 14.80
SCHN
-07 125.40 126.15 0.75 0.30 0.24 277 1.44 4.07 1.31 519.67
SCHN
-07 126.15 126.85 0.70 0.28 0.07 60 0.14 1.27 0.29 108.43
----------------------------------------------------------------------------
Total 13.45 4.70 0.03 212 0.14 1.13 1.18 273.70
----------------------------------------------------------------------------
SCHN
EL -08 85.30 86.10 0.80 0.63 0.01 782 0.04 2.19 0.33 839.97
SCHN
HUNDIDO -08 86.10 86.95 0.85 0.67 0.00 30 0.02 0.06 0.04 33.26
SCHN
ST -08 86.95 87.70 0.75 0.59 0.02 876 0.03 0.19 0.06 885.34
SCHN
-08 87.70 88.50 0.80 0.63 0.00 40 0.01 0.08 0.03 42.52
SCHN
-08 88.50 90.10 1.60 1.26 0.02 719 0.01 0.15 0.02 724.54
SCHN
-08 90.10 90.90 0.80 0.63 0.00 202 0.00 0.01 0.01 202.73
SCHN
-08 90.90 91.60 0.70 0.55 0.01 56 0.07 0.37 0.02 70.11
----------------------------------------------------------------------------
Total 6.30 4.95 0.01 427 0.02 0.40 0.07 439.40
----------------------------------------------------------------------------
SCHN
EL -08 120.05 120.40 0.35 0.27 0.02 137 0.17 4.99 0.12 262.42
SCHN
HUNDIDO -08 120.40 121.25 0.85 0.66 0.01 5 0.05 0.06 0.02 11.37
SCHN
ST -08 121.25 121.75 0.50 0.39 0.02 11 0.04 0.14 0.02 18.17
SCHN
-08 121.75 122.20 0.45 0.35 0.26 211 0.02 0.27 0.04 232.82
SCHN
-08 122.20 122.40 0.20 0.16 0.85 427 0.03 11.55 0.02 725.72
SCHN
-08 122.40 123.00 0.60 0.47 0.49 192 0.03 2.22 0.03 269.08
----------------------------------------------------------------------------
Total 2.95 2.30 0.20 120 0.05 1.91 0.04 176.93
----------------------------------------------------------------------------

