Kennady Diamonds Inc. Completes Successful Summer Program

11.09.2017  |  CNW
- Faraday 2 extended by 150 metres along strike
- Faraday 1 & 3 confirmed as one kimberlite


TORONTO, Sept. 11, 2017 - Kennady Diamonds Inc. ("Kennady Diamonds", the "Company") (TSX-V: KDI) today announces that the summer drilling program on the Kennady North Project has been successfully completed. The program commenced on July 4, 2017 and nine HQ diameter drill holes have been completed for a total of 2,766 metres. Since the update provided in the news release of August 4, 2017, these latest results include three holes on the Faraday 2 kimberlite and two holes on the Faraday 1 and 3 kimberlites.

President and CEO of Kennady Diamonds, Dr. Rory Moore commented: "We are very pleased with the results of the 2017 summer drilling program. By continuing the methodical approach to our drilling, we have successfully extended the Faraday 2 kimberlite a further 150 metres along strike. It is particularly noteworthy that the kimberlite has maintained a relatively constant depth as it tracks northwards. The total strike length of Faraday 2 now stands at approximately 600 metres, and the latest drilling will add significant tonnage to the high-grade resource potential of this kimberlite. The final hole of the program delivered a 64.6-metre kimberlite intercept, one of the longest kimberlite intercepts drilled on Faraday 2 to date."

Table 1 below summarizes the drill results on Faraday 2 since the August 4 news release.

Table 1:  2017 Summer Drill Program results for Faraday 2

Drill Hole

Target

Azimuth

Inclination

 

Kimberlite Intercepts (m)

End of
Hole
(m)

From

To

Intercept*

KDI-17-004

Faraday 2

315

-80

232.45

286.15

53.70

318

KDI-17-007

Faraday 2

237

-64

304.30

314.00

9.70**

352

KDI-17-008

Faraday 2

308

-80

234.70

299.28

64.58

326


*Intercepts not true widths.  **The drillhole deviated unexpectedly from its intended path, resulting in only a 9.7 m intercept at the lower margin of the kimberlite body.


Of the two drill holes completed on the Faraday 1 and 3 kimberlites, one was positioned to collect geotechnical as well as environmental data relevant to open pit and underground mining. The second hole was drilled to test the potential connection at depth between the Faraday 1 and 3 kimberlites. Kimberlite intercepts from both holes have established that the two pipes are joined at the northwestern tip of Faraday 1, and therefore, will in future be considered a single kimberlite body termed "Faraday 1-3".

Table 2 below summarizes the drill results on Faraday 1-3.

Table 2:  2017 Summer Drill Program results for Faraday 1-3

Drill Hole

Target

Azimuth

Inclination

 

Kimberlite Intercepts (m)

End of
Hole
(m)

From

To

Intercept*

KDI-17-005

Faraday 1-3

140

-55

160.44

175.65

15.21

298





178.85

180.90

1.60**

298

KDI-17-006

Faraday 1-3

235

-54

118.84

122.27

3.43

256





134.25

135.72

1.47

256





140.50

141.50

1.00

256





154.00

154.5

0.50

256





156.00

160.50

4.50

256





161.78

161.97

0.19

256





177.10

181.55

4.45

256





187.00

188.10

1.10

256


*Intercepts not true widths.  **Includes minor country rock intercepts.


Dr. Moore went on to say, "On behalf of Directors of Kennady, I extend sincere thanks and appreciation to the technical team at Aurora Geosciences Ltd. for delivering yet another highly successful drilling season without any lost time injuries.  The next step in the evaluation of the Faraday kimberlites will be the announcement of the maiden resource results, which are expected within the next week to ten days."


About Kennady Diamonds

Kennady Diamonds Inc. controls 100 percent of the Kennady North diamond project located in Canada's Northwest Territories. Kennady North is adjacent to the Gahcho Kué Diamond Mine, a joint venture between De Beers Canada (51%) and Mountain Province (49%), which started production in late 2016. Kennady is focused on expanding its high-grade diamond resources along the Kelvin – Faraday kimberlite corridor, as well identifying new kimberlites outside of the corridor. To date an indicated resource of 13.62 million carats of diamonds contained in 8.50 million tonnes of kimberlite, with a grade of 1.60 carats per tonne and an average value of US$63 per carat has been defined for the Kelvin kimberlite using a 1mm diamond bottom cutoff size. The Kelvin – Faraday corridor is also a target for further exploration.


Qualified Persons

This news release has been prepared by Dr. Rory Moore, P.Geo., President and CEO of Kennady Diamonds. The technical contents of this news release have been reviewed and approved by Dr. Tom McCandless, P. Geo., an independent director of Kennady Diamonds and Qualified Person under National Instrument 43-101.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) has reviewed or accepts responsibility for the adequacy or accuracy of this release.


FORWARD LOOKING INFORMATION

This news release includes certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, the Company's strategic plans, future operations, future work programs and objectives. Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.


Shares Issued and Outstanding: 50,912,599
SOURCE Kennady Diamonds Inc.



Contact

Kennady Diamonds Inc.
Dr. Rory O. Moore, President and CEO
(416) 640-1111
investors@kennadydiamonds.com
Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!



Mineninfo
Kennady Diamonds Inc.
Bergbau
-
-
Copyright © Minenportal.de 2006-2024 | MinenPortal.de ist eine Marke von GoldSeiten.de und Mitglied der GoldSeiten Mediengruppe
Alle Angaben ohne Gewähr! Es wird keinerlei Haftung für die Richtigkeit der Angaben und der Kurse übernommen!
Informationen zur Zeitverzögerung der Kursdaten und Börsenbedingungen. Kursdaten: Data Supplied by BSB-Software.