Highlights: Schematic cross section 17340 showing MA-18-305, Marathon Deposit Location of drill hole collars MA-18-304 to MA-18-308, Marathon Deposit Drilling MA-18-305 intersected 1.41 g/t Au over 105.0 meters including 4.59 g/t Au over 6.0 meters, 7.65 g/t Au over 4.0 meters, 4.90 g/t Au over 2.0 meters and 3.51 g/t Au over 2.0 meters as well as 14.97 g/t Au over 3.0 meters and 4.34 g/t Au over 3.0 meters. This
[...]