----------------------------------------------------------------------------
True
Length Width Au Ag Cu Pb Zn AgEq
VEIN DDH From To mts. mts. g/t % g/t
----------------------------------------------------------------------------
SCHN
EL -09 86.10 86.80 0.70 0.35 0.02 712 0.02 0.57 0.26 732.23
SCHN
HUNDIDO -09 86.80 87.20 0.40 0.20 0.04 2060 0.03 11.50 0.49 2325.14
SCHN
ST -09 87.20 88.45 1.25 0.63 0.02 150 0.05 1.08 0.29 184.30
SCHN
-09 88.45 89.45 1.00 0.50 0.00 85 0.01 0.22 0.29 96.40
SCHN
-09 89.45 90.40 0.95 0.48 0.00 402 0.02 0.09 0.36 412.71
SCHN
-09 90.40 91.80 1.40 0.71 0.00 239 0.01 0.08 0.27 247.25
SCHN
-09 91.80 92.70 0.90 0.45 0.00 82 0.01 0.09 0.26 90.86
SCHN
-09 92.70 93.25 0.55 0.28 0.01 143 0.02 0.23 0.31 156.40
SCHN
-09 93.25 94.40 1.15 0.58 0.01 116 0.02 0.14 0.22 125.51
SCHN
-09 94.40 94.95 0.55 0.28 0.01 96 0.01 0.08 0.21 103.41
SCHN
-09 94.95 96.00 1.05 0.53 0.01 96 0.03 0.09 0.29 106.85
SCHN
-09 96.00 96.80 0.80 0.40 0.00 75 0.02 0.14 0.18 83.37
----------------------------------------------------------------------------
Total 10.70 5.40 0.01 263 0.02 0.69 0.28 285.56
----------------------------------------------------------------------------
PROVI- SCPV
DEN- -01 146.20 147.20 1.00 0.94 0.03 13 0.04 0.07 0.36 27.00
CIA SCPV
-01 147.20 148.00 0.80 0.76 0.00 306 0.02 0.42 0.70 331.08
----------------------------------------------------------------------------
Total 1.80 1.70 0.02 143 0.03 0.22 0.51 162.14
----------------------------------------------------------------------------
SCPV
GSA ST -01 211.95 212.80 0.85 0.80 0.00 17 0.00 0.09 0.17 22.52
SCPV
-01 212.80 213.40 0.60 0.57 0.60 205 0.18 1.09 1.24 299.84
----------------------------------------------------------------------------
Total 1.45 1.37 0.25 95 0.07 0.50 0.61 137.28
----------------------------------------------------------------------------
SCPV
GSA -01 237.55 238.40 0.85 0.80 0.00 917 0.04 1.26 1.09 969.59
SCPV
-01 238.40 239.05 0.65 0.61 0.00 28 0.00 0.13 0.16 34.62
----------------------------------------------------------------------------
Total 1.50 1.42 0.00 532 0.02 0.77 0.69 564.44
----------------------------------------------------------------------------
SCGP
GSA ST -07 124.95 125.75 0.80 0.69 0.00 106 0.02 0.05 0.15 111.51
SCGP
-07 125.75 127.40 1.65 1.41 0.00 138 0.02 0.03 0.03 140.80
----------------------------------------------------------------------------
Total 2.45 2.10 0.00 128 0.02 0.04 0.07 131.24
----------------------------------------------------------------------------
SCGP
GSA -07 204.40 204.90 0.50 0.43 0.46 511 0.02 0.15 0.07 541.84
SCGP
-07 204.90 206.20 1.30 1.12 0.04 25 0.00 0.02 0.03 28.01
SCGP
-07 206.20 207.65 1.45 1.25 0.02 176 0.01 0.12 0.03 180.82
----------------------------------------------------------------------------
Total 3.25 2.80 0.09 167 0.01 0.08 0.04 175.24
----------------------------------------------------------------------------
SCGP
GSA -12 55.95 57.00 1.05 1.02 0.56 509 0.02 0.47 0.22 555.07
SCGP
-12 57.00 58.05 1.05 1.02 0.27 150 0.01 0.27 0.11 173.21
SCGP
-12 58.05 58.80 0.75 0.73 0.02 56 0.00 0.22 0.27 67.07
SCGP
-12 58.80 59.90 1.10 1.06 0.01 206 0.01 0.31 0.26 219.77
----------------------------------------------------------------------------
Total 3.95 3.82 0.23 243 0.01 0.32 0.21 267.53
----------------------------------------------------------------------------

----------------------------------------------------------------------------
True
Length Width Au Ag Cu Pb Zn AgEq
VEIN DDH From To mts. mts. g/t % g/t
----------------------------------------------------------------------------
GSA SCGP
-13 63.50 64.35 0.85 0.76 0.09 180 0.07 0.98 1.06 233.32
SCGP
-13 64.35 65.20 0.85 0.77 0.01 25 0.03 0.22 0.80 49.12
SCGP
-13 65.20 66.00 0.80 0.72 0.20 434 0.09 2.66 1.81 546.68
----------------------------------------------------------------------------
Total 2.50 2.25 0.10 208 0.06 1.26 1.21 270.56
----------------------------------------------------------------------------
GSA SCGP
-14 88.10 89.20 1.10 1.05 0.00 180 0.02 1.21 0.58 219.88
----------------------------------------------------------------------------
Total 1.10 1.05 0.00 180 0.02 1.21 0.58 219.88
----------------------------------------------------------------------------
GSA SCGP
-14 93.70 94.70 1.00 0.97 0.00 75 0.01 0.11 0.10 80.14
ST SCGP
-14 94.70 95.85 1.15 1.12 0.00 93 0.01 0.12 0.04 97.19
SCGP
-14 95.85 97.15 1.30 1.26 0.00 134 0.01 0.12 0.09 138.94
----------------------------------------------------------------------------
Total 3.45 3.35 0.00 103 0.01 0.12 0.08 107.98
----------------------------------------------------------------------------
GSA SCGP
-15 95.55 96.20 0.65 0.59 0.06 105 0.01 0.07 0.10 113.04
SCGP
-15 96.20 97.10 0.90 0.81 0.06 94 0.01 0.12 0.14 103.37
SCGP
-15 97.10 97.95 0.85 0.77 0.14 22 0.01 0.21 0.17 38.21
SCGP
-15 97.95 99.05 1.10 0.99 0.19 87 0.07 2.19 2.82 208.03
----------------------------------------------------------------------------
Total 3.50 3.15 0.12 76 0.03 0.78 0.98 122.23
----------------------------------------------------------------------------
GSA SCGP
-15 113.05 113.55 0.50 0.46 0.00 310 0.01 0.26 0.46 325.89
ST SCGP
-15 113.55 114.70 1.15 1.05 0.00 83 0.01 0.41 0.41 100.34
SCGP
-15 114.70 115.25 0.55 0.50 0.01 677 0.02 1.23 0.42 714.67
SCGP
-15 115.25 116.40 1.15 1.05 0.00 326 0.02 0.93 0.87 366.03
----------------------------------------------------------------------------
Total 3.35 3.05 0.00 298 0.02 0.70 0.58 326.07
----------------------------------------------------------------------------
GSA SCGP
-16 117.30 117.50 0.20 0.12 0.03 48 0.04 2.17 5.26 208.88
----------------------------------------------------------------------------
Total 0.20 0.12 0.03 48 0.04 2.17 5.26 208.88
----------------------------------------------------------------------------
GSA SCGP
-17 101.95 102.55 0.60 0.46 0.18 85 0.08 0.35 1.04 130.03
SCGP
-17 102.55 103.95 1.40 1.08 0.06 71 0.09 0.35 0.85 106.98
SCGP
-17 103.95 104.85 0.90 0.69 0.42 82 0.05 0.43 0.98 137.41
SCGP
-17 104.85 105.80 0.95 0.73 0.02 59 0.04 0.08 0.92 84.72
SCGP
-17 105.80 106.40 0.60 0.46 1.19 150 0.12 0.71 4.26 326.00
SCGP
-17 106.40 107.20 0.80 0.62 0.42 48 0.02 0.40 0.96 100.02
SCGP
-17 107.20 108.00 0.80 0.64 0.73 307 0.13 1.34 4.89 486.16
SCGP
-17 108.00 108.70 0.70 0.56 0.75 109 0.02 0.98 2.56 224.85
----------------------------------------------------------------------------
Total 6.75 5.25 0.41 109 0.07 0.55 1.88 187.22
----------------------------------------------------------------------------

----------------------------------------------------------------------------
True
Length Width Au Ag Cu Pb Zn AgEq
VEIN DDH From To mts. mts. g/t % g/t
----------------------------------------------------------------------------
GSA SCGP
-18 131.65 132.65 1.00 0.65 2.39 106 0.39 1.88 1.22 330.25
----------------------------------------------------------------------------
Total 1.00 0.65 2.39 106 0.39 1.88 1.22 330.25
----------------------------------------------------------------------------
GSA SCGP
-19 89.00 90.20 1.20 1.10 0.00 43 0.00 0.10 0.23 49.50
SCGP
-19 90.20 90.80 0.60 0.55 0.00 14 0.00 0.13 0.27 21.96
----------------------------------------------------------------------------
Total 1.80 1.65 0.00 33 0.00 0.11 0.24 40.32
----------------------------------------------------------------------------
GSA SCGP
-20 106.85 107.60 0.75 0.65 0.02 209 0.01 0.22 0.28 221.26
SCGP
-20 107.60 108.30 0.70 0.60 0.01 77 0.00 0.14 0.28 86.70
----------------------------------------------------------------------------
Total 1.45 1.25 0.02 145 0.00 0.18 0.28 156.30
----------------------------------------------------------------------------
GSA SCGP
-20 132.90 133.35 0.45 0.39 0.10 82 0.01 4.78 21.70 640.60
SCGP
-20 133.35 133.70 0.35 0.31 0.01 158 0.01 0.66 1.99 214.82
----------------------------------------------------------------------------
Total 0.80 0.70 0.06 115 0.01 2.97 13.03 453.32
----------------------------------------------------------------------------
GSA SCGP
-23 125.70 126.10 1.10 0.85 0.48 104 0.50 1.27 4.43 288.58
----------------------------------------------------------------------------
Total 1.10 1.05 0.48 104 0.50 1.27 4.43 288.58
----------------------------------------------------------------------------
GSA SCGP
-24 174.85 176.15 1.30 0.76 0.24 42 0.02 0.02 0.06 57.39
SCGP
-24 176.15 177.25 1.10 0.64 0.38 272 0.05 0.05 0.14 299.74
----------------------------------------------------------------------------
Total 2.40 1.40 0.30 147 0.03 0.03 0.09 168.47
----------------------------------------------------------------------------

EqAgOz= (Au(i)Pau/31.1035)+(Ag(i)Pag/31.1035)(+(Cu(i)Pcu(i)22.05)+(Pb(i)Ppb(
i)22.05)+(Zn(i)Pzn(i)22.05)(i)31.1035
--------------------------------------------------------------------
(Pag)


Diamond Drill Holes Location:



---------------------------------------------------------------------------
---------------------------------------------------------------------------
UTM Collar Coordinates
-----------------------------------------------------------------
DDH ID North East Elevation
---------------------------------------------------------------------------
---------------------------------------------------------------------------
SCGP-07 2,678,359.70 425,622 2,146.91
---------------------------------------------------------------------------
SCGP-12 2,678,568.93 425,681.60 2,144.89
---------------------------------------------------------------------------
SCGP-13 2,678,568.65 425,680.56 2,145.04
---------------------------------------------------------------------------
SCGP-14 2,678,613.16 425,637.95 2,149.35
---------------------------------------------------------------------------
SCGP-15 2,678,613.03 425,636.83 2,149.45
---------------------------------------------------------------------------
SCGP-16 2,678,612.83 425,636.20 2,149.55
---------------------------------------------------------------------------
SCGP-17 2,678,587.55 425,639.82 2,146.90
---------------------------------------------------------------------------
SCGP-18 2,678,587.60 425,639.33 2,146.91
---------------------------------------------------------------------------
SCGP-19 2,678,711.42 425,613.09 2,166.03
---------------------------------------------------------------------------
SCGP-20 2,678,711.11 425,611.20 2,166.01
---------------------------------------------------------------------------
SCGP-23 2,678,711.08 425,610.87 2,166.07
---------------------------------------------------------------------------
SCGP-24 2,678,711.04 425,610.23 2,165.36
---------------------------------------------------------------------------
SCHN-01 2,678,344.02 425,536.28 2,098.63
---------------------------------------------------------------------------
SCHN-02 2,678,450.53 425,661.86 2,139.65
---------------------------------------------------------------------------
SCHN-07 2,678,305.23 425,514.16 2,095.70
---------------------------------------------------------------------------
SCHN-08 2,678,307.15 425,518.55 2,095.74
---------------------------------------------------------------------------
SCHN-09 2,678,307.62 425,518.03 2,095.78
---------------------------------------------------------------------------
SCPV-01 2,678,828.90 425,524.04 2,247.98
---------------------------------------------------------------------------
---------------------------------------------------------------------------

----------------------------------------------------------------------------
----------------------------------------------------------------------------
Total

DDH ID Strike Dip Length (mts)
----------------------------------------------------------------------------
----------------------------------------------------------------------------
SCGP-07 S86.50 degrees E -60.48 degrees 231.00
----------------------------------------------------------------------------
SCGP-12 N75.30 degrees E -44.90 degrees 138.95
----------------------------------------------------------------------------
SCGP-13 N78.43 degrees E -74.95 degrees 202.95
----------------------------------------------------------------------------
SCGP-14 N76.27 degrees E -46.07 degrees 147.50
----------------------------------------------------------------------------
SCGP-15 N72.80 degrees E -69.20 degrees 230.40
----------------------------------------------------------------------------
SCGP-16 Vertical -89.60 degrees 161.95
----------------------------------------------------------------------------
SCGP-17 S82.65 degrees E -74.87 degrees 148.05
----------------------------------------------------------------------------
SCGP-18 Vertical -89.40 degrees 181.90
----------------------------------------------------------------------------
SCGP-19 N76.90 degrees E -37.10 degrees 121.95
----------------------------------------------------------------------------
SCGP-20 N78.40 degrees E -62.87 degrees 140.40
----------------------------------------------------------------------------
SCGP-23 N82.15 degrees E -75.13 degrees 182.85
----------------------------------------------------------------------------
SCGP-24 Vertical -89.48 degrees 200.50
----------------------------------------------------------------------------
SCHN-01 N83.50 degrees -65.00 degrees 267.90
----------------------------------------------------------------------------
SCHN-02 N83.50 degrees -85.00 degrees 167.70
----------------------------------------------------------------------------
SCHN-07 S86.50 degrees E -60.48 degrees 231.00
----------------------------------------------------------------------------
SCHN-08 S45.53 degrees E -59.87 degrees 172.20
----------------------------------------------------------------------------
SCHN-09 S45.96 degrees E -81.26 degrees 257.95
----------------------------------------------------------------------------
SCPV-01 N89.64 degrees E -49.92 degrees 267.90
----------------------------------------------------------------------------
----------------------------------------------------------------------------

Parameters
----------------------------------------------------------------------------
Grade Price Price
Metal Symbol Units Price Units Symbol
----------------------------------------------------------------------------
Gold Au g/t 1,688.53 $/t Oz Pau
----------------------------------------------------------------------------
Silver Ag g/t 31.7632 $/t Oz Pag
----------------------------------------------------------------------------
Copper Cu % 3.6817 $/t lb Pcu
----------------------------------------------------------------------------
Lead Pb % 1.0067 $/t lb Ppb
----------------------------------------------------------------------------
Zinc Zn % 0.9574 $/t lb Pzn
----------------------------------------------------------------------------
Note: Metal prices as of January 1st 2013. Recoveries are considered at 100%


Drilling is ongoing and results will be reported as assays are received from the laboratory. Gavilanes is a volcanic hosted, epithermal precious metal vein system. Drilling by previous operators totaled only 3,200 m. An historical resource estimated in 1990, which was not prepared in accordance with NI 43-101 contains an inferred resource of 1.2 million tonnes at 420 g/t Ag at the Guadalupe-Soledad-Aranzazu (GSA) vein on 500 meters of the known strike of 1,000 meters. (This estimate was performed by Minas de San Luis in 1990. The Company believes that the grade assays are representative of the structures and the resource has been called inferred, however the assumptions of continuity are unclear. Santacruz is unaware of more recent data on the property, and the same results have been repeated by Hochschild Mexico in 2008. Confirmation drilling needs to be completed with documented sampling and preparation procedures and a new model developed to determine whether there is a resource at Gavilanes that is compliant with NI 43-101. A qualified person has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves. Santacruz is not treating this historical estimate as current mineral resources).


Sampling and Laboratory


NQ-sized drill core was sawn in half at site and sent to ALS Chemex, a fully accredited and certified laboratory service. Samples were prepared at the ALS Chemex facility in Zacatecas, Mexico, and were assayed at ALS Chemex in Vancouver, Canada. All samples were analysed using a one assay ton fire assay with an AA finish Au and Ag (Au-AA23) and a 48 element ICP method for Pb, Zn and other elements (ME-MS61). A comprehensive QA/QC procedure is followed using standards, blanks and duplicates, all samples are randomly placed.


Qualified Person


Donald E. Hulse, P.E., SME-RM of Gustavson Associates LLC, is a qualified person under NI 43-101 and is independent of the Company, and has reviewed and approved the technical information contained in this press release.


Data Verification


Mr. Hulse verified the data disclosed in this release, including the sampling, analytical and test data underlying the information contained in this release. Verification included a review and validation of the applicable assay databases and reviews of assay certificates.


About Santacruz Silver Mining Ltd.


Santacruz is a Mexican focused silver company with a project in development (Rosario) and two advanced-stage exploration projects (San Felipe and Gavilanes). Rosario is expected to reach production at the end of the first quarter of 2013. The Company is managed by a technical team of professionals with proven track records in developing, operating and discovering silver mines in Mexico. Our corporate objective is to become a mid-tier silver producer.


Arturo Prestamo Elizondo, President, Chief Executive Officer and Director


Forward-looking information


Certain statements contained in this news release, such as potential mineralization on the Company's properties, the Company's exploration and development plans and anticipated production dates on the Company's mineral properties, constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company's financial condition and development plans do not change as a result of unforeseen events, that the Company obtains regulatory approval, future metal prices and the demand and market outlook for metals. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company's financial condition and development plans change, delays in regulatory approval, risks associated with the interpretation of data, the geology, grade and continuity of mineral deposits, the possibility that results will not be consistent with the Company's expectations, as well as the other risks and uncertainties applicable to mineral exploration and development activities and to the Company as set forth in the Company's Annual Information Form filed under the Company's profile at www.sedar.com. The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law.


This news release does not constitute an offer to sell or solicitation of an offer to sell any securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable securities laws or an exemption from such registration is available.


To view the Gavilanes 2012 drill hole location map, please visit the following link: http://media3.marketwire.com/docs/scz115-F1.pdf.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts:

Santacruz Silver Mining Ltd.

Neil MacRae

(604) 569-1609
info@santacruzsilver.com
www.santacruzsilver.com


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Santacruz Silver Mining Ltd.
Bergbau
A1JWYC
CA80280U1066

Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.